Is 18/10/26 not written in stone then? What reason could there be for delaying the changeover?
subject of another thread.
But the short version is: there is a LOT of work that goes on behind the scenes to transfer an operator between owners, and that includes between a private owner and a public owner. There’s a team in DFT that is doing this (led by a very capable individual), but they only have so much capacity. Hence the ‘beat rate’ of one every 4 months or so. GTR in May, Chiltern in September.