2 trains within 4 minutes, nothing for 56, 2 trains within 1 minute. Durham really got the short end of the stick!The timetable provides at least two trains per hour:
(Image shows actual schedule separation between two (practically adjacent) ECML stations.)
But do they depart better spaced at 02, 27 & 40 for most of the day with an occasional 33 thrown in too?2 trains within 4 minutes, nothing for 56, 2 trains within 1 minute. Durham really got the short end of the stick!
Even in the evening, services depart at 20:04, 20:30, 20:58, 21:02, 21:58, 21:59, 22:24, 22:41. There's that one awkward gap but nothing runs south at all in it, so its not like Durham is being skipped.But do they depart better spaced at 02, 27 & 40 for most of the day with an occasional 33 thrown in too?
Thanks. Thats what I thought. Not bad service at all.Even in the evening, services depart at 20:04, 20:30, 20:58, 21:02, 21:58, 21:59, 22:24, 22:41. There's that one awkward gap but nothing runs south at all in it, so its not like Durham is being skipped.
Hard to say that's good if I arrive at the latter half of the hou….
Not sure how that 28% been measured. the 3tph you refer to has only been in operation for less than 3 months. Surely most of that is applicable to the previous timetable (around 9 months).28.8% growth year on year from Newcastle is very impressive with its three LNER services each hour to/from Kings Cross.
Depends who you hear from. PPM wise its doesn't seem too bad but Right Time is rather less rosy.It’s been extremely successful performance wise from what I have witnessed. For me connections at Peterborough are much improved and direct services north of Edinburgh are back after being absent for many years.
I'm not familiar enough with Durham bus timetables to say how many bus routes don't give you that choice (or that of a better connection to Newcastle elsewhere).There’s an easy way to avoid that…
Can anyone say how many freight paths were squeezed out of the timetable in order to make it work?Network Rail spent a lot of time and money ensuring it would work.
The amount of briefing, assurance, testing and resilience put into it was massive. From rosters, logistics, track access, asset management etc. it was quite the project.
It states in the first two months since the timetable was launched compared to the same two months last year. Other than that I’m confused by what you mean.Not sure how that 28% been measured. the 3tph you refer to has only been in operation for less than 3 months. Surely most of that is applicable to the previous timetable (around 9 months).
Depends who you hear from. PPM wise its doesn't seem too bad but Right Time is rather less rosy.
Can anyone say how many freight paths were squeezed out of the timetable in order to make it work?
And lots have been squeezed in during week 2 & 3.I can. None.
Can anyone say how many freight paths were squeezed out of the timetable in order to make it work?
I can. None.

There is similar on a Sunday (not looked on Saturday). In a few weeks I am returning on the 11.43 to York on Sunday morning which is also P10 (having come in from the depot).One interesting change with the new timetable, as I found this morning, is that the Up Hull Executive (for those with a long memory) is booked to arrive at King's Cross in platform 10. As I discussed with the driver, it's like arriving in a different station. The service is booked for a 5-car.
Also spotted the 16:41 arrival from York is booked into P10, then empty stock to Bowes Park loop.
View attachment 199448
Image. LNER train in platform ten at London King's Cross.
Today, at least, it goes out at 1040 to Harrogate (looks to on another couple of days I've looked, too).One interesting change with the new timetable, as I found this morning, is that the Up Hull Executive (for those with a long memory) is booked to arrive at King's Cross in platform 10. As I discussed with the driver, it's like arriving in a different station. The service is booked for a 5-car.
Also spotted the 16:41 arrival from York is booked into P10, then empty stock to Bowes Park loop.
View attachment 199448
Image. LNER train in platform ten at London King's Cross.
They've been using 9 and 10 ever since they started going to Middlesbrough a few years ago.Today, at least, it goes out at 1040 to Harrogate (looks to on another couple of days I've looked, too).
The 1641 from York arrives on 10 before moving to platform 8, via Bowes Park loop, and then on to Middlesborough at 1845.
28.8% growth year on year from Newcastle is very impressive with its three LNER services each hour to/from Kings Cross.
Your post refers to 28% year on year growth highlighted above but clearly given that the new timetable has only been around for 2 to 3 months I don't see how that can be mainly down to the new timetable, its not been operating for a year yet never mind totally, still some trains missing from the TT.It states in the first two months since the timetable was launched compared to the same two months last year. Other than that I’m confused by what you mean.
I expect they have compared the 4 week reporting periods since the change with the equivalent 4 week periods in the prior year.Your post refers to 28% year on year growth highlighted above but clearly given that the new timetable has only been around for 2 to 3 months I don't see how that can be mainly down to the new timetable, its not been operating for a year yet never mind totally, still some trains missing from the TT.
Certainly up until now, that 2003 (1S32) has been extremely quiet up to Edinburgh. Only seems to be busy whenever Newcastle United are playing an evening match.Having just travelled, can I just say how excellent it is to have 1930 and 2003 departures from Kings Cross to Edinburgh. Makes all the difference not to have to rush quite so much at the end of a full working day in London.
Certainly up until now, that 2003 (1S32) has been extremely quiet up to Edinburgh. Only seems to be busy whenever Newcastle United are playing an evening match.
I’m sure as the busier period comes along, it will pick up a bit. The Lumo leaving London at 2030 is considerably busier to Edinburgh, so it must be a pricing issue.
So as a frequent user of the ECML, and in particular the Leeds service, I must say this recast seems to heavily disrupt the Yorkshire services for very marginal gains elsewhere in the country.
Lets start with capacity. At Leeds, we've moved from regular 9 or 10 coach trains, to frequent 5 or 7 coach formations. As a "turn up and go" user for work, I have stood on near every mk4 set I've travelled on. It really rubs salt in the wound when observing the poor use of unit resource, eating up station capacity across Yorkshire. Turn around dwell at both Leeds and Bradford is now near 2 hours, not just depriving the user of the capacity that unit could be providing in traffic, but also eating up station capacity at one of the busiest stations in the north.
Then there's reliability. Owing to the decision to move the southbound departures 5 minutes earlier, the xx40 departure frequently misses its path at Doncaster owing to catching up the xx20 NT stopper. This results in delays along the ECML, which proceeds to break the few remaining viable connections (eg: Grantham to Nottingham) that haven't already been sacraficed.
In my experience, this is a very London centric timetable. It feels to have been launched for commercial reasons rather than meeting the needs of all customers.
The overall experience is a half-baked solution to a very ambitious timetable proposal from almost a decade ago, realising only a handful of the targets on the original wish list and to the detriment of more than just a handful of users.
Indeed. A year-on-year increase of 28% at Newcastle is pretty good, but I'd like to see the figures from Leeds, Wakefield, Durham, Berwick, Grantham etc.So as a frequent user of the ECML, and in particular the Leeds service, I must say this recast seems to heavily disrupt the Yorkshire services for very marginal gains elsewhere in the country.
Lets start with capacity. At Leeds, we've moved from regular 9 or 10 coach trains, to frequent 5 or 7 coach formations. As a "turn up and go" user for work, I have stood on near every mk4 set I've travelled on. It really rubs salt in the wound when observing the poor use of unit resource, eating up station capacity across Yorkshire. Turn around dwell at both Leeds and Bradford is now near 2 hours, not just depriving the user of the capacity that unit could be providing in traffic, but also eating up station capacity at one of the busiest stations in the north.
Then there's reliability. Owing to the decision to move the southbound departures 5 minutes earlier, the xx40 departure frequently misses its path at Doncaster owing to catching up the xx20 NT stopper. This results in delays along the ECML, which proceeds to break the few remaining viable connections (eg: Grantham to Nottingham) that haven't already been sacraficed.
In my experience, this is a very London centric timetable. It feels to have been launched for commercial reasons rather than meeting the needs of all customers.
The overall experience is a half-baked solution to a very ambitious timetable proposal from almost a decade ago, realising only a handful of the targets on the original wish list and to the detriment of more than just a handful of users.
Indeed. A year-on-year increase of 28% at Newcastle is pretty good, but I'd like to see the figures from Leeds, Wakefield, Durham, Berwick, Grantham etc.
Then there's reliability. Owing to the decision to move the southbound departures 5 minutes earlier, the xx40 departure frequently misses its path at Doncaster owing to catching up the xx20 NT stopper.
But that is timetabled. If the xx40 is missing it’s path, then the xx20 stopper must be late. So that needs sorting.