A very large amount of 25kV OHLE, predominantly to the East, North-East, West, & South West... indeed the best solution would be checking in all directions and installing wherever it is not found. Leeds to Bristol via Derby and Birmingham and Shrewsbury to Peterborough via Birmingham and Leicester would be good places to start.What needs to be done at Birmingham new street to improve the air quality? Passed through this afternoon and the entire place reeks of diesel and the air feels physically thick. It’s absolutely awful
Shame the battery conversion for the Voyager fleet at stations never got off the ground. Cant see anything changing now on their final 15 years or so of life.I don't find the modern DMUs a massive problem. There aren't many of them, they aren't very long, they don't dwell very long (and the Shrewsburys often use 4C which is outside anyway) and they have quite clean emissions.
158s aren't ideal but they only pass through briefly and will be gone soon.
The problem is Voyagers. It only stinks when one is there.
It’s beyond time that these filthy, noisy, shuddering abominations were sent for recycling. With the increasing take up of EVs and new electric bus fleets, rail is fast becoming the archaic dirty option for travel in some areas.Shame the battery conversion for the Voyager fleet at stations never got off the ground. Cant see anything changing now on their final 15 years or so of life.
There will always need to be high-capacity transport options. The only thing batteries solve is tailpipe emissions, the societal impact of car-dependency still remains.It’s beyond time that these filthy, noisy, shuddering abominations were sent for recycling. With the increasing take up of EVs and new electric bus fleets, rail is fast becoming the archaic dirty option for travel in some areas.
Possibly around 2035-2040 but until then it is what it is.It’s beyond time that these filthy, noisy, shuddering abominations were sent for recycling. With the increasing take up of EVs and new electric bus fleets, rail is fast becoming the archaic dirty option for travel in some areas.
Absolutely definitely. It is criminal in my opinion that it has not been done.A very large amount of 25kV OHLE, predominantly to the East, North-East, West, & South West... indeed the best solution would be checking in all directions and installing wherever it is not found. Leeds to Bristol via Derby and Birmingham and Shrewsbury to Peterborough via Birmingham and Leicester would be good places to start.
I think there has been a recent modification (which might still be in progress) to allow this, although it was done for fuel saving, not emissions reductions.Is there any realistic/practical way of configuring the 220/221s so that they only need say 1 or 2 engines running in the Birmingham New Street area, given the relatively low line speeds around the Station then restart them all once the train has exited the tunnel or the Station and proceed as usual? (Similar to the Eco mode on 185s)
Given the attitude of successive governments to Cross Country I fully expect we will be stuck with the Voyager fleet until they literally fall apart.It’s beyond time that these filthy, noisy, shuddering abominations were sent for recycling.
...
Given the attitude of successive governments to Cross Country I fully expect we will be stuck with the Voyager fleet until they literally fall apart.

Still better these days than it used to be.
In the 1970s and 1980s the locos were not the pollution issue, it was the first generation DMUs. It got much worse when the Cross City service started (1960s New Street was not designed for that), especially as Tyseley got some fairly ropey cast offs from other regions to increase the size of their fleet. The Etches Park Swindon cross country units were fairly gruesome too.When the station was rebuilt (1960s) they took care to ensure all the stationary loco positions were in the open to avoid exhaust fumes.
Tell me about. Some fantastically impressive exhaust emissions if first gen DMUs had been idling which they often did for hours incase they wouldn’t restart.In the 1970s and 1980s the locos were not the pollution issue, it was the first generation DMUs. It got much worse when the Cross City service started (1960s New Street was not designed for that), especially as Tyseley got some fairly ropey cast offs from other regions to increase the size of their fleet. The Etches Park Swindon cross country units were fairly gruesome too.
That’s what Was proposed a couple or so years back but wasn’t taken forward.Given my expectation that the Voyagers will be flogged to death for another 15 years or more, I wonder if they could be fitted with (in an existing space) with a tiny low power battery capability just enough to tow the unit into and out of the platforms at New Street and power the lights etc. while at platform, with the diesel engines all shut down? Or is that an absurd idea?
Or do something similar to what I posted earlier in this thread- Setup the 220/221s so they only have one engine running per 4/5 car in the New Street area, then once clear of the Station, fire up all of the turned off engines.Given my expectation that the Voyagers will be flogged to death for another 15 years or more, I wonder if they could be fitted with (in an existing space) a tiny low power battery capability just enough to tow the unit into and out of the platforms at New Street and power the lights etc. while at platform, with the diesel engines all shut down? Or is that an absurd idea?
So I assume the DfT effectively vetoed it as "not value for money"?That’s what Was proposed a couple or so years back but wasn’t taken forward.
I suppose so. Same with Project Thor several years earlier. Needs to be cost effective.So I assume the DfT effectively vetoed it as "not value for money"?
Given my expectation that the Voyagers will be flogged to death for another 15 years or more, I wonder if they could be fitted with (in an existing space) a tiny low power battery capability just enough to tow the unit into and out of the platforms at New Street and power the lights etc. while at platform, with the diesel engines all shut down? Or is that an absurd idea?
Beyond any cost implication, both of these possible ideas would come with performance risks both in terms of reduced power levels during acceleration, and increased load/wear on drivetrain components from stop-start.Or do something similar to what I posted earlier in this thread- Setup the 220/221s so they only have one engine running per 4/5 car in the New Street area, then once clear of the Station, fire up all of the turned off engines.
You're right. I wonder how much fuel the Eco Mode system which Class 185s use saves them. Could something similar to this be fitted to 220/221s which automatically turns all but one engine off whilst it's at New Street/exiting the Station?Beyond any cost implication, both of these possible ideas would come with performance risks both in terms of reduced power levels during acceleration, and increased load/wear on drivetrain components from stop-start.
Over the right ground/with long enough gaps between savings can become of sufficient value. But it requires factors such as the route, calling pattern, timetable and technical choices, to work together.You're right. I wonder how much fuel the Eco Mode system which Class 185s use saves them. Could something similar to this be fitted to 220/221s which automatically turns all but one engine off whilst it's at New Street/exiting the Station?
Perhaps something could be done with stopping positions?We spend a fortune at New Street on extractor fans and air filtration/purification and the like. But it’s all sticking plasters until no diesels run through.
Build the Bordesley Chords and move the NE-SW XC Voyager services to Moor Street.What needs to be done at Birmingham new street to improve the air quality?