I like the sound of this. Then, if it does go well, a lot more uses for them could be opened up.
Why not just fit batteries to one of the units and use it as a testbed just like the 230 unit on the Greenford branch? If the testing goes well then the TOCs would be more likely to take them on as battery trains.

Because then you have the millions and years of development costs with questionable benifits
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

185

On Moderation
Joined
29 Aug 2010
Messages
5,709
There's a lot of people seemingly focussed on the doors being a little slower to open and close
This is a red herring, given that compared to other units, the door vestibules are a little wider, people get off and on quicker, making station dwell times much shorter.than on other stock, often down to 30 seconds.

Compared to 158s, Voyagers and Pendolinos which 350s work alongside - it's often three times as fast.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,155
Would you say that about the 230 battery trial as well?
Class 230 was/is making use of otherwise redundant vehicles to demonstrate novel approaches to self powered technology. Well, whilst the funding was there.

I'm still not sure what is driving the fascination behind prospective re-engineering of Class 350/2 or Class 450 fleets.
 

james_the_xv

Member
Joined
29 Oct 2019
Messages
362
Location
West Midlands
This is a red herring, given that compared to other units, the door vestibules are a little wider, people get off and on quicker, making station dwell times much shorter.than on other stock, often down to 30 seconds.
Maybe during the off peak with a SC that's on the ball. Even at 6am with 5 passengers getting on I'd bet the average dwell for a 350 is more like 45-50s.

There's a reason 350s pick up so much sub-threshold delay on the Coventry corridor with nothing in front of them, and most of those dwells are planned to a minute.
 

deltic08

On Moderation
Joined
26 Aug 2013
Messages
2,896
Location
North
Class 230 was/is making use of otherwise redundant vehicles to demonstrate novel approaches to self powered technology. Well, whilst the funding was there.

I'm still not sure what is driving the fascination behind prospective re-engineering of Class 350/2 or Class 450 fleets.
Because there appears to be no future for 37 4-car 350/2 units as EMUs except scrap which is purely down to stupid decisions over the last 30 years to procrastinate or pause electrification schemes such as Oxenholme-Windermere, Chippenham-Bristol TM-Bristol Parkway.
BEMUs could be used as soon as thy are converted and tested on Manchester-Windermere/Barrow, Manchester-Buxton, Huddersfield-Leeds-York services before electrification is complete, Leeds-Harrogate-York, Leeds-Wakefield W-Featherstone, Leeds-Skipton-Morecambe and Leeds-Mirfield-Hebden Bridge providing lease charges are reasonable.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,155
BEMUs could be used as soon as thy are converted and tested on Manchester-Windermere/Barrow, Manchester-Buxton, Huddersfield-Leeds-York services before electrification is complete, Leeds-Harrogate-York, Leeds-Wakefield W-Featherstone, Leeds-Skipton-Morecambe and Leeds-Mirfield-Hebden Bridge providing lease charges are reasonable.
And on how many of these routes will the Class 780s be deployed?
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,582
Location
Greater Manchester
And on how many of these routes will the Class 780s be deployed?
Many, Buxton indicated for 781s (battery trains), and several of the others discussed on
The count of carriages of phase 1 for just the 780s is equal to all the Sprinters Northern have at the moment.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,155
And thus we come back to the point of why the 350/2s would be at all necessary at Northern.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,582
Location
Greater Manchester
And thus we come back to the point of why the 350/2s would be at all necessary at Northern.
The only potential use case would be in the short term, and given how long modifications and agreements would take, it's likely they'd only be around for a few years before the new trains start arriving.
 

Charlie978

Member
Joined
31 Jul 2025
Messages
66
Location
Chesterfield
The only potential use case would be in the short term, and given how long modifications and agreements would take, it's likely they'd only be around for a few years before the new trains start arriving.
But then either the new trains to converted 350s could be redeployed to strengthen services / free up 170s to be cascaded to EMR seen as their fleet order has gone quiet. I’m sure there would be a home for them if successfully converted.
 

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,935
Location
Wales (sometimes in England), thanks for replying!
Maybe during the off peak with a SC that's on the ball. Even at 6am with 5 passengers getting on I'd bet the average dwell for a 350 is more like 45-50s.

There's a reason 350s pick up so much sub-threshold delay on the Coventry corridor with nothing in front of them, and most of those dwells are planned to a minute.
What's an SC?
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,708
Location
West of Andover
And thus we come back to the point of why the 350/2s would be at all necessary at Northern.
To replace the 323s when the replacement new stock order gets cut back to be focused on the older diesels, assuming Labour doesn't even decide those old 150s can last another 10 years and cancel that order as well.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,347
Location
Yorkshire
Don't argue for the sake of arguing. In my mind it does exist just by changing at stations Adwick to Doncaster but will be a through service if BEMUs are introduced. In your mind it is not. We just disagree.
Frequency is not a problem. Only you see it as one. Leeds-Doncaster is hourly and will Leeds-Doncaster-Sheffield would be hourly with Adwick-Sheffield being half hourly in between Leeds-Doncaster-Sheffield services but still operated by BEMUs.
I totally agree both Moorthorpe-Sheffield and Doncaster-Swinton should be wired. With the original plan to wire from St. Pancras to Sheffield via Derby, now paused again, Cross Country would have been capable of operating BEMUs from Aberdeen to Birmingham with 220/221s operating Sheffield-Penzance with overlap being the busiest part.
I'm not "arguing for the sake of arguing". It's either a through service or it isn't, and if you have to change trains then it isn't. Words have meanings and if we can't agree on definitions then any discussion is pointless.
As for saying that frequency is unimportant, let's just run everything in the country hourly then- much easier to implement this forum's favourite concept- the "Takt" that way... [/S]

I appreciate that we're in the speculative discussion section, but some of the mental gymnastics being performed to find a home for these units is remarkable. Your idea for linking those two services could have legs with battery EMUs but those battery EMUs won't be modified 350/2s. There are a number of downsides to your suggestion besides that, such as putting additional pressure on the through platforms at Doncaster rather than using the bays as the current Leeds EMU does- that would likely have knock-on effects on the ECML.
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,601
Location
Dunham/Bowdon
The continuing overcrowding on XC suggests to me that the best use for the redundant 350/2s would be to replace the Voyagers on the fully electrified sections of the XC network. This would release Voyagers to lengthen trains on non-electrified parts of this network.

I am thinking particularly of these 2 areas of operation:
  • Manchester to Birmingham/Coventry, to be transferred to LNWR, who already operate class 350 trains
  • Doncaster/York to Edinburgh - Northern would probably be the best operator, and local services from Newcastle to Morpeth/Chatham could be included
 
Last edited:

Bill57p9

Member
Joined
1 Dec 2019
Messages
861
Location
Ayrshire
The continuing overcrowding on XC suggests to me that the best use for the redundant 350/2s would be to replace the Voyagers on the fully electrified sections of the XC network. This would release Voyagers to lengthen trains on non-electrified parts of this network.

I am thinking particularly of these 2 areas of operation:
  • Manchester to Birmingham/Coventry, to be transferred to LNWR, who already operate class 350 trains
  • Doncaster/York to Edinburgh - Northern would probably be the best operator, and local services from Newcastle to Morpeth/Chatham could be included
Interesting idea and a lot of common sense, though I do believe 125mph is a requirement for the ECML paths.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
Because there appears to be no future for 37 4-car 350/2 units as EMUs except scrap which is purely down to stupid decisions over the last 30 years to procrastinate or pause electrification schemes such as Oxenholme-Windermere, Chippenham-Bristol TM-Bristol Parkway.
BEMUs could be used as soon as thy are converted and tested on Manchester-Windermere/Barrow, Manchester-Buxton, Huddersfield-Leeds-York services before electrification is complete, Leeds-Harrogate-York, Leeds-Wakefield W-Featherstone, Leeds-Skipton-Morecambe and Leeds-Mirfield-Hebden Bridge providing lease charges are reasonable.

There was me thinking this situation was down to the ROSCO charging high leasing costs, making a brand new fleet of substantially better trains, a more attractive option.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,013
Location
West Wiltshire
Of course if there is no room to fit batteries, then the alternative is some sort of battery car added to the formation.

OK, I realise this might sound a bit like South London line electrification milk van power cars (which having driving positions were virtually mini electric locos).

But if you think about it could do lot worse than building and adding a part seated, part above floor power source, extra vehicle (much like old DEMUs did), even if only have a 25 year life. The economics must look favourable against writing off 130 vehicles third of way through lifespan. Those 350 are probably only depreciated 40% of cost price and if go for scrap the owner has to take an accounting write off in one go of around 60% of their cost.

Flirts operate with a diesel electric power car (although that is short wider articulated vehicle), so idea of an extra intermediate vehicle for power is not totally far fetched.
 

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,656
Location
Selby
Don't argue for the sake of arguing. In my mind it does exist just by changing at stations Adwick to Doncaster but will be a through service if BEMUs are introduced. In your mind it is not. We just disagree.
Frequency is not a problem. Only you see it as one. Leeds-Doncaster is hourly and will Leeds-Doncaster-Sheffield would be hourly with Adwick-Sheffield being half hourly in between Leeds-Doncaster-Sheffield services but still operated by BEMUs.
You seem to be confused.

At the moment, we have two separate services, each running hourly, which combine to give 2tph between Adwick and Doncaster:
Leeds to Doncaster, calling at Adwick, using EMUs
Adwick to Sheffield, calling at Doncaster, using DMUs.

First, you said that we could combine them to make a single service running from Leeds to Sheffield via Doncaster.
Now you seem to be saying that we should extend the Leeds to Doncaster service through to Sheffield as well as continuing to run the Adwick to Sheffield service, meaning that we're adding an extra hourly service between Doncaster and Sheffield, along a line that already has 4tph and several bottlenecks, not combining two existing services.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
Of course if there is no room to fit batteries, then the alternative is some sort of battery car added to the formation.

OK, I realise this might sound a bit like South London line electrification milk van power cars (which having driving positions were virtually mini electric locos).

But if you think about it could do lot worse than building and adding a part seated, part above floor power source, extra vehicle (much like old DEMUs did), even if only have a 25 year life. The economics must look favourable against writing off 130 vehicles third of way through lifespan. Those 350 are probably only depreciated 40% of cost price and if go for scrap the owner has to take an accounting write off in one go of around 60% of their cost.

Flirts operate with a diesel electric power car (although that is short wider articulated vehicle), so idea of an extra intermediate vehicle for power is not totally far fetched.

A small power pod as in the Flirts wouldn't be a bad idea.

But realistically, it'll never happen.
 

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,656
Location
Selby
The continuing overcrowding on XC suggests to me that the best use for the redundant 350/2s would be to replace the Voyagers on the fully electrified sections of the XC network. This would release Voyagers to lengthen trains on non-electrified parts of this network.

I am thinking particularly of these 2 areas of operation:
  • Manchester to Birmingham/Coventry, to be transferred to LNWR, who already operate class 350 trains
  • Doncaster/York to Edinburgh - Northern would probably be the best operator, and local services from Newcastle to Morpeth/Chatham could be included
A couple of issues with that plan:
  • The 350/2s are currently configured for suburban use with 3+2 seating, which would be unsuitable for long-distance services to replace XCountry. While they could be refurbished with 2+2 seating, this has a cost associated with it.
  • Voyagers don't run either on electrified or non-electrified lines – most journeys use both. If you are proposing cutting through journeys so that Manchester no longer gets any XCountry services but just trains to Birmingham, and Edinburgh and Newcastle no longer get any XCountry services but just trains to York/Doncaster, then you're going to annoy a lot of passengers who now find that they have to change trains (and if they have to change trains at New Street, that is easily enough to put them off using the train completely).
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,708
Location
West of Andover
Now you seem to be saying that we should extend the Leeds to Doncaster service through to Sheffield as well as continuing to run the Adwick to Sheffield service, meaning that we're adding an extra hourly service between Doncaster and Sheffield, along a line that already has 4tph and several bottlenecks, not combining two existing services.
4tph, of which only one of those trains is the stopper. Compared to Pre Covid when the stoppers were 2tph (1tph to Adwick the other 1tph terminating in P5 at Doncaster). The line coped before Covid with having 5tph between Swinton & Doncaster.

Although extending the Leeds - Doncaster stopper to Sheffield, using the all magical battery powered train is a bonkers idea.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,285
Location
The Fens
The continuing overcrowding on XC suggests to me that the best use for the redundant 350/2s would be to replace the Voyagers on the fully electrified sections of the XC network. This would release Voyagers to lengthen trains on non-electrified parts of this network.

I am thinking particularly of these 2 areas of operation:
  • Manchester to Birmingham/Coventry, to be transferred to LNWR, who already operate class 350 trains
  • Doncaster/York to Edinburgh - Northern would probably be the best operator, and local services from Newcastle to Morpeth/Chatham could be included
I fully agree on Manchester-Birmingham but I'm much less convinced on ECML.

Manchester-Birmingham's prime function is as an interurban route between England's 2 biggest cities outside London, and to serve some important places in between: Stockport, Macclesfield, Stoke, Stafford and Wolverhampton.

The 2024/25 origin destination matrix has these one way numbers:

Manchester-Birmingham 236k
Manchester-Stafford 103k
Stafford-Wolverhampton 94k
Stoke-Stafford 87k
Manchester-Wolverhampton 85k

The trains also make a substantial contribution to Manchester-Stoke and Macclesfield, which are 355k and 335k. Manchester-Stockport and Birmingham-Wolverhampton are even bigger.

Compared to these numbers the long distance cross country traffic is secondary, for example Manchester-Bristol is 46k and Manchester-Oxford is 29k.

A couple of issues with that plan:
  • The 350/2s are currently configured for suburban use with 3+2 seating, which would be unsuitable for long-distance services to replace XCountry. While they could be refurbished with 2+2 seating, this has a cost associated with it.
And a suburban railway is how Manchester-Birmingham needs to be operated, because that is its primary function. The class 350/2s are well suited to the task, whereas the Voyagers are not.

If you are proposing cutting through journeys so that Manchester no longer gets any XCountry services but just trains to Birmingham, and Edinburgh and Newcastle no longer get any XCountry services but just trains to York/Doncaster, then you're going to annoy a lot of passengers who now find that they have to change trains
The much larger numbers of people travelling between Manchester and Birmingham, and stations in between, will be pleased.

And of course Liverpool-Birmingham has been served this way for many years now.

I'm much less convinced that class 350/2s are suited to the north end of the ECML because it isn't an interurban/suburban railway, apart from the big Durham-Newcastle flow.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
A couple of issues with that plan:
  • The 350/2s are currently configured for suburban use with 3+2 seating, which would be unsuitable for long-distance services to replace XCountry. While they could be refurbished with 2+2 seating, this has a cost associated with it.

The 350/2s need will need a full refurbishment where ever they end up and XC are currently replacing all seating on their Voyagers and 170s, so this point wouldn't really be relevant here.

  • Voyagers don't run either on electrified or non-electrified lines – most journeys use both. If you are proposing cutting through journeys so that Manchester no longer gets any XCountry services but just trains to Birmingham, and Edinburgh and Newcastle no longer get any XCountry services but just trains to York/Doncaster, then you're going to annoy a lot of passengers who now find that they have to change trains (and if they have to change trains at New Street, that is easily enough to put them off using the train completely).

Not convinced cutting journeys in half at New Street is a massive issue, the trains tend to empty out and refill at New Street so the number of through passengers isn't going to be big in comparison, but also, if splitting the service at New Street results in higher capacity and more chance of a seat, then it's better for those making through journeys anyway.

The benefits far outweigh the negatives.
 

Olivine

Member
Joined
4 May 2023
Messages
132
Location
thatcham
The continuing overcrowding on XC suggests to me that the best use for the redundant 350/2s would be to replace the Voyagers on the fully electrified sections of the XC network. This would release Voyagers to lengthen trains on non-electrified parts of this network.

I am thinking particularly of these 2 areas of operation:
  • Manchester to Birmingham/Coventry, to be transferred to LNWR, who already operate class 350 trains
  • Doncaster/York to Edinburgh - Northern would probably be the best operator, and local services from Newcastle to Morpeth/Chatham could be included
Not really ‘CrossCountry’ then is it - you’d be better to junk the whole XC service instead if that’s the idea.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
Not really ‘CrossCountry’ then is it - you’d be better to junk the whole XC service instead if that’s the idea.

It would be the same as Birmingham to Nottingham or Birmingham to Leicester which as been branded as CrossCountry for almost 20 years, I'm not sure I understand what issue you're trying to raise?
 

td97

Established Member
Joined
26 Jul 2017
Messages
1,556
I fully agree on Manchester-Birmingham
This comes up quite frequently, and the stated difficulty is splitting the Manchester - Bournemouth route and pathing 2 terminating services at Birmingham New St (or elsewhere - Coventry or Birmingham International).
But the newly added Camp Hill and Birmingham - Manchester Airport services (and Shrewsbury stopper in 2024) don't really reinforce the position that BHM is fully at capacity.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,725
Location
Worcester
The continuing overcrowding on XC suggests to me that the best use for the redundant 350/2s would be to replace the Voyagers on the fully electrified sections of the XC network. This would release Voyagers to lengthen trains on non-electrified parts of this network.

I am thinking particularly of these 2 areas of operation:
  • Manchester to Birmingham/Coventry, to be transferred to LNWR, who already operate class 350 trains
  • Doncaster/York to Edinburgh - Northern would probably be the best operator, and local services from Newcastle to Morpeth/Chatham could be included
How do you fit the resulting Birmingham - Bournemouth trains into New Street with their paths taken up by this service?
 
Status
Not open for further replies.

Top