There's this from WMCA, which is not all hs2 released capacity, but does base a lot of the plans on it. https://wmre.org.uk/our-strategies/west-midlands-rail-investment-strategy/
== Doublepost prevention - post automatically merged: ==
There was some work from midland connect on their midland engine rail plan, which proposed some extra interventions to make the most of released capacity and some additional hs2 routes https://www.midlandsconnect.uk/media/1593/final-mer-report.pdf
== Doublepost prevention - post automatically merged: ==
The problem is that recasting a timetable can produce winners and losers. Whenever an hs2 planet assumptions report was published, those opposing the project would look for the losers and then claim hs2 would make journeys slower. Such stories featured in Gilligan's early anti hs2 articles and stophs2 campaigning. Somehow, that sort of false argument ended up in "Network North".
Planet assumptions weren't intended to be the end specification, it was conservative in its assumptions and there were a number of different ways the capacity could be used depending on the focus and needs at the time. You couldn't promise a certain spec, though I think they would have done well to brand a new type of high frequency service that would run on wcml post hs2.
Thanks, I was aware of these now you've reminded me.
However, I don't believe something similar was done for other cities, like Manchester (or those on the Eastern Arm).