Low speed derailment at Paignton - 16 January 2026

Status
Not open for further replies.

Sporty60

Member
Joined
5 Aug 2019
Messages
91
A Paddington bound train has derailed approaching Paignton station from Goodrington sidings.
Local trains were terminating at Newton Abbot.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

800301

Member
Joined
29 Dec 2022
Messages
542
Location
Essex

Local trains terminating at Newton Abbot.

5A87 has come off at Goodrington (Paignton) 802105

Pictures below show derailed bogie and that where the sleepers have deteriorated and track has separated apart
 

Attachments

  • 793e6158-2d48-455d-a7ba-ecc55fb04deb.jpeg
    793e6158-2d48-455d-a7ba-ecc55fb04deb.jpeg
    189.8 KB · Views: 1,013
  • 98c9984c-eed8-45de-82bd-71ee809e91c5.jpeg
    98c9984c-eed8-45de-82bd-71ee809e91c5.jpeg
    263.9 KB · Views: 1,005
Last edited:

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,910
Location
London
IMG_3028.jpgIMG_3027.jpg

802105 working 5A87 has derailed coming out of Goodrington Sidings as it approached Paignton Station. The 5th bogie set at the front of the 3rd coach has come off the rails.
16th January 2026
Spotted Paignton
 

Essexman

Established Member
Joined
15 Mar 2011
Messages
1,476
Most of the local trains seem to be running through to Paignton now.
 

VP185

Member
Joined
13 Feb 2010
Messages
418
Most of the local trains seem to be running through to Paignton now.

Disconnected the track circuits occupied by the derailed train.

Only allowed upto 4-car trains into Paignton.
 
Last edited:

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,490
Location
Gomshall, Surrey
I find it odd/baffling how NR's inspection regime misses this sort of track deterioration - it doesn't just happen overnight, but over years.
 

merry

Member
Joined
19 Oct 2011
Messages
177
Location
uk
Oh, i suspect this wasn't "missed", it was likely deliberately "deprioritised" as a cost saving: sidings and shunt routes don't get seem to get much maintenance unless unavoidable. Speeds are low, no passengers involved (except the disruption), only shunt moves & not even freight involved, so where is the priority? Oh yes, disrupting operations. That will be seen as an acceptable risk when budgets are stretched.
 

Olivine

Member
Joined
4 May 2023
Messages
137
Location
thatcham
Oh, i suspect this wasn't "missed", it was likely deliberately "deprioritised" as a cost saving: sidings and shunt routes don't get seem to get much maintenance unless unavoidable. Speeds are low, no passengers involved (except the disruption), only shunt moves & not even freight involved, so where is the priority? Oh yes, disrupting operations. That will be seen as an acceptable risk when budgets are stretched.
And dare I say the outcome sort of justifies that risk management. Yes it’s a derailed 800, oh well. No injuries, it needs to be rerailed, costs will come out of other budgets for that along with the urgent and full fix!
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,541
Location
Yorkshire
Sarcasm alert?
In spoken form, tone of voice and/or body language would give it away; given the forum is text and image based, we ask that the ";)" icon is used to denote any comment that isn't to be taken seriously.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,402
Sarcasm alert?
No? The incident happened literally the day before , why would a report be issued already.
Are you the one being sarcastic? Reports take time, investigations etc! Get real!

== Doublepost prevention - post automatically merged: ==

In spoken form, tone of voice and/or body language would give it away; given the forum is text and image based, we ask that the ";)" icon is used to denote any comment that isn't to be taken seriously.
I am being serious in my reply! Why would a RAIB report (if one was going to be produced) be published less than 24 hours after a derailment.

I think the person replying 'sarcasm' is the one being wrong in there reply!

Investigations take time, certainly more than 24 hours since an incident.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,674
No? The incident happened literally the day before , why would a report be issued already.
Are you the one being sarcastic? Reports take time, investigations etc! Get real!

== Doublepost prevention - post automatically merged: ==


I am being serious in my reply! Why would a RAIB report (if one was going to be produced) be published less than 24 hours after a derailment.

I think the person replying 'sarcasm' is the one being wrong in there reply!

Investigations take time, certainly more than 24 hours since an incident.
People started to blame the track, so someone asked if the RAIB report was already released.

I.e. people taking matter of fact about NR not picking up the track defect when nothing official has been released. The RAIB report comment was sarcastic on that basis.
 

Belperpete

Established Member
Joined
17 Aug 2018
Messages
3,705
Oh, i suspect this wasn't "missed", it was likely deliberately "deprioritised" as a cost saving: sidings and shunt routes don't get seem to get much maintenance unless unavoidable. Speeds are low, no passengers involved (except the disruption), only shunt moves & not even freight involved, so where is the priority? Oh yes, disrupting operations. That will be seen as an acceptable risk when budgets are stretched.
Except that the derailed train could have ended up foul of the adjacent passenger running line. I understand that the ORR take such incidents more seriously than derailments solely within sidings.
 

74A

Member
Joined
27 Aug 2015
Messages
775
Except that the derailed train could have ended up foul of the adjacent passenger running line. I understand that the ORR take such incidents more seriously than derailments solely within sidings.
I don't believe there was any adjacent passenger running lines. Its after the station where longer train shunt to run back. In service passenger trains don't go there
 

4COR

Member
Joined
30 Jan 2019
Messages
892
Location
W Oxon (UWL exile)
I don't believe there was any adjacent passenger running lines. Its after the station where longer train shunt to run back. In service passenger trains don't go there
The Dartmouth Steam Railway does run on the adjacent line if I recall correctly, though there are often no services as this time of year.
 

father_jack

Established Member
Joined
26 Jan 2010
Messages
1,557
Except that the derailed train could have ended up foul of the adjacent passenger running line. I understand that the ORR take such incidents more seriously than derailments solely within sidings.
From a trustworthy source- RAIB have stated their attendance is not necessary.
 

PudseyBearHST

Member
Joined
28 Sep 2015
Messages
1,122
Location
South West
The member obviously meant the RFIB report aka Rail Forum Investigation Bureau ;) Plenty of speculation and a reminder of how everything was better 30 years ago. If this was BR, there would be a loco and a rake of coaches that would be ready on standby for just sort of event :D
 

Belperpete

Established Member
Joined
17 Aug 2018
Messages
3,705
The Dartmouth Steam Railway does run on the adjacent line if I recall correctly, though there are often no services as this time of year.
That there are no services at this time of year is irrelevant, it is purely fortuitous that the derailment happened now. It could well have happened at a time when there was a DSR passenger train passing on the adjacent line.

== Doublepost prevention - post automatically merged: ==

From a trustworthy source- RAIB have stated their attendance is not necessary.
RAIB don't attend all incidents, particularly those where the cause is obvious and requires no investigation.
 

david1212

Established Member
Joined
9 Apr 2020
Messages
1,756
Location
Midlands
Link to a video on Youtube ( not mine )

https://www.youtube.com/live/myFqxt-z-dg

I wondered if the train was actually across Sands Road level crossing. From the video is had stopped before reaching the crossing but this is closed, which is unfortunate timing as roadworks with traffic light control nearby.
Not shown in progress but the train was moved back followed by track repairs being carried.
 
Joined
8 Jul 2014
Messages
400
220007 already back in traffic and working 1V96 BHM-RDG after travelling empty from PGN earlier (5Z20)…
 

Pnerick81

Member
Joined
5 Jan 2024
Messages
63
Location
Bamber bridge
I went on the Paignton - kingwear line 2 years ago now, and it Suprised me at the time that trains terminating at Paignton had to run to the sidings to cross platforms . Just always thought Paignton was a true terminating station . There are a number of siding at goodrington sands and they were all rusty .
 

High Dyke

Established Member
Joined
1 Jan 2013
Messages
5,023
Location
Yellabelly Country
I find it odd/baffling how NR's inspection regime misses this sort of track deterioration - it doesn't just happen overnight, but over years.
This is what happens you cut 'boots on the ground' but employ more managers. Modernising maintenance was not the great thing it promised to be.

As someone mentioned, things like sidings etc are low priority.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,909
Location
East Anglia
I went on the Paignton - kingwear line 2 years ago now, and it Suprised me at the time that trains terminating at Paignton had to run to the sidings to cross platforms . Just always thought Paignton was a true terminating station . There are a number of siding at goodrington sands and they were all rusty .
It was a through station originally. Trains arriving can run across into the up platform and depart straight back. Anything else has to do a shunt move and return.
 