Interesting. Say, express trains going north going via Welwyn and those south on the WAML. I wonder what the improvement to journey times would be.
''In this article we will hypothesise Elizabeth line services on to the ECML via the West Anglia Main Line (WAML). Elizabeth line services on the ECML could replace some existing services to Kings Cross thereby taking pressure off the two track section between Knebworth and Welwyn Garden City. The terminology employed for this is capacity release. The result in this case is an increase in the overall capacity of the ECML, with some services via Welwyn and some Elizabeth line services.''
''The Integrated Rail Plan published in November 2021 emphasises the need to upgrade the ECML and remove bottlenecks. The document is available here : Integrated Rail Plan for the North and Midlands (pdf format, opens in new window or tab). The document can be searched for east coast, with pertinent results on pages 14, 76, 84, 113 and 114. On page 114 "The detailed scope for further upgrade of the East Coast Main Line between London and Leeds and the North East, including elements identified by the NPR programme, will be confirmed following a further study."''
Network Rail say of in-cab signalling:
''We expect the first trains to operate on the East Coast Main Line using this digital signalling technology by the end of 2025. We plan to complete all improvements by 2030.''
Expected Journey Time Improvements from London to York and Darlington by up to 15 minutes, and to Leeds by approximately 20 minutes. Edinburgh could be reduced by around 25 minutes. Sounds good.
''In this article we will hypothesise Elizabeth line services on to the ECML via the West Anglia Main Line (WAML). Elizabeth line services on the ECML could replace some existing services to Kings Cross thereby taking pressure off the two track section between Knebworth and Welwyn Garden City. The terminology employed for this is capacity release. The result in this case is an increase in the overall capacity of the ECML, with some services via Welwyn and some Elizabeth line services.''
''The Integrated Rail Plan published in November 2021 emphasises the need to upgrade the ECML and remove bottlenecks. The document is available here : Integrated Rail Plan for the North and Midlands (pdf format, opens in new window or tab). The document can be searched for east coast, with pertinent results on pages 14, 76, 84, 113 and 114. On page 114 "The detailed scope for further upgrade of the East Coast Main Line between London and Leeds and the North East, including elements identified by the NPR programme, will be confirmed following a further study."''
Network Rail say of in-cab signalling:
''We expect the first trains to operate on the East Coast Main Line using this digital signalling technology by the end of 2025. We plan to complete all improvements by 2030.''
Expected Journey Time Improvements from London to York and Darlington by up to 15 minutes, and to Leeds by approximately 20 minutes. Edinburgh could be reduced by around 25 minutes. Sounds good.