brad465
Veteran Member
The Beckenham Jct peak services are normally 5-car in the morning at 2tph frequency, and 4-car in the evening at 1tph frequency (2 return trips). The latter used to be 6-car, but I'm guessing the lack of 466s has impacted this.Thanks for the summary. This looks the big cut, 50% reduced service at peak time with no scope to lengthen the services. The peak time extras to Blackfriars might be longer, Orpington & Bromley South passengers could switch to the Tunbridge Wells - Victoria services, but unsure if that's enough.
There's scope to lengthen both to 8-car, although it's a shame the evening peak frequency isn't being increased in this period. I wouldn't be surprised if the Tunbridge Wells' extras are reduced from 10 to 8-car during this, as some platforms at Victoria can't take more than 8-car, and the ones that do will likely be taken already, especially during this period.
I suspect though the reduced Orpington-Victoria frequency won't just free up paths, but will also allow other services into London Bridge to be lengthened. I can see more 12-car diagrams for sure, especially as Cannon St and London Bridge don't have the issues found at Charing X.
Fair points.The timetable is put together partially on the basis of those turnarounds at Charing Cross. London Bridge is 7 minutes down the road making a 10 minute turnaround grow to 24 minutes at London Bridge.
That will be a big limitation alongside working within the existing timetable. Platform 9 has 4tph making 10tph total and each must use that single line once either arriving or departing.