tfw756rider
On Moderation
Today's (Mon 23/3/26) 6G97 1006 Donnington Rft to Crewe C.S. (L&Nwr Site) (66515+barrier 1+197041+barriers 2-6) arrived at Crewe C.S. (L&Nwr Site) 8 minutes early (at 1213 rather than 1221).
The Cambrian is due to Switchover in September regardless of 398’s.For me the best indication that Cambrian is to switch over to 197s is when enough of the 398s are in service to cover the TAM lines so that the 231s & 756s can go to their planned / correct routes thus freeing up 197s for their planned /correct routes.
On this thread way back we were given the impression it would be an overnight/over-weekend switch over. But is that still true ?.
Both options are still possible, it hasn’t been decided on how it will be done yet. Advantages and disadvantages to both.Alternatively. If Cambrian can run a mix of 158s and 197s. Then perhaps these extra 197s will partially take over.
Two things make this unlikely.
Machynlleth depot cannot cope with a mix of fleets.
So much splitting and joining happens of trains on Cambrian Coast that it is inevitable a 197 will encounter the need to couple to a 158. I have not seen any indication that this is to become possible ?
Effectively not possible - 158-197 coupling requires an adapter and even then, 5mph maximum I believe.
I believe it also requires a forklift to lift it into place. If so, not even useful in a recovery scenario.Thanks, that's definitely not a possible day to day for passenger operations then !.
Ey? Following me seeing the pre-driver training check runs in November 2025, driven by the driver trainer(s), I was of the understanding that the first 197 Cambrian driver/crew training took place in December 2025 and continued into January and February 2026.I’m told crew training starts in the next few weeks.
Nope, the training has not started.Ey? Following me seeing the pre-driver training check runs in November 2025, driven by the driver trainer(s), I was of the understanding that the first 197 Cambrian driver/crew training took place in December 2025 and continued into January and February 2026.
I've seen a guard on the runs a few times, and I've seen a driver trainer training a driver as well.
I don’t work on the railway so no idea if it was successful sorry. 4cars are definitely cleared. Just crews need training.Was the six car test successful last week? Are the 197s cleared for the Cambrian yet?
Ah, thanks. Makes sense with the 6-month thing.Nope, the training has not started.
There are a small number of instructors trained and an equally small number of drivers did some training as part of checking that the training course is all ok to be filled out en-masse.
Again. Small number of conductor trainers too.
Mass training will start imminently. Any sooner and crews would need retraining before September.
There were also some ‘pleasure’ journeys to Aberystwyth which had tfw and NR staff on so they could see what they’re like.
I suspect that's just rumour as there's no Depot capacity to be able to maintain anymore 197's without expanding or building new Depots.
What would make more sense is buying more centre cars, expanding 2 cars to 3 cars, or even 3 cars to 4 cars.
If I recall correctly from way back on this thread (and possibly other online sources) an overnight switch from 158 to 197 was the plan at one stage, but then that plan changed and now there are suggestions it may have changed back again. Does anyone know for sure now? Seems doubtfull...It is reasonable to suppose that TfW want to get all the newest 197s (ETCS fitted for Cambrian Coast) thoroughly run in before a big bang switch over on Cambrian from 158s happens. On this thread way back we were given the impression it would be an overnight/over-weekend switch over. But is that still true ?.
Now, this is probably a pedantic point, but I'm not aware that any splitting and joining happens of trains on Cambrian Coast line on a regular basis. Maybe at Pwllheli around the start and end of the day, as unit(s) are moved to sidings for overnight stabling?So much splitting and joining happens of trains on Cambrian Coast that it is inevitable a 197 will encounter the need to couple to a 158. I have not seen any indication that this is to become possible
That seems to be the biggest issue to me. Although they appear to be able to stable a small number of 197s there alongside the 158s there at present, while the staff get to know the Cavity fleet, I can appreciate that they aren't going to be able to cope with maintaining a mixed fleet of around 45 units (20 odd 158s + 20 odd 197s) for any length of time.Machynlleth depot cannot cope with a mix of fleets.
I will have to remember Cambrian Coast does not include Machynlleth to Aberystwyth (wish me luck).If I recall correctly from way back on this thread (and possibly other online sources) an overnight switch from 158 to 197 was the plan at one stage, but then that plan changed and now there are suggestions it may have changed back again. Does anyone know for sure now? Seems doubtfull...
Now, this is probably a pedantic point, but I'm not aware that any splitting and joining happens of trains on Cambrian Coast line on a regular basis. Maybe at Pwllheli around the start and end of the day, as unit(s) are moved to sidings for overnight stabling?
My understanding is that the Cambrian Lines are as follows:
While coupling a 197 to a 158 isn't going to work, removing some through workings for a timetable period (making some passengers change at Dovey Junction, Machynlleth or Shrewsbury, depending on the choice of through services removed) would allow TfW to mix 197s and 158s during a transition period, without needing them to couple to each other. I think there are even a few services between Aberystwyth/Machynlleth and Shrewsbury (mostly even-hour departures from AYW/SHR) which do not have a Pwllheli portion and are not currently advertised as running through to/from Birmingham. These could theoretically switch to class 197 operation without impacting the rest of TfW's 158-operated services (at least not as far as the service advertised to passengers is concerned).
- Cambrian Main Line (Aberystwyth (or Machynlleth) to Shrewsbury)
- Cambrian Coast Line (Dovey Junction / Machynlleth to Pwllheli - possibly also to Aberystwyth but certainly not the Machynlleth to Shrewsbury section)
That seems to be the biggest issue to me. Although they appear to be able to stable a small number of 197s there alongside the 158s there at present, while the staff get to know the Cavity fleet, I can appreciate that they aren't going to be able to cope with maintaining a mixed fleet of around 45 units (20 odd 158s + 20 odd 197s) for any length of time.
So perhaps the switch over will have to happen fast enough that the 158s can be run into the ground (as in not getting medium/major fitter attention). Bit like the 175s as Chester switched over, but erm more successfully.

158s are also maintained by Canton, as well as both Crewe Depots being maintenance Depots for them. There's more flexible options for the 15x fleet than there is with CAF units.It will come down to what Machynlleth can handle. Chester is creaking so no help there.
So perhaps the switch over will have to happen fast enough that the 158s can be run into the ground (as in not getting medium/major fitter attention). Bit like the 175s as Chester switched over, but erm more successfully.
197105 and 175105, both 105sFocus may have switched a little towards 197s as 175s were close to withdrawal but they were still being maintained as per VMI as this picture from mid October 23 shows.
View attachment 201059

Looks to be working this:Looks like 197025 has entered service today
But only if there are self contained attachment-free diagrams. However, that could be forced by temporary timetable changes that have no splitting/combining at Machynlleth.I can see a minority of 197s could do the simple services (even hour Aberytswyth Services that do not split/join anywhere). Then when 197s become the majority the 158s could swap and take on the simple services.
It would be better to have the 197's work Cambrian Coast services which is more contained in the even of issues.I can see a minority of 197s could do the simple services (even hour Aberytswyth Services that do not split/join anywhere). Then when 197s become the majority the 158s could swap and take on the simple services. A bit like the 379s taking over at Great Northern starting with the simpler services that did not require splitting/joining.
While coupling a 197 to a 158 isn't going to work, removing some through workings for a timetable period (making some passengers change at Dovey Junction, Machynlleth or Shrewsbury, depending on the choice of through services removed)
197105 and 175105, both 105s![]()
It was a little poetic to have them both side by side. "The King is dead, long live the King" or is it !
Looks like 197025 has entered service today
Thanks bothLooks to be working this:
Realtime Trains | 1D34 0925 Manchester Airport to Holyhead | 25/03/2026
Real-time train running information for 1D34 0925 departure from Manchester Airport to Holyhead on 25/03/2026. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
In multi with 197109.| Variant | Quantity of units | Unit numbers | Build year range |
| 197/0 (non-ETCS) | 30 | 197001-002, 197004-021, 197042-051 | 2020-2023 |
| 197/0 (ETCS-fitted) | 21 | 197003, 197022-041 | 2021-2026 |
| 197/1 (188-seat) | 12 | 197101-112 | 2020-2023 |
| 197/1 (174-seat) | 14 | 197113-126 | 2023-2024 |
Cant help with the test runs im afraid.There were two test runs between Crewe South Yard and Chester in the early hours this morning 5Q31 - 5Q34 inclusive.Anyone know the allocation for these?197041?
197038 has worked 5T38 Crewe South Yard - Chester TMD for preparation to service.
There is also a 5T27 Crewe Electric Depot - Shrewsbury in for later 197027 or 158827.
Thank youCant help with the test runs im afraid.
197038 now showing as accepted so just 039/040/041 to go.
158827 is at Crewe Electric so will be that one.
Now the latest 3 197s are in service, 197028/033/034 have been replaced in the service pool and stabled/stored at Holyhead.
197023/025/026/031/032/036/037 are the current ERTMS sets in passenger service.
197024+197029+197030 were seen in Machynlleth sidings yesterday (Wed 25/3/26) by someone I know (they were still there from the recent 6-car runs) - I'm not aware of them having since gone back to Shrewsbury, let alone still being at Shrewsbury!Are 197024 197029 and 197030 still at Shrewsbury?
Both shown as at Holyhead currently.Thank you
Can you provide locations for 197027 and 197035 please?
Are 197024 197029 and 197030 still at Shrewsbury?
It was 197041, it was out on a brakes/traction commissioning run.There were two test runs between Crewe South Yard and Chester in the early hours this morning 5Q31 - 5Q34 inclusive.Anyone know the allocation for these?197041?
197038 has worked 5T38 Crewe South Yard - Chester TMD for preparation to service.
There is also a 5T27 Crewe Electric Depot - Shrewsbury in for later 197027 or 158827.
I can't see any. By the way, if you want to look for yourself, go on Realtime Trains and enter into the Quick Search box "xmc detailed" (without quotes), change to "All day" and go through the week on the date selector, looking for "3C" headcodes.Are any Cambrian test runs planned for next week does anyone know?
As far as im aware those 6 car runs were the last of the test runs and the sets are there for depot/ststic training.@sd0733 will sometimes very kindly inform us that the runs are on the internal system before they go out to the publicly viewable data.