Might as well make a list:

220001 - Undergoing Refurbishment at Derby
220002 - Unrefurbished - In Service
220003 - Unrefurbished - In Service
220004 - Unrefurbished - In Service
220005 - Unrefurbished - In Service (Pride Livery)
220006 - Undergoing Refurbishment at Derby
220007 - Unrefurbished - In Service

220008 - Unrefurbished - In Service
220009 - Unrefurbished - In Service (Hixon)
220010 - Unrefurbished - In Service
220011 - Unrefurbished - In Service
220012 - Unrefurbished - In Service
220013 - Unrefurbished - In Service
220014 - Unrefurbished - In Service
220015 - Unrefurbished - In Service
220016 - Unrefurbished - In Service (Voyager20)
220017 - Unrefurbished - In Service
220018 - Unrefurbished - In Service
220019 - Unrefurbished - In Service
220020 - Unrefurbished - In Service
220021 - Undergoing Refurbishment at Derby
220022 - Unrefurbished - In Service

220023 - Refurbished - In Service
220024 - Unrefurbished - In Service
220025 - Refurbished - In Service
220026 - Unrefurbished - In Service
220027 - Refurbished - In Service
220028 - Refurbished - In Service
220029 - Unrefurbished - In Service
220030 - Unrefurbished - In Service
220031 - Unrefurbished - In Service
220032 - Unrefurbished - In Service
220033 - Refurbished - In Service
220034 - Unrefurbished - In Service
021 left Litchurch Lane for Voyagerland yesterday. Not sure which has replaced it.
 

The Ham

Veteran Member
Joined
6 Jul 2012
Messages
12,021
Switching a 5 car diagram to a 2x4 car diagram will result in a big increase in capacity, and releases a 5 car set to strengthen a previous 4 car set diagram, which then releases another 4 car set to help double up another diagram. From my bedroom window (between Bristol and Taunton) I see many more double sets now than I did before.

The use of the 5 extra units would have allowed for (not trying to work out for parts of Diagrams, as that gets complex, how've needless to say would show a larger chance of pairs of units):

Diagram A (was 4 coach) to be run by no.1 of the new 5 coach sets
Diagram B (was 4 coach) to swap with Diagram C to be a 5 coach set
Diagram C (was 5 coach) to be run as 4+4
Diagram D (was 4 coach) to be run by no.2 of the new 5 coach sets
Diagram E (was 4 coach) to swap with Diagram F to be a 5 coach set
Diagram F (was 5 coach) to be run as 4+4
Diagram G (was 4 coach) to be run by no.3 of the new 5 coach sets
Diagram H (was 4 coach) to swap with Diagram I to be a 5 coach set
Diagram I (was 5 coach) to be run as 4+4
Diagram J (was 4 coach) to be run by no.4 of the new 5 coach sets
Diagram K (was 4 coach) to swap with Diagram L to be a 5 coach set
Diagram L (was 5 coach) to be run as 4+4
Diagram M (was 4 coach) to be run by no.5 of the new 5 coach sets
Diagram N (was 4 coach) to swap with Diagram O to be a 5 coach set
Diagram O (was 5 coach) to be run as 4+4

That's 15 Diagrams, which is likely to be up to 60 different trains (assuming each diagram can run A to B, B to A, A to B and B to A again, which isn't always the case).

Although, that is enough for around 30% of the 220's in pairs.

However, even if each Diagram only goes and then comes back that's quite a few extra seats available (I'll count total extra) across the day that's an extra 2,460 seats.

Obviously you have to factor in the loss of the HST sets. That's a loss of 45 seats compared to the 4+4 trains (although that's split by class of 28 fewer standard and 17 fewer first class seats, the latter probably being felt less keenly).

Doing the same (2 trips per day for each of the 5 sets) that's 890 seats "lost" bringing the total of extra seats to 1,570 across the day (minimum).

However that's against (again based on 2 services a day per unit) 25,900 total seats (+6.06%).

However, with around 170 services a day run by the 22x fleets and only having 59 units, it's closer to an average of 3 trips per unit per day which would increase that capacity increase a little, especially if the former HST's didn't previously do 3 trips.

As I said at the start if parts of routes (i.e. are pairs in the core but single units for the outer reaches) are strengthened then that would show a larger increase.

Whilst not significant (and obviously not evenly spread) a sightly better than 5% increase (even when compared against the with HST's, and assuming only two trips per unit) in total seating isn't too bad.

Obviously, this is fairly rough and ready, as I'm not accounting for spares, or which services are run by what length of train, etc. However, it should help illiterate that it appears that the 5 extra 221's will be sightly better than have keeping the HST's.

One final point, for each extra 221 brought into use for XC from now onwards (if that were to be a thing and as it wouldn't have to replace the HST's seating capacity) that would see daily seating capacity rise by 1.9% when compared to the baseline of the seats in use when the HST's were in use (so one extra would bring the total to +7.9% whilst 5 would be +15.5%).
 

cats_five

Member
Joined
19 Sep 2021
Messages
228
Location
Scotland
When should this be finished? I will probably be going from EDI to Penzance in October, hope to travel in a refurbished coach.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,061
When should this be finished? I will probably be going from EDI to Penzance in October, hope to travel in a refurbished coach.
XC has about 70 units, and a refurbished unit is currently been released every couple of weeks, so it's going to take a couple of years to get through them all, even if the rate is accelerated.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,609
Location
Hampshire
XC has about 70 units, and a refurbished unit is currently been released every couple of weeks, so it's going to take a couple of years to get through them all, even if the rate is accelerated.
Seems to be one a week for the 220s, with 2 to 3 units at Litchurch Lane at any given time. There’s a small possibility it could take little longer for the 221s given the extra vehicle, but given the rate Alstom are getting through them I’d expect most of the fleet to be refurbished by October - certainly Alstom have completed 10 out of 34 already.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,061
Seems to be one a week for the 220s, with 2 to 3 units at Litchurch Lane at any given time. There’s a small possibility it could take little longer for the 221s given the extra vehicle, but given the rate Alstom are getting through them I’d expect most of the fleet to be refurbished by October - certainly Alstom have completed 10 out of 34 already.
One a week appears optimistic given post 2021. And only 6 complete according to the list in post 2037, unless you now different?
 

FlybeDash8Q400

Established Member
Joined
26 Jun 2018
Messages
3,006
Location
Edinburgh
One a week appears optimistic given post 2021. And only 6 complete according to the list in post 2037, unless you now different?
I think we’re talking about a unit being swapped in and out each week. It’s taking about 3 weeks to do each one. The first few always take way longer and then after that it’s basically a mini production line with as suggested, one finished every week.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
XC has about 70 units, and a refurbished unit is currently been released every couple of weeks, so it's going to take a couple of years to get through them all, even if the rate is accelerated.

By October though, the chances of getting a refurb unit, even at the current rate will probably be well over 50%.
 

FlybeDash8Q400

Established Member
Joined
26 Jun 2018
Messages
3,006
Location
Edinburgh
By October though, the chances of getting a refurb unit, even at the current rate will probably be well over 50%.
I don’t think it will be. There’s only about 20-25 weeks until that particular day in October, depending on when it was. Litchurch Lane also has its annual shut down towards the end of the summer, as this is what made The Greatest Gathering possible in the first place.

I made a suggestion in a previous post that the end of the year for the completion for the 220’s is more realistic. I would probably stick with that as a rough idea. The 34 220’s alone make up about 50% of the units. There are 36 221’s in XC’s fleet.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,061
I don’t think it will be. There’s only about 20-25 weeks until that particular day in October, depending on when it was. Litchurch Lane also has its annual shut down towards the end of the summer, as this is what made The Greatest Gathering possible in the first place.

I made a suggestion in a previous post that the end of the year for the completion for the 220’s is more realistic. I would probably stick with that as a rough idea. The 34 220’s alone make up about 50% of the units. There are 36 221’s in XC’s fleet.
That's in line with my thinking in post 2050 (which got shot down as too conservative).
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
I don’t think it will be. There’s only about 20-25 weeks until that particular day in October, depending on when it was. Litchurch Lane also has its annual shut down towards the end of the summer, as this is what made The Greatest Gathering possible in the first place.

I made a suggestion in a previous post that the end of the year for the completion for the 220’s is more realistic. I would probably stick with that as a rough idea. The 34 220’s alone make up about 50% of the units. There are 36 221’s in XC’s fleet.

Makes sense, I didn't know about the annual shutdown, that seems a very old fashioned thing to do.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,061
Makes sense, I didn't know about the annual shutdown, that seems a very old fashioned thing to do.
Probably because we have much less of the type of industry for which it makes a lot of sense for the company, as opposed to trying to work around large proportions of your employees being off over a six week period whilst keeping the production line going.
 

voyagerdude220

Established Member
Joined
13 Oct 2005
Messages
4,247
Are the refurbishments causing set shortages? Looking on the Cross Country journey check page, it seems like a few Voyager diagrams a short formed today, with 4/5 cars instead of a double set.
 