anthony263
Established Member
Maybe someone should ask CAF or stadler if tbey can build a rake of mk5A/M6 carriages with DVTs/DBSO and have 12 or 13 rakes of 6
5/6 carriages with bi mode locos say class 99s.
Order enough rakes to run an hourly Swansea to Manchester Piccadilly service with 1 train every 2 hours running through to milford haven. The workings which terminate at Swansea every 2 hours should be loco hauled and possibly stabled at landore.
Should also have enough rakes to reinstate the additional loco hauled services to Holyhead before tfw scrapped them.in favour to use more loco hauled rakes on Manchesters
5/6 carriages with bi mode locos say class 99s.
Order enough rakes to run an hourly Swansea to Manchester Piccadilly service with 1 train every 2 hours running through to milford haven. The workings which terminate at Swansea every 2 hours should be loco hauled and possibly stabled at landore.
Should also have enough rakes to reinstate the additional loco hauled services to Holyhead before tfw scrapped them.in favour to use more loco hauled rakes on Manchesters