At no point has there been a suggestion that people won't get on the HS2 trains. Nor does the classic line need any more people being encouraged on to the train.Rory Sutherland's view:
I'm sorry you've completely lost me here.BTW, Jony Ive designed the Smart Phone.
You never fully looked at the vid or understood it. Jony Ive, an English guy, did. I never made it up. Jony Ive significantly contributed to the modern smartphone as a lead design engineer. He, alongside Steve Jobs developed the original iPhone. Can can add value to trains as well.I'm sorry you've completely lost me here.
He's completely wrong about the purpose of HS2. It was never principally about speed, it was always capacity.Rory Sutherland's view:
He's completely wrong about the purpose of HS2. It was never principally about speed, it was always capacity.
And? What can he bring to the question of how to solve congestion on the WCML South?Jony Ive, an English guy, did. I never made it up. Jony Ive significantly contributed to the modern smartphone as a lead design engineer. He, alongside Steve Jobs developed the original iPhone.
If the whole thing has been designed on apple products it would be the same but using very expensive IT equipment?And? What can he bring to the question of how to solve congestion on the WCML South?
Who is Rory Sutherland? Why should I care what his views are?Rory Sutherland's view:
Look at the vid again.And? What can he bring to the question of how to solve congestion on the WCML South?
Marketing. Giving the punter what he wants. HS2 was not one of the wants or needs.An advertising executive.
Wishful thinking. HS2 is clearly cancelled. Some of the land was kept in case NPR may use it. There is a planned dead end stub facing north at Fradley in case there is an extension, possibly for a WCML Stafford bypass. Whether this makes it to construction is a different matter, nevertheless the stub is still on the plan.When they get HS2 (or whatever they then call it) extended towards Crewe, would it be possible build that extention to the original 360kph ....
The 2A land isn't lost.Wishful thinking. HS2 is clearly cancelled. Some of the land was kept in case NPR may use it. There is a planned dead end stub facing north at Fradley in case there is an extension, possibly for a WCML Stafford bypass. Whether this makes it to construction is a different matter, but the stub is still on the plan.
True. Most Phase 2a land has not yet been sold for sure. But the government is preparing broader HS2 land disposals. Some strategically useful sections may well be retained rather than disposed of immediately. The climate towards HS2 indicates the land will be sold. The only saviour is if Burnham becomes PM as he may save the land. But shouting for money for a high speed line to Manchester when mayor and giving the money out of central coffers when PM is another matter.The 2A land isn't lost.
I did. At no point does he mention capacity. In fact with his focus on business class seats he would be reducing capacity.Look at the vid again.
No it doesn't. The southern WCML is designated as "congested infrastructure".BTW, the existing network gives all the capacity needed.
The punters want a seat at a reasonable price. The way to achieve that is to run 400m trains on infrastructure that can take them.Marketing. Giving the punter what he wants. HS2 was not one of the wants or needs.
Sutherland was clearly on about improving the experience on trains. Not about making it better only for 1st class. The journey time, and experience, is from when entering the station and leaving the station at the other end. Making the whole package efficient and pleasant is the point he is clearly making. You clearly never got that. Or had selective amnesia.I did. At no point does he mention capacity. In fact with his focus on business class seats he would be reducing capacity.
No it doesn't. The southern WCML is designated as "congested infrastructure".
The punters want a seat at a reasonable price. The way to achieve that is to run 400m trains on infrastructure that can take them.
Oh I got it. But he was presenting the idea of installing some better seats and providing some nibbles as an alternative to HS2, because he thinks that the project is merely about speed.You clearly never got that.
What makes you think that Chiltern has capacity? And how can it serve the people of Milton Keynes or Northampton?So, if more trains are needed to Liverpool, Mcr or Glasgow over the ten trains per hour out of Euston, Birmingham trains can still be sent via an upgraded Chiltern.
I did. At no point does he mention capacity. In fact with his focus on business class seats he would be reducing capacity.
No it doesn't. The southern WCML is designated as "congested infrastructure".
The punters want a seat at a reasonable price. The way to achieve that is to run 400m trains on infrastructure that can take them.
AlexSJW surely provides very clear evidence that the southern WCML is not congested ?I did. At no point does he mention capacity. In fact with his focus on business class seats he would be reducing capacity.
No it doesn't. The southern WCML is designated as "congested infrastructure".
The punters want a seat at a reasonable price. The way to achieve that is to run 400m trains on infrastructure that can take them.
Such confusion. It was abundantly clear what Sutherland was proposing. I am not going to explain it to you blow by blow.Oh I got it. But he was presenting the idea of installing some better seats and providing some nibbles as an alternative to HS2, because he thinks that the project is merely about speed.
It is not. It is about capacity. The WCML is full.
What makes you think that Chiltern has capacity? And how can it serve the people of Milton Keynes or Northampton?
Any congestion can be addressed by longer trains, removing bottlenecks, in-cab signals and upgrading the Chiltern Line taking B'ham/West Mids trains off the WCML. It is not rocket science.AlexSJW surely provides very clear evidence that the southern WCML is not congested ?
So the experts at Network Rail who concluded you cannot get anywhere near the benefits of HS2 by upgrading the existing network, and you still need a new line because the WCML is full are wrong? And you and a random marketer off the internet are right?Such confusion. It was abundantly clear what Sutherland was proposing. I am not going to explain it to you blow by blow.
There is not a capacity issue that the existing network, even by opening the odd line or two, cannot absorb. HS2 was built for speed, speed and speed, spending a fortune on making the track straight and level. On initial announcement it was all speed, speed and speed.
If they had taken the Rory Sutherland approach fifteen years ago we now would have had a finished high class Swiss type of inter-city rail network, being the envy of the world.
Any congestion can be addressed by longer trains, removing bottlenecks, in-cab signals and upgrading the Chiltern Line taking B'ham/West Mids trains off the WCML. It is not rocket science.
One of the criticisms of Lord Berkeley was that no serious study was undertaken to upgrade the existing network. If you had been following HS2 you would know this.So the experts at Network Rail who concluded you cannot get anywhere near the benefits of HS2 by upgrading the existing network, and you still need a new line because the WCML is full are wrong? And you and a random marketer off the internet are right?
So what's this then? https://www.gov.uk/government/publications/review-of-strategic-alternatives-to-high-speed-twoTransport Secretary finally admits HS2 is a vanity project! She says:
"it was a massively over-spec'd folly with the prospect of the fastest train anywhere in the world tickling the fancy of Conservative ministers"
One of the criticisms of Lord Berkeley was that no serious study was undertaken to upgrade the existing network. If you had been following HS2 you would know this.
He provides opinions, not evidence. Network Rail have provided evidence to the ORR.AlexSJW surely provides very clear evidence that the southern WCML is not congested ?
The first item in the strategic case was about capacity. Capacity is referred to over and over again in the business case.There is not a capacity issue that the existing network, even by opening the odd line or two, cannot absorb. HS2 was built for speed, speed and speed, spending a fortune on making the track straight and level. On initial announcement it was all speed, speed and speed.
No we wouldn't. Because you're never going to solve our overcrowding problems by making the seats a bit more comfortable and providing WiFi onboard.If they had taken the Rory Sutherland approach fifteen years ago we now would have had a finished high class Swiss type of inter-city rail network, being the envy of the world.
So there is the new cost for upgrading the Chilterns then.West Mids/B'ham trains can go via an upgraded diesel Chiltern Line, as they once did, taking them off the WCML. Mcr trains could have left the WCML at Stone, they do now, again giving more capacity. Make the WCML all 4-track north of Crewe to Warrington, again giving more capacity.
The existing network as it is can handle extra capacity. Longer trains can be used. But HS2 is being built to Handsacre. So, if more trains are needed to Liverpool, Mcr or Glasgow over the ten trains per hour out of Euston, Birmingham trains can still be sent via an upgraded Chiltern. But a Chiltern with a vastly improved and attractive ride experience in the stations and trains.
It doesn'tWhat makes you think that Chiltern has capacity?
So removing bottlenecks, upgrading the Chilterns, resignalling to ETCS isn't a result of not having capacity then? What happens once growth outstrips longer trains?There is not a capacity issue that the existing network, even by opening the odd line or two, cannot absorb. HS2 was built for speed, speed and speed, spending a fortune on making the track straight and level. On initial announcement it was all speed, speed and speed.
Any congestion can be addressed by longer trains, removing bottlenecks, in-cab signals and upgrading the Chiltern Line taking B'ham/West Mids trains off the WCML. It is not rocket science.
That was heavily critised as being too shallow.So what's this then? https://www.gov.uk/government/publications/review-of-strategic-alternatives-to-high-speed-two
Lord Berkeley comes across as very bitter that the Oakervee Review didn't agree with him and seems determined to rubbish everything about the project.
I've been posting on this forum about HS2 for about a decade, I've not just started following HS2.
That is a long time into the future. But.....What happens once growth outstrips longer trains?
Sop telling yourself lies and believing them.
As Alex implies take passenger off Euston onto the underused and equally fast Chiltern to free up capacity for freight on the WCML.That was heavily critised as being too shallow.
That is a long time into the future. But.....
Keeping the OOC to Aylesbury section then running onto an upgraded Chiltern with longer trains to Birmingham. Also from north of Rugby largely reuse the Gt.Central trackbed to Aylesbury then branch into HS2 to London. Two ways into London. WCML splits at Rugby. WCML services into Euston and OOC.
Sop telling yourself lies and believing them.
Call yourself what you like, your arguments still don't add up.Sop telling yourself lies and believing them.
You have been slaughtered, in your futile attempt to justify one billion per mile.Call yourself what you like, your arguments still don't add up.
The current transport minister, is just continuing the 'blame the tories' rhetoric.Transport Secretary finally admits HS2 is a vanity project! She says:
"it was a massively over-spec'd folly with the prospect of the fastest train anywhere in the world tickling the fancy of Conservative ministers"
One of the criticisms of Lord Berkeley was that no serious study was undertaken to upgrade the existing network. If you had been following HS2 you would know this.
I haven't justified the cost of HS2. It has been inflated by political meddling, poorly written contracts, a planning system not fit for national infrastructure projects, and external factors beyond the control of the DfT (materials inflation caused by covid and the Russian invasion of Ukraine).You have been slaughtered, in your futile attempt to justify one billion per mile.