Haymarket to Dalmeny electrification

Avenger20

Member
Joined
8 Aug 2011
Messages
284
Just as an aside, there is still two passengers services per day passing Dalmeny during the closure. 1N79 and 1N80 both continue to run booked route to/from Glasgow Queen Street.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

RiverDon

On Moderation
Joined
11 Mar 2024
Messages
297
Location
UK
The 1B16 Caledonian Sleeper service has left the Dalmeny section, and thus concludes the unelectrified nature of the Haymarket - Dalmeny line.

The line closure has now officially begun. See yous all in 9 days on the other (electrified) side.
Just FYI and you maybe already know this but it's not being switched on when the line reopens. The wires will be 'permanently' earthed until some later time.
 

RiverDon

On Moderation
Joined
11 Mar 2024
Messages
297
Location
UK
Just as an aside, there is still two passengers services per day passing Dalmeny during the closure. 1N79 and 1N80 both continue to run booked route to/from Glasgow Queen Street.
I don't think that's right, I just looked at the WON and the closure is on continuously from Haymarket Central Junction to Inverkeithing for the whole period. The only access for trains is to platform 1 at Inverkeithing. Also they are fixing a bridge at Dalmeny station which requires a bit of both platforms to be removed.
 

Avenger20

Member
Joined
8 Aug 2011
Messages
284
I don't think that's right, I just looked at the WON and the closure is on continuously from Haymarket Central Junction to Inverkeithing for the whole period. The only access for trains is to platform 1 at Inverkeithing. Also they are fixing a bridge at Dalmeny station which requires a bit of both platforms to be removed.
Curious. The Scotrail app and RTT both suggest that those services are running as booked but having checked the WON myself you are indeed correct. Will see what happens on Monday.
 

TrainViation

Member
Joined
25 Jun 2025
Messages
293
Location
Glenrothes
From a semi-reliable source, it was said that "hopefully they'll get things moving to get the OLE up on Wednesday".
Makes sense considering most of the movements are Wednesday onwards.
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,203
Just FYI and you maybe already know this but it's not being switched on when the line reopens. The wires will be 'permanently' earthed until some later time.
When do we expect the wires to be stollen?
 

ajwffc

Member
Joined
30 Sep 2023
Messages
72
Location
Scotland
The 1B16 Caledonian Sleeper service has left the Dalmeny section, and thus concludes the unelectrified nature of the Haymarket - Dalmeny line.

The line closure has now officially begun. See yous all in 9 days on the other (electrified) side.
and was late a delayed the start
I don't think that's right, I just looked at the WON and the closure is on continuously from Haymarket Central Junction to Inverkeithing for the whole period. The only access for trains is to platform 1 at Inverkeithing. Also they are fixing a bridge at Dalmeny station which requires a bit of both platforms to be removed.
only over the weekend it is shortened to Dalmeny this morning as they need the branch for the 20+ engineering trains
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,685
Location
Scotland
only over the weekend it is shortened to Dalmeny this morning as they need the branch for the 20+ engineering trains
Random question but are they doing any work on the Forth Bridge at this time since there's a block? It's not often that they'll have a complete block for this long a period, not sure if there's any deferred maintenance work that they can do at the same time.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,505
Location
Preston Lancs
Random question but are they doing any work on the Forth Bridge at this time since there's a block? It's not often that they'll have a complete block for this long a period, not sure if there's any deferred maintenance work that they can do at the same time.
It would certainly make sense but I fear not sadly!
 

ajwffc

Member
Joined
30 Sep 2023
Messages
72
Location
Scotland
Random question but are they doing any work on the Forth Bridge at this time since there's a block? It's not often that they'll have a complete block for this long a period, not sure if there's any deferred maintenance work that they can do at the same time.
There was work on it over the weekend both to the track over it and on the bridge itself
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
NR Scotland are increasingly good at carrying out work during a block, unrelated to the primary reason for the block. Indeed not just in Scotland - during the Cumbrian blockade recently they also worked on the OHLE in the Lune Valley.
 

TrainViation

Member
Joined
25 Jun 2025
Messages
293
Location
Glenrothes
I’ve heard from a source that NR is now realising the A8 road bridge next to Edinburgh Gateway station is too low to fit wires… that’ll be fun to work around.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,505
Location
Preston Lancs
NR Scotland are increasingly good at carrying out work during a block, unrelated to the primary reason for the block. Indeed not just in Scotland - during the Cumbrian blockade recently they also worked on the OHLE in the Lune Valley.
That really is great to hear.
 

SoloSR334022

Member
Joined
18 Sep 2023
Messages
162
Location
Dechmont, West Lothian, UK
I’ve heard from a source that NR is now realising the A8 road bridge next to Edinburgh Gateway station is too low to fit wires… that’ll be fun to work around.
Is it possible to just drop and re-raise the pantograph through the section, otherwise they'll have to close the bridge in sections as to not completely shut off the A8.
 

rmHawk765

Member
Joined
8 Apr 2025
Messages
770
Location
ECML South
Is it possible to just drop and re-raise the pantograph through the section, otherwise they'll have to close the bridge in sections as to not completely shut off the A8.
It's possible but you'd have to have magnets to trigger it. AFAIK magnets like these are currently only used in neutral sections to switch the VCB off, not to physically lower the panto.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
33,685
Location
Scotland
I’ve heard from a source that NR is now realising the A8 road bridge next to Edinburgh Gateway station is too low to fit wires… that’ll be fun to work around.
Maybe a short section of solid bar conductor, depending on how tight the clearance is?
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,505
Location
Preston Lancs
And the usual voltage control diverters installed either side of the bridge to reduce flashover
Is that the fancy name for surge arrestors around bridges etc?


Like this quoted from the PACE webpage.

Existing tunnel and bridge structures can present challenging environments for rail electrification projects. Low bridges, tightly curved tunnels and listed structures often mean that meeting target electrical clearances requires substantial structural alterations. Reconstruction, track lowering or bridge jacking will add significant project costs and disruption for possessions. Many OLE installations under these structures also add an ongoing maintenance burden to prevent leakage and flashovers.

PACE Networks provide a Low Profile Tunnel Solution and a range of bridge arms that will help you to successfully implement smaller overhead line clearances, reducing the need for reconstruction and making significant project cost savings. They are more adaptable to better fit the existing environment, simpler and lighter, meaning they are faster to install, and require less maintenance than alternatives.
 

Phillipimo

Member
Joined
5 Jan 2013
Messages
237
Location
Portsmouth
Is that the fancy name for surge arrestors around bridges etc?

Here are a couple of screenshots from the video in post #794 of a back cab ride through Edinburgh Gateway in August.

First shows surge arrestors in place on the south side of the A8 bridge (Also visible on Google Streetview).

Second shows the supports for the overhead wires already installed under the bridge.

To me that suggests that this bridge shouldn't be an issue unless there was a big problem with the design which Network Rail have only just realised, but I doubt it.
 

Attachments

  • Screenshot_20260119-154241.png
    Screenshot_20260119-154241.png
    1.3 MB · Views: 175
  • Screenshot_20260119-154311.png
    Screenshot_20260119-154311.png
    1 MB · Views: 174

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,577
Location
Lancashire
Is that the fancy name for surge arrestors around bridges etc?


Like this quoted from the PACE webpage.
Yes amongst other things

== Doublepost prevention - post automatically merged: ==

Here are a couple of screenshots from the video in post #794 of a back cab ride through Edinburgh Gateway in August.

First shows surge arrestors in place on the south side of the A8 bridge (Also visible on Google Streetview).

Second shows the supports for the overhead wires already installed under the bridge.

To me that suggests that this bridge shouldn't be an issue unless there was a big problem with the design which Network Rail have only just realised, but I doubt it.
Those aren’t surge arrestors
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,009
Location
Surrey
I’ve heard from a source that NR is now realising the A8 road bridge next to Edinburgh Gateway station is too low to fit wires… that’ll be fun to work around.
Its not an arched bridge but im surmising the wire height through the station platforms has to be at a minimum which may be the issue.
 