Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Every single station they pass through has a "bubble" around the platforms in the database, when a unit is within the bubble the lights will light up until the doors are released, they stay lit on any that arent released until it leaves the bubble again.
Yes, they still work exactly the same. Over ride stations work in the same way with regards to that.
At stations it knows, the doors that will open extinguish when it enters the bubble, the doors that ASDO wont allow remain lit as not in use. At a station the ASDO doesn't know, all doors light as out of use unless manually overridden by the guard.
At stations it knows, the doors that will open extinguish when it enters the bubble, the doors that ASDO wont allow remain lit as not in use. At a station the ASDO doesn't know, all doors light as out of use unless manually overridden by the guard.
Does anyone in here know why, after the 197029+197030 duo worked the above 16 (4+10+2) runs on the Cambrian, the schedules just cut off? It's now been nearly a week since the last one ran, and I haven't seen a schedule for them going back off the Cambrian either.
A few shown as failed overnight and also some on one way trips to Chester for repair so not the greatest day availability wise.
Its not as bad as it would have been a few weeks back now most of the units which had the cracks are now repaired and back out.
== Doublepost prevention - post automatically merged: ==
I thought I'd post these photos / video stills (attached) in here, as I'm not sure how many people in here had actually seen these views of a 197, taken by drone in the factory aka CAF Newport, Llanwern (other than people who actually work underneath 197s), as they were "hidden" in a YouTube video that doesn't have "197" in the title or description.
I thought I'd post these photos / video stills (attached) in here, as I'm not sure how many people in here had actually seen these views of a 197, taken by drone in the factory aka CAF Newport, Llanwern (other than people who actually work underneath 197s), as they were "hidden" in a YouTube video that doesn't have "197" in the title or description.
== Doublepost prevention - post automatically merged: ==
I thought I'd post these photos / video stills (attached) in here, as I'm not sure how many people in here had actually seen these views of a 197, taken by drone in the factory aka CAF Newport, Llanwern (other than people who actually work underneath 197s), as they were "hidden" in a YouTube video that doesn't have "197" in the title or description.
Wow how clean is that place and the unit too. Going by the date of 6/21 the unit possibly could be 003 as in picture 3 it shows part of the ERTMS/ETCS equipment.
Other pictures include No 4, on the R/H side shows, the compressor and its oil cooler. Pictures 7+8 show bits of Powerpack. Picture 9 shows parts of the Glycol heating system. The rest of the pictures are pretty straight forward. Non of this looks that clean now
Wow how clean is that place and the unit too. Going by the date of 6/21 the unit possibly could be 003 as in picture 3 it shows part of the ERTMS/ETCS equipment.
Other pictures include No 4, on the R/H side shows, the compressor and its oil cooler. Pictures 7+8 show bits of Powerpack. Picture 9 shows parts of the Glycol heating system. The rest of the pictures are pretty straight forward. Non of this looks that clean now
== Doublepost prevention - post automatically merged: ==
I thought I'd post these photos / video stills (attached) in here, as I'm not sure how many people in here had actually seen these views of a 197, taken by drone in the factory aka CAF Newport, Llanwern (other than people who actually work underneath 197s), as they were "hidden" in a YouTube video that doesn't have "197" in the title or description.
Llanwern assembled some (or most) of the 196s, something like 23 later 195s and 331111, in addition to all of the 197s (well, 197041 is still to come out) and some? of the Israel? trains/trams.
They'll also assemble 897003-897010, I believe.
== Doublepost prevention - post automatically merged: ==
If they are part of the structure then are the redundant catering cupboards big enough for a loo ?. Or could be incorporated as part of a loo. I doubt it is possible but really an extra toilet would be more useful judging by comments. At least the space would be used.
The catering cupboards currently get used to store emergency drinking water, and also some cleaning supplies, toilet paper stock, bin bags etc. They all come in handy! The big section of the catering unit designed to house the trolley however is hardly used. Sometimes the hosts put the trolleys in if theyre taking their break.
Last i heard (admittedly a while ago) they were looking at altering the cupboard door so it wont block the aisle, and trolleys would be based in the cupboard with at seat ordering via QR codes at some point, whether theyre still planning to im not sure.
In my mind an option would be to take the big cupboard door off and fit a luggage rack inside, luggage space could be better on these units especially on Airport services.
Which is extremely good design. Not. Passengers waiting to get off then believe the door is broken, or will be off the platform, so start walking to the next door which is also 'out of use', maybe panic and run to the next one and so on. Until regular users tell them it's just like that.
Yep, I've been there myself. All CAF units do it. It causes unnecessary panic. How are passengers meant to determine if a door is genuinely out of use or off the platform if that message appears at every station?
Thanks very much, so it should end around the 20/3/26 then - helps with my planning of things.
== Doublepost prevention - post automatically merged: ==
I've been informed of 4 schedules for (a) different 197(s) running from Shrewsbury Abbey Foregate CS to Welshpool and back (twice) in the early hours of Thu 19/2/26:
Real-time train running information for 3C00 0055 departure from Shrewsbury Abbey Frgte Cs to Welshpool on 19/02/2026. From Realtime Trains, an independent source of train running info for Great Britain.
Real-time train running information for 3C01 0130 departure from Welshpool to Shrewsbury Abbey Frgte Cs on 19/02/2026. From Realtime Trains, an independent source of train running info for Great Britain.
Real-time train running information for 3C02 0221 departure from Shrewsbury Abbey Frgte Cs to Welshpool on 19/02/2026. From Realtime Trains, an independent source of train running info for Great Britain.
Real-time train running information for 3C03 0255 departure from Welshpool to Shrewsbury Abbey Frgte Cs on 19/02/2026. From Realtime Trains, an independent source of train running info for Great Britain.
www.realtimetrains.co.uk
As this will be during 197029+197030s' maintenance staff training at Machynlleth, this could quite possibly be the first time that 3 or 4 197s will be on the Cambrian simultaneously (even if not all "out" running) rather than just 2.
Thanks very much, so it should end around the 20/3/26 then - helps with my planning of things.
== Doublepost prevention - post automatically merged: ==
I've been informed of 4 schedules for (a) different 197(s) running from Shrewsbury Abbey Foregate CS to Welshpool and back (twice) in the early hours of Thu 19/2/26:
Real-time train running information for 3C00 0055 departure from Shrewsbury Abbey Frgte Cs to Welshpool on 19/02/2026. From Realtime Trains, an independent source of train running info for Great Britain.
Real-time train running information for 3C01 0130 departure from Welshpool to Shrewsbury Abbey Frgte Cs on 19/02/2026. From Realtime Trains, an independent source of train running info for Great Britain.
Real-time train running information for 3C02 0221 departure from Shrewsbury Abbey Frgte Cs to Welshpool on 19/02/2026. From Realtime Trains, an independent source of train running info for Great Britain.
Real-time train running information for 3C03 0255 departure from Welshpool to Shrewsbury Abbey Frgte Cs on 19/02/2026. From Realtime Trains, an independent source of train running info for Great Britain.
www.realtimetrains.co.uk
As this will be during 197029+197030s' maintenance staff training at Machynlleth, this could quite possibly be the first time that 3 or 4 197s will be on the Cambrian simultaneously (even if not all "out" running) rather than just 2.
Good question; it certainly seems rather unlikely, particularly since they appear to still have a window there when viewed from outside. (EDIT: for clarity, this is the catering cupboard we're talking about). I also note above that somebody asked if it could be replaced by a toilet; however the seat plans show it to be located in the same coach as the existing (wheelchair-accessible) toilet, so presumably there wouldn't be space for the required water/waste tank(s) compared to if it was in the other driving vehicle.
Good question; it certainly seems rather unlikely, particularly since they appear to still have a window there when viewed from outside. (EDIT: for clarity, this is the catering cupboard we're talking about). I also note above that somebody asked if it could be replaced by a toilet; however the seat plans show it to be located in the same coach as the existing (wheelchair-accessible) toilet, so presumably there wouldn't be space for the required water/waste tank(s) compared to if it was in the other driving vehicle.
Maybe, but at least there have now been some driver training runs from Machynlleth to Aberystwyth and back, from Machynlleth to Pwllheli and back, and from Machynlleth to Shrewsbury and back, in December 2025, January 2026 and early February 2026 with 197029+197030 (following the pre-driver-training check runs in November 2025, which was also when the September 2026 entry-to-service date was set).
(When I say driver training by the way, I do mean guard as well - in fact, I heard that as of late January it's being done with more proper guard stuff).
The duo are now 1 week into 6-week maintenance staff training at Machynlleth depot, which should finish around the 20/3/26, then theoretically there will be a decent 5 months of driver training from April to August before the start of entry-to-service in September.
Maybe, but at least there have now been some driver training runs from Machynlleth to Aberystwyth and back, from Machynlleth to Pwllheli and back, and from Machynlleth to Shrewsbury and back, in December 2025, January 2026 and early February 2026 with 197029+197030 (following the pre-driver-training check runs in November 2025, which was also when the September 2026 entry-to-service date was set).
(When I say driver training by the way, I do mean guard as well - in fact, I heard that as of late January it's being done with more proper guard stuff).
The duo are now 1 week into 6-week maintenance staff training at Machynlleth depot, which should finish around the 20/3/26, then theoretically there will be a decent 5 months of driver training from May to August before the start of entry-to-service in September.
I don't know how many times, and at this point I don't actually know whether it was originally meant to be 2022 or 2023.
== Doublepost prevention - post automatically merged: ==
Does anyone in here know what exactly the schedules for Thu 19/2/26 are for? They're in the early hours of the morning, but are stated as being operated by Transport for Wales / TfW and have the 3C0x headcodes (also used by the daytime TfW driver training runs), and are only Shrewsbury AFCS-Welshpool-Shrewsbury AFCS-Welshpool-Shrewsbury AFCS
(the Rail Operations Group-operated ETCS mileage accumulation runs in 2025, with 3Q9x - later 3Q8x - headcodes, were also in the early hours of the morning, but were Crewe South Yard-Machynlleth-Welshpool-Newtown-Crewe South Yard).
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.