I can't help but think the Hadfield trials failed deliberately. The obvious answer if they couldn't keep time is to change the timetable.
I feel you could be right: the trials being considered a failure (as far as we're aware, anyway) never made much sense. Or instead of changing the timetable, the 331s should be able to keep up with the 323s on that route (right?), so the 350s replace 331s on some routes, which are then cascaded onto the Hadfield/Glossop line.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,310
Location
Oxford
I can't help but think the Hadfield trials failed deliberately. The obvious answer if they couldn't keep time is to change the timetable. One way for instance to gain extra time would be to operate services as a Manchester-Hadfield-Glossop-Manchester and Manchester-Glossop-Hadfield-Manchester "circular".
You'd think that newer longer trains with air conditioning would offset the objections to such a thing. I wouldn't think the traffic between Hadfield and Glossop would amount to much in terms of value, and nobody else is likely to be inconvenienced. Though that wouldn't help with any of the other routes that they might operate on (would the 110mph top speed help on the Stoke/ Crewe runs?)

Maybe once the units have mouldered in the sidings for a couple of years they'll try it.
 

lowe1409

Member
Joined
6 Feb 2024
Messages
285
Location
Cheshire
I can't help but think the Hadfield trials failed deliberately. The obvious answer if they couldn't keep time is to change the timetable. One way for instance to gain extra time would be to operate services as a Manchester-Hadfield-Glossop-Manchester and Manchester-Glossop-Hadfield-Manchester "circular".
Would make sense to drop the frequency to hourly between hadfield and Glossop to keep timings if it'd work. Also, how unpopular would it be just to sever the direct connection entirely be? Could allow a more frequent service on the line if it's say run as every 30 minutes to each giving the core line a service every 15.

If northern really wanted the trains, I'm sure they'd have done more by now. Maybe they're just trying to make a contingency plan incase this next rolling stock rollout doesn't go to plan?
 

Rail Quest

Member
Joined
8 Apr 2023
Messages
759
Location
Warrington
If northern really wanted the trains, I'm sure they'd have done more by now.
Or could it be the DfT who are blocking Northern from acquiring 350/2s? Maybe their thought process is, given the new fleet is technically on the horizon (though new units won't be in service for many years yet), they don't want Northern to be spending money procuring a replacement in the meantime. (To be clear, I don't agree with this logic, if so)
 

Class 466

Established Member
Joined
5 Mar 2010
Messages
2,139
Location
Atherton, UK
I can't help but think the Hadfield trials failed deliberately. The obvious answer if they couldn't keep time is to change the timetable. One way for instance to gain extra time would be to operate services as a Manchester-Hadfield-Glossop-Manchester and Manchester-Glossop-Hadfield-Manchester "circular".
at some point 323s are going to have to be replaced by something, 331s door release times are still painfully slow at times, and it's not exactly speedy on 323s. I think you're right in the sense that the odds were artificially stacked against them before one had even run along there. The timing difference probably wouldn't even need to be that great overall.

== Doublepost prevention - post automatically merged: ==

Has that got anything to do with the fact they're running out of spare parts and I'd be impressed if they last until northerns fleet replacement.

I know the Glossop trial was a failure but didn't they also do one on the Manchester blackpools? How did that go? As well, could they not be used on the stokes the crewes? The former certainly has some longer stop spacing where their full speed could be utilised.
They were also trialled on Liverpool - Airport, a route that is currently poor performing anyway and needs revision in some way. So most likely another example of failed the test before it started, despite the current fleet probably also failing said test
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,362
Location
Yorkshire
I can't help but think the Hadfield trials failed deliberately. The obvious answer if they couldn't keep time is to change the timetable. One way for instance to gain extra time would be to operate services as a Manchester-Hadfield-Glossop-Manchester and Manchester-Glossop-Hadfield-Manchester "circular".
Nobody would be suggesting this if the 350/2s weren't homeless though. Indeed if someone did they'd probably get shouted down for adding another "microfleet".
Changing the timetable in order to work more efficiently is one thing, changing it to increase overall capacity by using the "circular" pattern you suggest is something that certainly used to happen in the peaks, not sure if it does now... though that method can only be used in one direction at a time anyway. Changing the timetable wholesale just to give a home to units left homeless by their owning ROSCO backing the wrong horse is a step too far in my book (even if it is the very same ROSCO that owns the 323s). Who's paying for the overtime needed to accommodate type training for crews and depot staff?
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,310
Location
Oxford
Nobody would be suggesting this if the 350/2s weren't homeless though. Indeed if someone did they'd probably get shouted down for adding another "microfleet".
Changing the timetable in order to work more efficiently is one thing, changing it to increase overall capacity by using the "circular" pattern you suggest is something that certainly used to happen in the peaks, not sure if it does now... though that method can only be used in one direction at a time anyway. Changing the timetable wholesale just to give a home to units left homeless by their owning ROSCO backing the wrong horse is a step too far in my book (even if it is the very same ROSCO that owns the 323s). Who's paying for the overtime needed to accommodate type training for crews and depot staff?
It's not just to find a home for the 350s though, it'd be about replacing rolling stock which is nearly life expired with newer, (theoretically) higher quality/ capacity trains.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,362
Location
Yorkshire
It's not just to find a home for the 350s though, it'd be about replacing rolling stock which is nearly life expired with newer, (theoretically) higher quality/ capacity trains.
But if the replacements aren't suitable, they aren't suitable. It's a bit baffling that Glossop is always the "go-to" place to put them considering the constraints of that line. Stokes, Crewes etc. are more suited to 350s but AIUI all the West side electrics interwork to some extent.
We can have a uniform fleet, or we can have a wider range of different train types which are each better-suited to a more limited selection of work. It all comes down to priorities.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,685
Location
"Marston Vale mafia"
It's not just to find a home for the 350s though, it'd be about replacing rolling stock which is nearly life expired with newer, (theoretically) higher quality

I would absolutely say a 350/2 is wildly higher quality than a 323. They are great units. 3+2 is not my favourite but these are short journeys and the seats are good and the legroom is capacious. Plus there's reliable aircon

If that meant a few minutes on the end to end journey time I'd not mind. Ormskirk-Liverpool having gone from 25 minutes in the 1980s to about 35 now doesn't seem to have bothered anyone, they probably haven't even noticed. It's "about half an hour" and that's all people care about on this sort of urban local stopping run.
 
Last edited:

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,310
Location
Oxford
if the replacements aren't suitable, they aren't suitable
Absolutely, but if the prize is an overall higher quality product then it's worth considering whether the requirement of doing exactly what we do now can be flexed a little to provide significant improvements for the vast majority of users - I'm not pre-determining the answer on that, perhaps it can't be made to fit.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,685
Location
"Marston Vale mafia"
Absolutely, but if the prize is an overall higher quality product then it's worth considering whether the requirement of doing exactly what we do now can be flexed a little to provide significant improvements for the vast majority of users - I'm not pre-determining the answer on that, perhaps it can't be made to fit.

That would presumably be an issue if it meant adding a unit into the diagram - but while they will lose time I can't see them losing that much time.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,820
Location
West of Andover
But if the replacements aren't suitable, they aren't suitable. It's a bit baffling that Glossop is always the "go-to" place to put them considering the constraints of that line. Stokes, Crewes etc. are more suited to 350s but AIUI all the West side electrics interwork to some extent.
We can have a uniform fleet, or we can have a wider range of different train types which are each better-suited to a more limited selection of work. It all comes down to priorities.
Isn't one issue with the Stoke line is the bay platform is a very tight fit for a 350?
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,192
Location
West Wiltshire
Or could it be the DfT who are blocking Northern from acquiring 350/2s? Maybe their thought process is, given the new fleet is technically on the horizon (though new units won't be in service for many years yet), they don't want Northern to be spending money procuring a replacement in the meantime. (To be clear, I don't agree with this logic, if so)
I'm in same thought camp, if new units were in process of being built then no, but as new units are still just at the paper appraisal and maybe one day an actual order stage, not taking what is available now seems bonkers.

Either DfT is into gambling, that is gambling that lease co will cut the price of 350s sometime in next year or three, or they are convinced Northern order won't be delayed (even though I personally can see it being 2031 at earliest before any new Northern replacements enter service)
 

TransportHub

Member
Joined
20 May 2015
Messages
178
Location
London
Given that the logic for LNR keeping the 350/1s but not the /2s was the undesirable 3+2 seating. Would it be possible to swap the interior seats between them? So the /2s return to LNR with 2+2 seats and the /1s have 3+2 and third rail capability, the /1s could then go straight to Southeastern to replace some networkers (maybe 458s too)
 

JamesT

Established Member
Joined
25 Feb 2015
Messages
4,899
Given that the logic for LNR keeping the 350/1s but not the /2s was the undesirable 3+2 seating. Would it be possible to swap the interior seats between them? So the /2s return to LNR with 2+2 seats and the /1s have 3+2 and third rail capability, the /1s could then go straight to Southeastern to replace some networkers (maybe 458s too)
I was under the impression the primary reason for ditching the /2s was their expensive leasing terms. They're owned by Porterbrook unlike the other subclasses which are owned by Angel Trains.
 

Liam L

Established Member
Joined
19 Jun 2020
Messages
1,425
Location
Birmingham
Has that got anything to do with the fact they're running out of spare parts and I'd be impressed if they last until northerns fleet replacement.

I know the Glossop trial was a failure but didn't they also do one on the Manchester blackpools? How did that go? As well, could they not be used on the stokes the crewes? The former certainly has some longer stop spacing where their full speed could be utilised.
I think the problem with the 323 spares is the long wait times to get the spares in.

Id imagine the DFT might not want to fund the leasing costs as the same as why WMT ditched the units and training costs for the 350/2 if there new stock is suppose to be on its way in the next 5-10 years?
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,192
Location
West Wiltshire
Given that the logic for LNR keeping the 350/1s but not the /2s was the undesirable 3+2 seating. Would it be possible to swap the interior seats between them? So the /2s return to LNR with 2+2 seats and the /1s have 3+2 and third rail capability, the /1s could then go straight to Southeastern to replace some networkers (maybe 458s too)
They are owned by different companies, so would be contractually difficult.

However it would be possible for an operator to lease the units, refurbish them with new seating etc, especially if they wanted the units for number of years. Of course if this happens is more economic than technical reasons
 

stan claire

Member
Joined
26 Feb 2022
Messages
119
Location
BuckshawParkwa
I know the Glossop trial was a failure but didn't they also do one on the Manchester blackpools?
I haven’t heard of that but they probably wouldn’t want to do that as they’d be replacing 6 car sets (well, sometimes anyway) with 4 and it is quite a busy route unless they fitted the /2s with SDO/ASDO and ran them as 8 car (which would be a dream to be fair)
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,716
That would presumably be an issue if it meant adding a unit into the diagram - but while they will lose time I can't see them losing that much time.
It would need another unit, Hadfield is nominally a 3 minute turnaround as is Glossop, Picc 8. It doesn't need much extra for that to become a problem at Picc, 2 minutes extra each way and you're in trouble.
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,880
It would need another unit, Hadfield is nominally a 3 minute turnaround as is Glossop, Picc 8. It doesn't need much extra for that to become a problem at Picc, 2 minutes extra each way and you're in trouble.
The circular idea would deal with that problem.

And have the added benefit of making it straightforward to yellow-pen all of the branch.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,162
But if the replacements aren't suitable, they aren't suitable. It's a bit baffling that Glossop is always the "go-to" place to put them considering the constraints of that line. Stokes, Crewes etc. are more suited to 350s but AIUI all the West side electrics interwork to some extent.
We can have a uniform fleet, or we can have a wider range of different train types which are each better-suited to a more limited selection of work. It all comes down to priorities.
Potentially you could split the Windermere to Manchester Airports into an Oxenholme - Man Airport and Windermere branch shuttle too, it might be unpopular but it would represent a great opportunity to add capacity on the busiest section and redeploy some 195s to see off the worst of the 15x units.

If the OHLE overrun at Carnforth is long enough for a turnaround, you could split the Barrow service there, although I think that would be significantly more unpopular with the isolation of Furness in general and issues with punctuality on the WCML having a greater impact at Carnforth than somewhere like Oxenholme with a more frequent service.
 

I'm here now

Member
Joined
26 Aug 2023
Messages
241
Location
Cornwall
Potentially you could split the Windermere to Manchester Airports into an Oxenholme - Man Airport and Windermere branch shuttle too, it might be unpopular but it would represent a great opportunity to add capacity on the busiest section and redeploy some 195s to see off the worst of the 15x units.

If the OHLE overrun at Carnforth is long enough for a turnaround, you could split the Barrow service there, although I think that would be significantly more unpopular with the isolation of Furness in general and issues with punctuality on the WCML having a greater impact at Carnforth than somewhere like Oxenholme with a more frequent service.
Couldn’t Windermere be 2tph if that was the case?
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,820
Location
West of Andover
.
I haven’t heard of that but they probably wouldn’t want to do that as they’d be replacing 6 car sets (well, sometimes anyway) with 4 and it is quite a busy route unless they fitted the /2s with SDO/ASDO and ran them as 8 car (which would be a dream to be fair)
Considering Glossop is pretty much solo 323s, there isn't any 6 coach sets which will be replaced. I'm pretty sure the only Northern EMU line which sees 6 coach trains in the North West is Manchester Airport - Blackpool North with a couple 6 coach diagrammed for the Liverpool Lime Street - Manchester Airport stoppers
 
Last edited:

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,641
Location
Greater Manchester
I'm pretty sure the only line which sees 6 coach trains in the North West is Manchester Airport - Blackpool North with a couple 6 coach diagrammed for the Liverpool Lime Street - Manchester Airport stoppers
And a few Airport - Cumbria (double 195/1s)


and the non-Northern:
most TPE 185 services
Some Liverpool-Norwich services
and Lumo but they pretty much only pass through
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,849
Location
Epsom
19 minutes each way does not get you a half hourly service, it gets you hourly. Double the journey time for both ways!
Oh d'oh yes - I forgot the return journey didn't I?! :lol:

For what it's worth, I think it should be doubled and the service boosted ( at least in summer ) anyway.
 