• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Southeastern services to City Thameslink station.

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

CarrotPie

On Moderation
Joined
18 Mar 2021
Messages
1,128
Location
Wikipedia suggests its was the 387, 70 sets in all by the way I read it: Class 387
I can't see that anywhere. The 387s only operated on Thameslink for a few years as a stopgap measure to allow the 319s and 377s to be withdrawn quicker than when the 700s arrived. After that, they've ended up in the GTR lucky dip of Electrostars, which is sort of what was intended for them in the first place.

I remember reading somewhere on these forums that the 375s were built for Thameslink 2000 in mind
There is a thread about this here and additional posts here, here and here. Some of them even suggest that the reason for the pantographs was because they were intended to be used on HS1, which is...interesting, to say the least. :|

Does anyone know if the pantographs are still there, and if so, whether SE bother maintaining them anymore, considering they never run under the wires?
 

Sad Sprinter

Established Member
Joined
5 Jun 2017
Messages
3,186
Location
Way on down South London town
Yes Indeed! Longitude seating of the Overground train wouldn't be welcome!



Wikipedia suggests its was the 387, 70 sets in all by the way I read it: Class 387

I can't see that anywhere. The 387s only operated on Thameslink for a few years as a stopgap measure to allow the 319s and 377s to be withdrawn quicker than when the 700s arrived. After that, they've ended up in the GTR lucky dip of Electrostars, which is sort of what was intended for them in the first place.


There is a thread about this here and additional posts here, here and here. Some of them even suggest that the reason for the pantographs was because they were intended to be used on HS1, which is...interesting, to say the least. :|

Does anyone know if the pantographs are still there, and if so, whether SE bother maintaining them anymore, considering they never run under the wires?

That doesn’t surprise me, because NSE first proposed running HS1 trains onto Thameslink. Although their train would still have been a high speed train, maybe by the late 90s there was no specification for a high speed domestic train and so any design was a possibility.
 

RichJF

Member
Joined
2 Nov 2012
Messages
1,199
Location
South London
I can't see that anywhere. The 387s only operated on Thameslink for a few years as a stopgap measure to allow the 319s and 377s to be withdrawn quicker than when the 700s arrived. After that, they've ended up in the GTR lucky dip of Electrostars, which is sort of what was intended for them in the first place.


There is a thread about this here and additional posts here, here and here. Some of them even suggest that the reason for the pantographs was because they were intended to be used on HS1, which is...interesting, to say the least. :|

Does anyone know if the pantographs are still there, and if so, whether SE bother maintaining them anymore, considering they never run under the wires?
The pantographs are still there. I got on a 375/6 the other day :)
 

Tangent

Member
Joined
6 Jun 2012
Messages
72
Yes that’s plausible.
I recall one incident during the London Bridge rebuild; I think it happened when Cannon Street trains could not call at London Bridge. An Up train for Charing Cross was given the wrong road at St John's Junction, and continued regardless on its way to Cannon Street. I noticed we were on the wrong road for Charing Cross; but none of the other passengers seemed to notice, and the driver made no announcement until we reached the station throat at London Bridge, to general consternation.
 

Mattplans

Member
Joined
27 Sep 2024
Messages
695
Location
London, UK
Up train for Charing Cross was given the wrong road at St John's Junction, and continued regardless on its way to Cannon Street. I noticed we were on the wrong road for Charing Cross; but none of the other passengers seemed to notice.

They can still crossover back to the Kent Fasts (Charing X lines) after New Cross. Contrary to what has been claimed by Southeastern to justify lack of trains from New Cross to Charing X
 

FR510

Member
Joined
20 Oct 2020
Messages
111
Location
Kent
They can still crossover back to the Kent Fasts (Charing X lines) after New Cross. Contrary to what has been claimed by Southeastern to justify lack of trains from New Cross to Charing X
Yes, North Kent East Junction and the Southwark Reversible line, which is what the Rainham Thameslinks use when they come off the Greenwich line. Although if too many trains did that it would have pathing issues.
 

PZ 08895

Member
Joined
12 Apr 2022
Messages
54
Location
Horsham
Huh. So then how come 375s aren't cleared? They're basically the same as 377s...
I am not certain that this is the reason, but the OLE is exceptionally low around City Thameslink due to low clearance from a structure above. When the 377/5s, which at one stage ran through the Thameslink Cire were first fitted with GSM-R (train radios) shark-fin antennas (aerials) it was realised that they did not have the necessary clearance to the OLE around City Thameslink and they were then replaced with a lower-profile antenna. It could be the case that the 375 do not have these lower profile antennas and are therefore not cleared.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
I am not certain that this is the reason, but the OLE is exceptionally low around City Thameslink due to low clearance from a structure above. When the 377/5s, which at one stage ran through the Thameslink Cire were first fitted with GSM-R (train radios) shark-fin antennas (aerials) it was realised that they did not have the necessary clearance to the OLE around City Thameslink and they were then replaced with a lower-profile antenna. It could be the case that the 375 do not have these lower profile antennas and are therefore not cleared.
That’s how it was explained at the time, ie around 2011. There was a period when the OHLE through City Thameslink was fitted but permanently earthed, because 375s were still booked but fouled the overhead. There was a network change notice I remember looking up, but it didn’t give an explicit reason, just the fact that the wires would not be switched on until 465? and 375 services ceased. The different rooftop aerials on certain classes were then mentioned in later forum discussions.

I found my post which includes the NR Summary of the situation:
 
Last edited:

Sad Sprinter

Established Member
Joined
5 Jun 2017
Messages
3,186
Location
Way on down South London town
I am not certain that this is the reason, but the OLE is exceptionally low around City Thameslink due to low clearance from a structure above. When the 377/5s, which at one stage ran through the Thameslink Cire were first fitted with GSM-R (train radios) shark-fin antennas (aerials) it was realised that they did not have the necessary clearance to the OLE around City Thameslink and they were then replaced with a lower-profile antenna. It could be the case that the 375 do not have these lower profile antennas and are therefore not cleared.

Presumably they didnt have lower profiles because of their possible use for HS1?
 
Status
Not open for further replies.

Top