Overcapacity is a big discussion point about the Chinese economy and infrastructure these days, and inevitably some of that refers to the railways.

I recently changed at Nanjing South, a mostly busy station serving a major city of around 10 million, yet saw trains occupying only 6 of the 28 platform faces at one point.

So my question is, which station in the UK has abundant 'overcapacity'?

I would guess Stirling with 9 platforms when sometimes only 1 may be occupied.

And which station has the most efficient capacity utilisation?

Again, it's an educated guess, but I would expect it to be Clapham Junction or maybe London Bridge. Manchester Piccadilly platforms 13 and 14 if you cleaved them off the main trainshed I suppose.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

amahy

Member
Joined
9 Dec 2024
Messages
502
Location
West Dunbartonshire
Scarborough is an obvious example, with 6 platforms and just 2tph. I would be in favour of keeping at least 3 platforms there though, as railtours are quite frequent.
 

PGAT

Established Member
Joined
13 Apr 2022
Messages
2,133
Location
Selhurst
Tattenham Corner has 3 platforms which are only required on Derby days, one at all other times.

Elizabeth Line and Thameslink cores are obvious examples of “efficiency” with only two platforms handling 20+tph in both directions
 

BeijingDave

Member
Joined
26 Jul 2019
Messages
804
Tattenham Corner has 3 platforms which are only required on Derby days, one at all other times.

Elizabeth Line and Thameslink cores are obvious examples of “efficiency” with only two platforms handling 20+tph in both directions

Elizabeth Line good call.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,462
Location
Somerset
Tattenham Corner has 3 platforms which are only required on Derby days, one at all other times.

Elizabeth Line and Thameslink cores are obvious examples of “efficiency” with only two platforms handling 20+tph in both directions
Though in both cases “efficiency” also means “high risk” in the event of a failure!
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,415
Location
The Fens
For abundant capacity, Moorgate Northern City Line is an interesting example, even though it has only 2 platforms.

When the GN inner suburban electric service was first introduced the peak hour service was 18tph. It is now 10tph with the same capacity.

For efficiency Stansted Airport is interesting. It has 3 platforms, only 6tph because it is single track under the runway, and still handles more than 10 million passengers per year.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,648
Location
Greater Manchester
On the West side, Inverness has quite a few rarely used platforms facing towards Dingwall.

Manchester Oxford Road, despite being on one of the busiest most congested lines, has plans in place to downgrade from 5 to 3 platforms.

Kyle of Lochalsh has 2 platforms for 4 trains per day (which all use platform 1).
 

HighlandStorm

Member
Joined
27 Sep 2024
Messages
174
Location
Inverness
On the West side, Inverness has quite a few rarely used platforms facing towards Dingwall.
Quite a few amounting to one, in Platform 7 - which often has something in it, but is only occasionally used for passenger departures / arrivals due to being way outside the train shed. Judging by old photos at sometime that platform was curtailed and filled in to make the carpark?
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,462
Location
Somerset
Well, this is always the trade-off
Inevitably - unfortunately in this country too much emphasis is placed on “efficiency” on paper and the quick win by selling off land which happens to be surplus this week and not enough to resilience.
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,844
Scarborough is an obvious example, with 6 platforms and just 2tph. I would be in favour of keeping at least 3 platforms there though, as railtours are quite frequent.
Because of the limited capacity on the lines away from Scarborough the station itself needs more capacity than you might think.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,846
Location
West of Andover
Clacton on Sea, 4 platforms for 1tph with some peak time extras.

Skegness with 3 active (and 3 mothballed (?) platforms) for 1tph.
 

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,393
Apart from acting as sidings overnight, only one of the DC platforms (1-4) at Watford Junction is normally occupied at once off-peak.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,543
Location
Taunton or Kent
Bath Spa has fairly efficient capacity utilisation, as a two platform station with 6.5 million passengers annually, especially compared to nearby Bristol Temple Meads having not quite double the patronage but 13 active platforms.

Chafford Hundred is the busiest single-platform station in the UK, with 2.3 million passengers.

I feel like Penzance is overcapacity to an extent, with 4 platforms for a normally 2tph service; yes the sleeper needs more time, but as per its purpose it runs at relatively quiet times anyway.
 

Severnia333

Member
Joined
20 Jan 2025
Messages
64
Location
Bristol
Bath Spa has fairly efficient capacity utilisation, as a two platform station with 6.5 million passengers annually, especially compared to nearby Bristol Temple Meads having not quite double the patronage but 13 active platforms.

Chafford Hundred is the busiest single-platform station in the UK, with 2.3 million passengers.

I feel like Penzance is overcapacity to an extent, with 4 platforms for a normally 2tph service; yes the sleeper needs more time, but as per its purpose it runs at relatively quiet times anyway.
Bath was the one that sprang to mind for me. Cheltenham is similar although not as busy.
 
Joined
16 Sep 2018
Messages
75
Highest number of trains per hour per platform: Bond Street and Tottenham Court Road with 24 trains per hour per platform. (Thameslink and London Overground drag down the averages at Farringdon and Whitechapel)

Lowest number of trains per hour per platform: Kyle of Lochalsh, as mentioned above (four trains per day over two platforms). Stranraer is close behind with 5 trains per day and also two platforms. At Kyle there's about 15 hours from the start to the end of the service, so that works out at 0.13 trains per hour per platform (spread over 15 hours).
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,846
Location
West of Andover
Although the 2nd platform at Stranraer is effectively out of use as it requires the station signal box to be activated. Unlike the other Scottish termini stations which have 2 platforms for a half-hourly or hourly service
 

The Pelican

Member
Joined
3 Oct 2025
Messages
426
Location
London
It always seems to me like these discussions should cover "most useful set of destinations per platform per hour". Manchester Platforms 13/14 and the Thamslink Core manage a very varied set of trains at a decent frequency, which is very impressive. Crossrail only has 2 Western and 2 Eastern branches, but they are fairly popular places.

On the other hand, the Victoria line has a very useful route, but any platform only has trains along one line.

Does the Northbound Avanti platform at Crewe have a Manchester, a Liverpool, and a Glasgow train each hour?
 

Howardh

Established Member
Joined
17 May 2011
Messages
9,797
Blackpool North? Seems to have a lot of platforms but rarely more than two trains in?
 

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,393
It always seems to me like these discussions should cover "most useful set of destinations per platform per hour". Manchester Platforms 13/14 and the Thamslink Core manage a very varied set of trains at a decent frequency, which is very impressive. Crossrail only has 2 Western and 2 Eastern branches, but they are fairly popular places.
I think platform 10 at Stratford has almost all Greater Anglia services (apart from most or all Lea Valley and most Southend services), so Braintree and Clacton services in addition to those through to Ipswich and Norwich.
 

flitwickbeds

Member
Joined
19 Apr 2017
Messages
774
Thamslink Core manage a very varied set of trains at a decent frequency, which is very impressive.

The stock going through the Thameslink core is all (essentially) the same. A mix of 8 and 12 coach variants, yes, but otherwise basically identical.

If you mean destinations instead of stock, then again there's not too much variation. Some exotic (!) destinations at peak hours, but otherwise it's either the Midland Mainline or East Coast Mainline to the north; and the Brighton mainline or Sutton loop to the south.
 

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,393
Some exotic (!) destinations at peak hours, but otherwise it's either the Midland Mainline or East Coast Mainline to the north; and the Brighton mainline or Sutton loop to the south.
There's the Quarry / non-Quarry variations on the BML and Rainham as well.
 

The Pelican

Member
Joined
3 Oct 2025
Messages
426
Location
London
The stock going through the Thameslink core is all (essentially) the same. A mix of 8 and 12 coach variants, yes, but otherwise basically identical.

If you mean destinations instead of stock, then again there's not too much variation. Some exotic (!) destinations at peak hours, but otherwise it's either the Midland Mainline or East Coast Mainline to the north; and the Brighton mainline or Sutton loop to the south.
I meant the Northbound platforms especially- two mainlines plus the Cambridge branch is quite an impressive range of stations!
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,882
Location
East Anglia
I think platform 10 at Stratford has almost all Greater Anglia services (apart from most or all Lea Valley and most Southend services), so Braintree and Clacton services in addition to those through to Ipswich and Norwich.
Platform 10A is normally available as a back up and used quite intensively during peak hours. A few Southend Vic services also use platform 8.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,414
Location
Yorks
This thread has got me thinking about the old Epsom Downs station and its nine platforms. Now rebuilt with one.

== Doublepost prevention - post automatically merged: ==

Tattenham Corner has 3 platforms which are only required on Derby days, one at all other times.

Used to have six at one time.
 

johnnychips

Established Member
Joined
19 Nov 2011
Messages
3,826
Location
Leeds
Just as a contrast from abroad, I attach a picture of the departure board at Blankenberge in Belgium. I realise there will be more trains in the peak and in high summer, but I love the way they have scattered the hourly trains around the seven platforms without any obvious logic.

1775314691534.jpeg
 

Merle Haggard

Established Member
Joined
20 Oct 2019
Messages
3,991
Location
Northampton
Wellingborough for capacity in excess of usage.
As part of the MML electrification the two fast line platforms were extended to 12 car; the down slow one as well, but involving more extensive work including removal of a former bay, and a new 12 car platform on the reinstated Up Slow (previously reduced to a single slow line on the Down formation)).
Current service is 8 car trains 2 tph from the Down fast and the Up Slow platforms, two 5 cars also call at the Down Fast in the early morning. Three 5-car trains in the early evening make the only calls at the Up Fast platform, and there are no trains booked to call at the Down Slow platform.
 
Status
Not open for further replies.

Top