zwk500
Veteran Member
Another significant downside would be incurring all the costs of certifying vehicles and drivers to mainline standard.The use of tram train vehicles on the Metrolink Altrincham line would enable the reinstatement of the previous (pre-July 1991) conventional double track layout through Navigation Road station. This would eliminate delays to Metrolink services caused by the single line section. A significant downside would be that freight and Northern passenger services would potentially be delayed by Metrolink services. At the moment they have their own dedicated tracks.
Keep modes operationally separate as far as possible.