87015
Established Member
Yes, thats booked (from upthread) in the current Mk5 diagramsNot sure if this is correct, but it looks like CH04 was allocated to one of the Gerrards X - Marylebone services this morning:
Yes, thats booked (from upthread) in the current Mk5 diagramsNot sure if this is correct, but it looks like CH04 was allocated to one of the Gerrards X - Marylebone services this morning:
Is there any particular reason why 2H16 is a Mk5 vs 1H12 which used to be Mk3 and is now a 2x2 car units?Yes, thats booked (from upthread) in the current Mk5 diagrams
1H12 has heavier loadings than 2H16. Seated capacity for 2x two-car 165s is 342 passengers, whereas for a Mk5A set it's 291.Is there any particular reason why 2H16 is a Mk5 vs 1H12 which used to be Mk3 and is now a 2x2 car units?
Oh completely missed that somehow!Yes, thats booked (from upthread) in the current Mk5 diagrams
Makes sense then. Is going to be interesting how they put together a future timetable to roll out extra Mk5 services without them being overcrowded1H12 has heavier loadings than 2H16. Seated capacity for 2x two-car 165s is 342 passengers, whereas for a Mk5A set it's 291.
Makes sense then. Is going to be interesting how they put together a future timetable to roll out extra Mk5 services without them being overcrowded
I presume you mean H25 instead of H22?Is there any particular reason why 2H16 is a Mk5 vs 1H12 which used to be Mk3 and is now a 2x2 car units?
1H10 PRR-MYB was cancelled as the inbound 5P05 ECS terminated at West Ruislip with brake issues (per RTT). This would be a Mk5 usually. Then 1H22 terminated as well - so doesn't look like a good day for the Mk5s!
1J55 is now showing as CH03. No loco but I believe it's 68024 on that one. Believe it's the first time CH03 has been in service too.Looks like Chiltern are making a bit more use of their Mk5s today with the Wembley event.
The 0807, 1102, 1202, 1607, 1637, 1707, 1837 are all Mk5s today (1837 isn’t showing an allocation yet in RTT but I’m assuming it’ll still be a mk5)
Should be 680241J55 is now showing as CH03. No loco but I believe it's 68024 on that one. Believe it's the first time CH03 has been in service too.
If it stops at Kings Sutton then I don’t really see any reason why they can’t/won’t reinstate the Kings Sutton call on 1H08. Loadings are probably the only thing, but I can’t imagine it being that muchRealtime Trains | 1H77 1915 Birmingham Moor Street to London Marylebone | 27/03/2026
Real-time train running information for 1H77 1915 departure from Birmingham Moor Street to London Marylebone on 27/03/2026. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
68027 & CH04 allocated to 1H77 1915 BMO - MYB, which stops at Lapworth, Hatton and Kings Sutton!
I don't believe there is enough time to call 1H08 at Kings Sutton.If it stops at Kings Sutton then I don’t really see any reason why they can’t/won’t reinstate the Kings Sutton call on 1H08. Loadings are probably the only thing, but I can’t imagine it being that much
Ah yes that’s probably it.I don't believe there is enough time to call 1H08 at Kings Sutton.
It would impact on the timings south of Bicester / Haddenham. 1Y10 is just about as tight as you'd want it to be whoch then does the calls at Haddenham and Risborough etc. It would knock the whole flight out.
1H08 is already a few minutes later than previous (as units) for the additional dwell times required.
I also don't believe it could be run earlier to accommodate, either, as it'll be pinned down at certain key locations.
Yes it does look pretty much exactly the same as current. Nothing noticeable I don’t thinkHave not looked to see what May TT change looks like, but I suspect it would be a near carbon copy.
Same set as 2 weeks ago68029 also back in service today, it's been in service before but is presumably with another new set behind it today as again it's only the loco allocated again.
I think the ideal formation would be 6 standard + 1 first to replace the 6 + DVT but apparently they can't easily do that.First journey on the new fleet yesterday. My god they are AWFUL.
6 carriages worth of cattle, sorry, I mean people, crammed into 4 carriages, with a completely empty first class carriage at the front.
Well done Chiltern!
That would lead to less overall sets which is not really ideal either. In an ultra ideal/ambitious world I’d be ordering some extra Mk5s new from CAF to go behind the original pool of 68s (I know this needs a bit of modification) as a supplement to the ex-TPE ones. Then also a few more to extend the original sets to 6 or 7 carriages as you said. These can be used for additional peak extras, service extensions to Worcester or perhaps a new Oxford - Moor Street service which could be an idea.I think the ideal formation would be 6 standard + 1 first to replace the 6 + DVT but apparently they can't easily do that.
Looking at RTT for Friday there appears to be extra diagramsdoes anyone know if they’ll be running over Easter? I’d like to try one for myself.