Not really. If HS2 services at Handsacre are extended a short distance to connect directly with the Colwich–Stone line, and operate as a through route rather than a speed-reducing branch, this enables a grade-separated connection south of Stone to rejoin the WCML north of Norton Bridge. That southern connection is operationally fundamental, as it allows Manchester-bound services to diverge from Liverpool and Scottish services at an appropriate point south of Stone, rather than forcing all long-distance flows through Crewe.If you want to do the Stafford bypass the sensible thing is to stick with the right of way set aside for HS2 phase 2a and to do at least the bottom 3/4s.
This service separation is essential to efficient network operation. Manchester services already have a suitable and resilient corridor via Stoke, whereas Liverpool and Scottish services are structurally dependent on the Colwich-Crewe axis. By dividing these flows south of Stone, fast intercity services can be distributed across the network in a way that maximises capacity, and timetable flexibility. This outcome cannot be achieved under the HS2 Phase 2a design, which would route Manchester services unnecessarily via Crewe, introducing additional conflicting movements and compounding capacity pressures at a location where those services are not required.
From a value-for-money perspective, the Handsacre to Stone through connection with WCML link would deliver the key network benefits associated with Phase 2a - namely removal of fast services from the constrained WCML south of Norton Bridge - at significantly lower capital cost, reduced delivery risk, and with fewer environmental and consenting challenges. It therefore represents a more proportionate and targeted response to the underlying capacity and performance constraints.
Given that the Phase 2a alignment has now been cancelled and that HS2 Phase One services will already have high-speed intercity operation, there is limited practical justification for revisiting a large-scale Crewe-oriented solution. A focused intervention that aligns service routing with actual network need provides a clearer strategic fit with current GBR objectives around affordability, operational simplicity and whole-network optimisation.