Polarbear
Established Member
Back in the day, Manchester Victoria to Holyhead was a fairly regular one in the north west. About 125 miles each way.
That's a short journey. Cambridge-Birmingham, which I have done frequently, was 137 miles.Back in the day, Manchester Victoria to Holyhead was a fairly regular one in the north west. About 125 miles each way.
A student friend of mine from Lowestoft c50 years ago referred to the units on services such as this as "bog cars". Unsure whether this was widely used terminology.Norwich-Birmingham was 175 miles and ran every weekday 1968-77.
Ah - that I think was the description I probably misheard as "bog cars".I heard "bog carts" fairly widely in the 1980s
Also known as "fart carts"!I heard "bog carts" fairly widely in the 1980s
All variations of the same thing, I've seen:"Bog unit" was the local spotters term for them round my way - although I originally misheard it as "Bug Unit"
That used the "Inter City" final build of Swindon dmus, which on weekdays were running commuter services to Paddington. When new in the 1960s they ran a daily return through train from Cardiff to Paignton and Plymouth, dividing at Newton Abbot, I used to see the 8-car formation growling out of Taunton westbound mid-morning. Goodness knows what performance was like going up Dainton; after a year or so they were moved on and a Hymek loco-hauled train was substituted.If I remember correctly, up to the beginning of the 1980s there was an Oxford-Paignton and return DMU that ran on Summer Saturdays only; I think it ran via Bristol. It was one of the first of the Down daytime trains that would keep us busy for several hours.
They were used on the evening fast service to Maidenhead, Twyford and Henley in the early 1970s. The interiors were the same as Mk1s complete with second class compartments. They didn't build that many which is perhaps a surprise as they could have been suitable for longer distance services. It may have been the 70 mph top speed that precluded wider use and also saw them banished from the London area mains so as not to hold up the then new 125 mph IC125s.That used the "Inter City" final build of Swindon dmus, which on weekdays were running commuter services to Paddington.
That used the "Inter City" final build of Swindon dmus, which on weekdays were running commuter services to Paddington. When new in the 1960s they ran a daily return through train from Cardiff to Paignton and Plymouth, dividing at Newton Abbot, I used to see the 8-car formation growling out of Taunton westbound mid-morning. Goodness knows what performance was like going up Dainton; after a year or so they were moved on and a Hymek loco-hauled train was substituted.
They were used on the evening fast service to Maidenhead, Twyford and Henley in the early 1970s. The interiors were the same as Mk1s complete with second class compartments. They didn't build that many which is perhaps a surprise as they could have been suitable for longer distance services. It may have been the 70 mph top speed that precluded wider use and also saw them banished from the London area mains so as not to hold up the then new 125 mph IC125s.
Having studiously avoided those 1970s 'Merrymaker' excursions from Manchester that seemed likely to use DMUs, I think my personal best/worst would be a 1990 holiday journey from Manchester Victoria to Llandudno with our young son. At least bagging the front seats in the Class 101 (I think) largely made up for any other discomforts.Back in the day, Manchester Victoria to Holyhead was a fairly regular one in the north west. About 125 miles each way.
The evening fasts to Maidenhead and Twyford went over to Class 47 or 50 haulage, sometimes using InterCity Mk2s between longer distance dutiesAll were gone by the 1978 timetable, even from the relief lines.
The evening fasts to Maidenhead and Twyford went over to Class 47 or 50 haulage, sometimes using InterCity Mk2s between longer distance duties
In the mornings there were presumably not so many IC125s arriving in the commuter peak, so the 70 mph 117s were still allowed on the Mains if running non-stop from Slough or Maidenhead.
Historically Henley was treated as an important destination with evening commuter services before diesels hailed by express steam with corridor stock. The perceived importance seemed to persist, hence running services first stop Twyford to give a fast service to Henley.But then we had:
1733 Twyford, Goring, Cholsey, Didcot, Oxford (9-car)
and
1736 Maidenhead, Reading and all to Oxford (8-car)
...
and then
1803 same calling pattern as 1733 (8-car)
1806 same calling pattern as 1736 (11-car)
I'm not usually one for questioning high frequency of services, but it almost seems like the 1733/1736 and 1803/1806 could have been each combined into one working, calling at Maidenhead and then all to Oxford.
1M42 D350 17:30 Reading 18:00-18:02 then RLActually one curious anomaly in the early HST era concerns the slower Oxford peak services, where there seemed to be very generous provision.
A bit OT as these were loco-hauled, but in 1981 we had:
1730 to Banbury. A fast service, Reading, Didcot and Oxford, which plugged the gap between the two Hereford peak services.
But then we had:
1733 Twyford, Goring, Cholsey, Didcot, Oxford (9-car)
and
1736 Maidenhead, Reading and all to Oxford (8-car)
Half an hour later, we had
1800 to Hereford (first stop Oxford)
and then
1803 same calling pattern as 1733 (8-car)
1806 same calling pattern as 1736 (11-car)
I'm not usually one for questioning high frequency of services, but it almost seems like the 1733/1736 and 1803/1806 could have been each combined into one working, calling at Maidenhead and then all to Oxford. As a commuter at the time, do you remember why there was this seemingly very generous provision? I do speak naively: I didn't use the railways in 1981 full stop, let alone the GWML between Paddington and Reading/Oxford!
Perhaps the sheer volume of Reading commuters (the HSTs largely skipped Reading or called to pick up only in the peak) meant that a train serving Reading and all the other stops would have been ridiculously overcrowded? Between the 1736 and 1806, only one fast served Reading to set down - the 1752 Westbury, so Reading did have quite a thin peak service at the time compared to say the smaller Guildford with a train every 10 mins. And before the 1730, the previous service available to Reading commuters was the 1706 Newbury.
To be fair in 1982 the 1736/1806 (slightly retimed) were then cut back to terminating at Twyford with the 1733/1803 (again retimed) making extra stops.
They did indeed-115’s most likely. Don’t think they got beyond Nottingham though.Got to page three and jumped to here so apologies if suggested already, couldn't find any mention of it in first three pages:
Didn't 1st gen DMUs do London Marylebone to Nottingham Victoria? Maybe class 117s or 115s? That is about 125 miles, maybe more. Not sure if they ventured any further north of there towards Manchester?
Only Marylebone-Nottingham. Aside from overnight trains, and the Newcastle-Poole train, there was no service north of Nottingham Victoria when the DMUs were used.Got to page three and jumped to here so apologies if suggested already, couldn't find any mention of it in first three pages:
Didn't 1st gen DMUs do London Marylebone to Nottingham Victoria? Maybe class 117s or 115s? That is about 125 miles, maybe more. Not sure if they ventured any further north of there towards Manchester?
Got to page three and jumped to here so apologies if suggested already, couldn't find any mention of it in first three pages:
Didn't 1st gen DMUs do London Marylebone to Nottingham Victoria? Maybe class 117s or 115s? That is about 125 miles, maybe more. Not sure if they ventured any further north of there towards Manchester?
my mate always called them bone shakers or rattlers on account of the windows rattling when idlingAll variations of the same thing, I've seen:
Bog Carts
Bog Units
Bugs
Bug Carts
Bug Chariots
Bug Units
All referring to 1st gen DMUs, and sometimes extended to 2nd gen too.
The Swindon Inter City DMUs worked the Paddington-Henley commuter trains from 1968 to 1976.The following down services in the evening peak appeared to be operated by IC units:
1721 Henley 1A84 Main line, 3+4+4 car units
1821 Henley 1A96 Main line, off 1705 Reading due 1800, 4+3 car units, same units as 1603 Reading
Prior to that, but after the end of steam, there was a brief period of Hymek on Paddington-Henley commuter trains. which ended with the Paddington area resignalling that knocked out the run round facility at Henley.Historically Henley was treated as an important destination with evening commuter services before diesels hailed by express steam with corridor stock.
And this is indeed why the through workings to Henley finished in 1976. The Swindon Inter City DMUs were then briefly tried on the Cardiff-Crewe route but were a disaster.It may have been the 70 mph top speed that precluded wider use and also saw them banished from the London area mains so as not to hold up the then new 125 mph IC125s.
This wasn't a curious anomaly, it was a clever piece of timetabling that made maximum use of main line capacity, the key factor being how far could a 90 mph train get on the main line before it got caught by by a 125mph HST following behind. I travelled on these trains occasionally and they were well loaded, both with Twyford and Maidenhead commuters, and commuters connecting for Henley and Marlow.Actually one curious anomaly in the early HST era concerns the slower Oxford peak services, where there seemed to be very generous provision.
A bit OT as these were loco-hauled, but in 1981 we had:
1730 to Banbury. A fast service, Reading, Didcot and Oxford, which plugged the gap between the two Hereford peak services.
But then we had:
1733 Twyford, Goring, Cholsey, Didcot, Oxford (9-car)
and
1736 Maidenhead, Reading and all to Oxford (8-car)
Half an hour later, we had
1800 to Hereford (first stop Oxford)
and then
1803 same calling pattern as 1733 (8-car)
1806 same calling pattern as 1736 (11-car)
I'm not usually one for questioning high frequency of services, but it almost seems like the 1733/1736 and 1803/1806 could have been each combined into one working, calling at Maidenhead and then all to Oxford. As a commuter at the time, do you remember why there was this seemingly very generous provision? I do speak naively: I didn't use the railways in 1981 full stop, let alone the GWML between Paddington and Reading/Oxford!
Didn't 1st gen DMUs do London Marylebone to Nottingham Victoria? Maybe class 117s or 115s? That is about 125 miles, maybe more. Not sure if they ventured any further north of there towards Manchester?
For 3 winters 1959-60, 1960-61 and 1961-62 the York-Bournemouth did not run in the winter, and was replaced by a DMU running York to Banbury and back. I think York-Banbury via the GC was just over 150 miles.Only Marylebone-Nottingham. Aside from overnight trains, and the Newcastle-Poole train, there was no service north of Nottingham Victoria when the DMUs were used.
Interesting - I figured the bunching was due to ensuring the main lines were clear for following HSTs, but I was curious about two separate trains each half hour as opposed to one. But it appears that Twyford and Maidenhead as well as Reading had very large numbers of commuters, which even a half-hourly full-length loco-hauled consist would have been unable to handle.The Swindon Inter City DMUs worked the Paddington-Henley commuter trains from 1968 to 1976.
Prior to that, but after the end of steam, there was a brief period of Hymek on Paddington-Henley commuter trains. which ended with the Paddington area resignalling that knocked out the run round facility at Henley.
And this is indeed why the through workings to Henley finished in 1976. The Swindon Inter City DMUs were then briefly tried on the Cardiff-Crewe route but were a disaster.
This wasn't a curious anomaly, it was a clever piece of timetabling that made maximum use of main line capacity, the key factor being how far could a 90 mph train get on the main line before it got caught by by a 125mph HST following behind. I travelled on these trains occasionally and they were well loaded, both with Twyford and Maidenhead commuters, and commuters connecting for Henley and Marlow.
The 1733 and 1803 were main line to Ruscombe and crossed to the relief line there (with 70 mph crossovers) before stopping at Twyford.
The 1736 and 1806 were main line to just before Maidenhead and crossed to the relief line before stopping at Maidenhead.
In each case the trains had to get off the main line for HSTs departing Paddington at 1745 and 1815.
At one or both down trains used to cross to the up relief to give a cross platform connection for the branch line.
Not especially lengthy but slightly bizarrely there was an infrequent opportunity to bounce your way up the ECML to Berwick on Tweed on a DMU from Newcastle at one time.Although not as long as some, in the early 60s there were a couple of return trips between Newcastle and Leeds operated by 4 car DMUs which were over 100 miles. Most were Metro Cammell sets, but I have seen photos of the early Derby Lightweight sets (yellow diamond) being used. In those days, their 70 mph top speed didn't stop them having a fast line path (Thirsk had fast line platforms in those days).
At some point, they gained the buffet car sets that South Gosforth had.
Similar challenges would have been faced by services climbing from Uddingston to Bellshill
If I remember correctly, up to the beginning of the 1980s there was an Oxford-Paignton and return DMU that ran on Summer Saturdays only;
In a Paddington working book the dmus may have left on the Main line, but were crossed onto the Reliefs quite soon.
I remember the Oxford - Paignton in the mid 80s as a 50 turn and a means to scoop Foxhall curve. And yes, it ran via Bath & Bristol.If I remember correctly, up to the beginning of the 1980s there was an Oxford-Paignton and return DMU that ran on Summer Saturdays only; I think it ran via Bristol. It was one of the first of the Down daytime trains that would keep us busy for several hours.