Falcon1200
Established Member
Do you mean between Primrose Hill and Camden Road?
I did indeed, thanks! Post duly edited. Thanks also to you and @Nippy for explaining what happened.
Do you mean between Primrose Hill and Camden Road?
Caledonian Sleeper is booked to (and usually does) use the route when routed via the East Coast Main Line.Can someone clarify which, if any, passenger services pass through the site of the closed Primrose Hill station?
I'm not too familiar with the Overground lines in North London, it all looks a little complex.
Is this the reason why there have been "Severe Delays" on the Mildmay line today?staff book on at Euston!!
Thoughts are with the owners of the two businesses, hopefully they will be back on their feet as soon as possible.
So, is (or was) the building actually in use at the time then?
Not so good news. According to the late notice case the building is being demolished and both lines will remain blocked until works are complete.The good news is appears no one was hurt during the incident, and outwardly it may be that the building can be salvaged in some way.
I was restday yesterday but was told there was no relieving driver for a freight at Willseden which blocked the lines.Is this the reason why there have been "Severe Delays" on the Mildmay line today?
The TfL status page says Severe Delays due to unavailablity of train operators.
At the moment it’s not working because some share slots with GOBLIN freight so there will have to be temporary changes to the timetables of these freights..A prolonged closure will cause issues on the Mildmay line if all the freights have to go via Gospel Oak.
Is it really going to be that quick? Demolishing a building over a railway seems like a difficult job?Provisional milestone for the line to reopen is Monday 9th Feb.
I'm no structural engineer, but I have to admit when I first saw that update I considered it optimistic.Is it really going to be that quick? Demolishing a building over a railway seems like a difficult job?
Is it really going to be that quick? Demolishing a building over a railway seems like a difficult job?
I think it will depend on whether they retain the flat slab over the old platform and tracks, and just remove the walls and roof. The whole ‘deck’ removal would presumably be a bigger job, especially if it’s integral with the road bridge outside the former station building, (that’s more about the eastbound track).Is it really going to be that quick? Demolishing a building over a railway seems like a difficult job?
I would say that was a 'Category A' priority.They can really get engineering work done when they want to... cf. The collapsed wall on the approach to Lime Street reopening in under a week: https://www.bbc.co.uk/news/uk-england-merseyside-39183313
Looking basically the same as Sunday from what I can see. Not a lot has happened clearly.Photo from this afternoon.
Compared to the lines next door out of Euston, around 10 freights a day and some ECS moves is not ‘a crucial link in the network’!I can well imagine work to demolish it, and restore and re-open the line will happen quickly - it's a fairly crucial link in the network.
Looking basically the same as Sunday from what I can see. Not a lot has happened clearly.
== Doublepost prevention - post automatically merged: ==
Compared to the lines next door out of Euston, around 10 freights a day and some ECS moves is not ‘a crucial link in the network’!
But those freights carry things a lot more useful than all those trains in and out of Euston.Looking basically the same as Sunday from what I can see. Not a lot has happened clearly.
== Doublepost prevention - post automatically merged: ==
Compared to the lines next door out of Euston, around 10 freights a day and some ECS moves is not ‘a crucial link in the network’!
The freights are being delayed by around 10 minutes and are almost all ending up at their destination on time so I’m not quite sure what you’re on about. If it was the Felixstowe branch obviously different story.But those freights carry things a lot more useful than all those trains in and out of Euston.
The disruption to those freight services will mean that the just in time logistics operation that most firms operate will fail. Which will mean some items won't be delivered to the supermarket hubs in time so those items will miss the lorry delivering to your supermarket so there will be an empty shelf when you visit it and complain that you cannot get something.
What I was on about was that if those intermodel services were seriously delayed, the effects would be felt by more people in the UK than would be any delays to the passenger services out of Euston.The freights are being delayed by around 10 minutes and are almost all ending up at their destination on time so I’m not quite sure what you’re on about. If it was the Felixstowe branch obviously different story.
It may be possible, the platform 6 to 9 look by-directional with crossovers at both ends.How easy is it to reverse trains at Watford or even Harrow (it has been done by Virgin in the distant past) as you could then arrange a bus service to Watford (Met). Presumably crewing and platforming would be difficult and it would only work if arranged in advance.
Watford is doable - Harrow is now not.How easy is it to reverse trains at Watford or even Harrow (it has been done by Virgin in the distant past) as you could then arrange a bus service to Watford (Met). Presumably crewing and platforming would be difficult and it would only work if arranged in advance.
Harrow was done when there was engineering works south of Wembley. The units went on to the Willesden Relief Lines to reverse.How easy is it to reverse trains at Watford or even Harrow (it has been done by Virgin in the distant past) as you could then arrange a bus service to Watford (Met). Presumably crewing and platforming would be difficult and it would only work if arranged in advance.