HSTEd
Veteran Member
- Joined
- 14 Jul 2011
- Messages
- 20,383
In case of resignalling of the line to Whitby, which is going to be necessary sooner or later, you could shave off signalling equipment by building the curve.
It eliminates equipment positioned in an annoying location, and reduces the number of SEU necessary to do the work.
Given resignalling capacity is in extremely short supply, anything that can simplify a layout would be justifiable.
EDIT:
Multiple token changes have been estimated to increase journey times by seven minutes alone.
But if Saltburn can't justify electrification, I doubt Whitby can, so probably off topic.
It eliminates equipment positioned in an annoying location, and reduces the number of SEU necessary to do the work.
Given resignalling capacity is in extremely short supply, anything that can simplify a layout would be justifiable.
EDIT:
Multiple token changes have been estimated to increase journey times by seven minutes alone.
But if Saltburn can't justify electrification, I doubt Whitby can, so probably off topic.
Last edited: