lrbvoyager
Member
- Joined
- 2 Jan 2025
- Messages
- 372
Hello, this is pure speculation and what ifs. If Avanti could implement new routes where would they go to? Maybe Inverness or Aberdeen?
Windermere might be a really good shout! Would have to use 805s mind and there’s restraints with it being single track.Llandudno, Windermere, Stranraer (For Belfast?)
For man airport I presume it would be served by an 807 as I’m not sure a 390 would fit?Assuming you need overhead wires:
Bromsgrove (though possibly not enough power in the lines)
Walsall
Manchester Airport
Bolton (as already mentioned)
Stalybridge via Manchester Victoria (and later Huddersfield)
Are any of these sensible? Probably not, though maybe Walsall at a push if there was a diagram with time in Birmingham.
Anything heading north of Glasgow has to avoid Glasgow itself, so that might limit prospects for growth. Perhaps Perth would be a good terminus for any such service?Hello, this is pure speculation and what ifs. If Avanti could implement new routes where would they go to? Maybe Inverness or Aberdeen?
Would this go via Dumfries, Kilmarnock Ayr? Certainly Ayr is a good shout- mosy of Ayrshire has poor connections to anywhere other than GlasgowStranraer (For Belfast?)
Yes, Pendolino is 217m for a 9-carriage, whereas the platforms at Manchester Airport are only 200m long.Windermere might be a really good shout! Would have to use 805s mind and there’s restraints with it being single track.
== Doublepost prevention - post automatically merged: ==
For man airport I presume it would be served by an 807 as I’m not sure a 390 would fit?
Will be possible from 2028, not sure why you would though.Yes, Pendolino is 217m for a 9-carriage, whereas the platforms at Manchester Airport are only 200m long.
Whether the signalling allows trains to overhang the platform I am not sure. Even then, the front passenger door would not be platformed.
Yes, I do not really know either.Will be possible from 2028, not sure why you would though.
Aberystwyth via Crewe and Shrewsbury (2h 15?) or via Stafford, and Telford to Shrewsbury (2h 25?)the perennial favourite of Shrewsbury.
Stranraer (For Belfast?)
Anything heading north of Glasgow has to avoid Glasgow itself,
Well, they ran a crowd-busting Ayr - Glasgow service that used the stock for the Royal Scot so advertised as a through service. Doubt Ayrshire -the South traffic would have made it viable.Stranraer doesn't serve the ships any more, and most long distance traffic to Belfast has long since been lost to the airlines.
It is possible to run into Glasgow Central and reverse to continue north, but of course with a time penalty. However BR at one time ran an Ayr/Euston service......
They do have enough 805s for that, as it was in the network planned for them when ordered.The obvious Telford/Shrewsbury could presumably be done for little pain and relatively large gain - I think they have bi-modes nowadays, don't they?
They do have enough 805s for that, as it was in the network planned for them when ordered.
But after axing the service (for the second time) recently, what incentive is there to restart it?
I can't see GBR being any keener to run unprofitable services than Avanti.
You'd either need to use 805s (of which there are limited numbers) or electrify the fast lines from King's Norton to Longbridge to serve Bromsgrove. Also platforms at Bromsgrove are likely to be too short for anything longer than an 805 anyway. Huddersfield is more of a possibility as that will be upgraded soon but hard to tell how it will get around Manchester without having to reverse or use the crowded Castlefield Corridor. The solution I can think of is to use the Chat Moss line and serve Victoria then on to HuddersfieldAssuming you need overhead wires:
Bromsgrove (though possibly not enough power in the lines)
Walsall
Manchester Airport
Bolton (as already mentioned)
Stalybridge via Manchester Victoria (and later Huddersfield)
Are any of these sensible? Probably not, though maybe Walsall at a push if there was a diagram with time in Birmingham.
You'd need to order more as there probably isn't the stock availability for it unless a Euston service is replaced with a Brighton one. That might require more trains anywaySouth of London? Unlikely any paths free via Kensington Olympia and Gatwick anymore, but Brighton would be great for restoring direct connections to from the north west. Only good for 805s unless Hitachi have a 3rd rail module for their 800s.
Or reverse at Piccadilly and pretend to be an NPR service.You'd either need to use 805s (of which there are limited numbers) or electrify the fast lines from King's Norton to Longbridge to serve Bromsgrove. Also platforms at Bromsgrove are likely to be too short for anything longer than an 805 anyway. Huddersfield is more of a possibility as that will be upgraded soon but hard to tell how it will get around Manchester without having to reverse or use the crowded Castlefield Corridor. The solution I can think of is to use the Chat Moss line and serve Victoria then on to Huddersfield
Through Shrewsbury services have ceased at least three or four times times (BR, WSMR, Avanti).But after axing the service (for the second time) recently, what incentive is there to restart it?
I firmly believe that any long term success for a direct Shrewsbury to London has to be based on avoiding the West Midlands to achieve major journey time reductions that will grow the market.Could there be a more efficient way of running it under GBR, i.e. have the service double up as the 2nd train in each hour (every other hour, perhaps, so one train in four) from Shrewsbury-Birmingham
Open access doesn't count, as there aren't spare paths into Euston.Through Shrewsbury services have ceased at least three or four times times (BR, WSMR, Avanti).
I firmly believe that any long term success for a direct Shrewsbury to London has to be based on avoiding the West Midlands to achieve major journey time reductions that will grow the market.
See my earlier thoughts about Mid Wales/Aberystwyth. (Post #10)
Congleton would added back to XC more than a London route, and that is doubtful in itself anyway.I just don't think Shrewsbury is a worthwhile market for services beyond a peak up and return.
To me, new routes should be additional calls based on frequency increases - perfect examples being Liverpool South Parkway and Hartford. Congleton could be a future addition, etc. - new markets per se.
Now they have bi-modes, there are more possibilities, but there are only so many electric routes unserved.
Are they still planning on electrifying Stockport to Stalybridge, if so a Euston - midlands - Stockport - Stalybridge - Huddersfield service sounds like fun! Would this be quick than the reverse at Leeds with LNER that never happened? Could even Denton become an East Manchester / M60 parkway!?You'd either need to use 805s (of which there are limited numbers) or electrify the fast lines from King's Norton to Longbridge to serve Bromsgrove. Also platforms at Bromsgrove are likely to be too short for anything longer than an 805 anyway. Huddersfield is more of a possibility as that will be upgraded soon but hard to tell how it will get around Manchester without having to reverse or use the crowded Castlefield Corridor. The solution I can think of is to use the Chat Moss line and serve Victoria then on to Huddersfield
Now there's a thought... Couple it with my Birkenhead suggestion and we can have a Brighton to New Brighton service! If people are worried about the awkward reversal just send it round the Liverpool loop- an 805 will fit, right?South of London? Unlikely any paths free via Kensington Olympia and Gatwick anymore, but Brighton would be great for restoring direct connections to from the north west. Only good for 805s unless Hitachi have a 3rd rail module for their 800s.
Agreed. I’m suggesting Oxley Chord.Nobody is going to reopen Wellington-Stafford.
I would think a second Kings X service would be better.Bringing back the "Clansman" (Euston to Inverness) would certainly be interesting... I doubt it would keep the name though!
That said, if they could swing it - could be interesting, and at 1tpd today (less the Sleeper) - it's hardly a raid. Could build out a bigger non-Central Belt Scottish business, and almost reposition themselves as an indie Scotland-focused operation overall - with that broader reach.Lumo could extend one of their Stirling services per day up to Aberdeen or Inverness as they are using 222s on the route? Inverness most likely as its more direct.