December 2025 Timetable Change - Confirmed changes only

Status
Not open for further replies.

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,143
Location
Bolton
14 months befire the timetable started isn’t really “late in the day”
The request for additional "soft launch" measures which saw this service being taken out on some weekdays prior to the start of Church Fenton works was made about four months before the start of the timetable.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,581
The request for additional "soft launch" measures which saw this service being taken out on some weekdays prior to the start of Church Fenton works was made about four months before the start of the timetable.

I can say with certainty it was made in 2024.
 

99009

Member
Joined
4 Apr 2025
Messages
302
Location
Chesterfield
1R50 05:21 Nottingham - Liverpool Lime St via Beighton Jn + 1L08 08:51 Liverpool Lime St - Nottingham now seem to be booked for a pair of 170's instead of a pair of 158's. It's possible that there are other workings too that EMR have changed from 158 to 170 or vice versa, but I haven't seen it stated anywhere if there are. Before this timetable change, only EMR 158's were booked via Beighton Jn with 170's only occasionally appearing, so the booked variety Chesterfield - Sheffield via Beighton Jn has now increased.
 

SteveHFC

Member
Joined
1 Nov 2014
Messages
262
A couple of changes I've noticed on the Midland Mainline.

9R85 (0633 Bedford to Three Bridges TL) has turned up with 12 cars instead of 8 in the past few days. Not sure if this is one of the changes or a temporary thing but it was most needed for this particular service.

9R44 (1636 St Pancras to Bedford TL) now cuts out West Hampstead Thameslink but now calls at Platform 4 St Albans instead of Platform 2. I assume the time saved by not calling at West Hampstead allows the usage of P4 at St Albans without impacting the EMR Connect (1Y45).

1Y47 (1717 St Pancras to Corby EMR) now calls at Luton at 1742 instead of 1744.
There are quite a few very minor timetable changes - by no more than a minute or two between Bedford and West Hampstead on Thameslink. My morning train now departs a minute later at Leagrave, and my evening train arrives a minute later.
 

GoneSouth

Established Member
Joined
17 Dec 2018
Messages
1,471
It's been delayed to start at the beginning of next year. The usual spurious excuses given - reality is probably that they don't have enough crew to run it at the moment.
That would have been very useful on Monday when the 1715 to Plymouth was a little (70 ish mins!) late.

I believe staff were refusing to allow any more people to board the 1709 to Nottingham it was so packed.

== Doublepost prevention - post automatically merged: ==

XC promised a more reliable service on the Birmingham to Cardiff service from the start of the December timetable.

Well they delivered on the reliable bit in that you can now rely on there being no trains on that route on Sundays!

Halved the frequency and managed to run only the 1730 from Birmingham to Cardiff all day, yup that’s one train on what used to be an hourly service.

XC delivering nothing to their customers once again!

Come to think of it, they didn’t have a great day on the rest of their routes with the cancellation of the first train north from Bristol and a couple of Manchesters cancelled later along with early terminations at Birmingham on a couple of others. At this rate they may as well remove all their services from the timetable on Sundays from December 2026
 
Last edited:

IrishDave

Member
Joined
30 Jun 2009
Messages
471
Location
Brighton
9R85 (0633 Bedford to Three Bridges TL) has turned up with 12 cars instead of 8 in the past few days. Not sure if this is one of the changes or a temporary thing but it was most needed for this particular service.
The new timetable allows for Wixams station to be slotted in without further timetable changes. The additional stop would have led to too short a turnround time at Bedford, so (almost) all turnrounds at Bedford have "stepped down" a train. This has the effect that, in general, a 9R forms a 9R and a 9T forms a 9T, instead of the previous situation where they interworked at Bedford.

As a result, I expect that all of the 8-car diagrams on the Brighton and Midland Main Lines will have changed completely. (They are needed in order to cycle the 8-car units back to Three Bridges without incurring additional mileage or crew resource - I believe there are about five such diagrams.)
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,143
Location
Bolton
I can say with certainty it was made in 2024.
Then it seems to me you're thinking of something else. Network Rail would hardly have offered the LTP with those trains in if there had been an agreement on phased launch in 2024 would they? They have been STP cancelled instead, as a result of late notice changes.
 

Freemo

Member
Joined
19 Dec 2019
Messages
94
Location
Sheffield
That would have been very useful on Monday when the 1715 to Plymouth was a little (70 ish mins!) late.

I believe staff were refusing to allow any more people to board the 1709 to Nottingham it was so packed.
Had a similar situation when I arrived on a packed platform for the 1709 after the 1611 XC was so badly delayed it was supposed to skip Leeds and divert via Dearne Valley with the 1711 delayed around an hour too, only to hear an unexpected platform announcement for the XC arriving.

They apparently changed their mind and ran it in the path of the 1711 instead, and it left practically empty in the rear unit!
 

Nammer

Member
Joined
1 May 2016
Messages
177
GWR services 0928/1030/1130 Cardiff to Portsmouth Hbr and 1123/1223/1323 Portsmouth Hbr to Cardiff no longer call at Cosham on Mondays to Fridays. These services have always called for as long as I can remember!
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,725
Location
Worcester
GWR services 0928/1030/1130 Cardiff to Portsmouth Hbr and 1123/1223/1323 Portsmouth Hbr to Cardiff no longer call at Cosham on Mondays to Fridays. These services have always called for as long as I can remember!
I used to go home from Cardiff Uni to Farnham via Fratton (got a lift from Fratton) a lot of the time as it was less hassle than via Reading, and the Cardiff Portsmouths always skipped Cosham in the late evenings. First time I’ve heard of it in the morning and afternoon though. Mind you, I don’t think there’s a huge need to stop there really.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,581
Then it seems to me you're thinking of something else. Network Rail would hardly have offered the LTP with those trains in if there had been an agreement on phased launch in 2024 would they? They have been STP cancelled instead, as a result of late notice changes.

Absolutely Network Rail would (and did) include the phased launch trains in the LTP, as - clearly - they are expected to be coming back at some point during the timetable.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,143
Location
Bolton
Absolutely Network Rail would (and did) include the phased launch trains in the LTP, as - clearly - they are expected to be coming back at some point during the timetable.
And they would have been bid and offered without period A in them if the ESG had agreed a phase in 14 months in advance. They didn't so they weren't.
 

43055

Established Member
Joined
8 Mar 2018
Messages
3,678
1R50 05:21 Nottingham - Liverpool Lime St via Beighton Jn + 1L08 08:51 Liverpool Lime St - Nottingham now seem to be booked for a pair of 170's instead of a pair of 158's. It's possible that there are other workings too that EMR have changed from 158 to 170 or vice versa, but I haven't seen it stated anywhere if there are. Before this timetable change, only EMR 158's were booked via Beighton Jn with 170's only occasionally appearing, so the booked variety Chesterfield - Sheffield via Beighton Jn has now increased.
Seems to now be about a 50/50 split between 170 and 158 now with the former as 5/6 car west of Nottingham and mostly 3 east.

Hopefully just for the winter but Skegness has gone from 3 car to 2 car 170's.
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,884
Seems to now be about a 50/50 split between 170 and 158 now with the former as 5/6 car west of Nottingham and mostly 3 east.

Hopefully just for the winter but Skegness has gone from 3 car to 2 car 170's.
Skegness is 2 car 158s with the odd exception with the plan to be 4 car 158s in summer as appropriate.

Liverpool Norwich is indeed a 50/50 split more or less.
 
Joined
2 Feb 2019
Messages
1,039
GWR services 0928/1030/1130 Cardiff to Portsmouth Hbr and 1123/1223/1323 Portsmouth Hbr to Cardiff no longer call at Cosham on Mondays to Fridays. These services have always called for as long as I can remember!
I have written to GWR stating that I am not happy with this change and I want all GWR trains on the Portsmouth Harbour to/from Cardiff Central before 20:00 each day to continue to call at Cosham. They reply that my request to reinstate those stops will be fully considered.

As well as being inconvenient for people in North Portsmouth, not just for local journeys but also for longer journeys to/from Bristol and Cardiff, removing these three stops each way Monday to Friday may cause confusion as every other train on this service before 20:00 each day calls at Cosham. Everyone knows the trains on this service do not call at Cosham after 20:00 which has long been the case and is late evening anyway so continuing with that practice is not a problem.

I do not know why GWR decided to remove these stops. They are in the middle of the day Monday to Friday which is not the busiest time for people travelling and any issues with there not being enough seats should be resolved when the GWR Class 175 rollout is complete as the Portsmouth-Cardiff trains will all be 4-car Class 158 or better.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,143
Location
Bolton
And you know this for certain?
Yes. Ask yourself why for example only the Leeds - Sheffield, GTR stops at Cambridge South plus some other minor tweaks, and one and a bit LNER diagrams are what's been taken out? The answer is because it was too late to do anything more invasive. The Leeds - Sheffield diagrams are an easy target as they don't do much else. It's a largely arbitrary choice to hold them back.

I suspect what happened was that Bald Rick or someone in Network Rail lobbied for "soft launch" (which is a misleading name for it) measures in 2024 and nobody else at the table agreed. The idea was then filed, only to be resurrected recently.
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,570
Location
UK
It's been referred to as a 'firebreak' move, in an interview with Paul Rutter (Network Rail EC Route Director) that was published on the latest Green Signals podcast, timestamped below:
So we have we have planned dates where we're going to go from and say okay, we're ready to start now. So it was just to give a a firebreak as the best way to describe it at the start and we have every intention of uh putting them trains back in as as the timetable evolves.

It still makes absolutely no sense. How is introducing it later going to help with reliability? Either it works or it doesn't. Is the idea to withdraw these services if performance is impacted too heavily?

If so the industry should be honest with the public about what's going on rather than giving smokescreen excuses. I'm sure there would be a backlash 'up north' as their local services pay the price for the new timetable, so perhaps that explains why that approach wasn't taken...
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,143
Location
Bolton
Either it works or it doesn't. Is the idea to withdraw these services if performance is impacted too heavily?
I think reading between the lines that some people at Network Rail would quite like that to be the way it turns out, absolutely.

However, the rights holders, unsurprisingly, clearly do not see it that way. Either the rights are available for use or they aren't, and if they aren't, then one follows due process for them to be amended.

== Doublepost prevention - post automatically merged: ==

I have written to GWR stating that I am not happy with this change and I want all GWR trains on the Portsmouth Harbour to/from Cardiff Central before 20:00 each day to continue to call at Cosham. They reply that my request to reinstate those stops will be fully considered.

As well as being inconvenient for people in North Portsmouth, not just for local journeys but also for longer journeys to/from Bristol and Cardiff, removing these three stops each way Monday to Friday may cause confusion as every other train on this service before 20:00 each day calls at Cosham. Everyone knows the trains on this service do not call at Cosham after 20:00 which has long been the case and is late evening anyway so continuing with that practice is not a problem.

I do not know why GWR decided to remove these stops. They are in the middle of the day Monday to Friday which is not the busiest time for people travelling and any issues with there not being enough seats should be resolved when the GWR Class 175 rollout is complete as the Portsmouth-Cardiff trains will all be 4-car Class 158 or better.
The hours make it sound like they've done that for performance reasons. They've removed stops to make it ever so slightly more likely that those services will start right time at Portsmouth Harbour / arrive right time at Fareham.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,731
Location
Newport
It still makes absolutely no sense. How is introducing it later going to help with reliability? Either it works or it doesn't.
As someone with a lifetime experience in ops, it makes absolute sense to me if major changes are involved.

New timetables rarely work well immediately no matter how well briefed. There will always be trains with an unexpected and disproportionate impact on the plan, needing new strategies for their management.

Having some temporary firebreaks is a good way to help everyone get to grips with the new service, then learn a bit more as the white space is eventually filled.
 

driverd

Member
Joined
29 Mar 2021
Messages
904
Location
UK
As someone with a lifetime experience in ops, it makes absolute sense to me if major changes are involved.

New timetables rarely work well immediately no matter how well briefed. There will always be trains with an unexpected and disproportionate impact on the plan, needing new strategies for their management.

Having some temporary firebreaks is a good way to help everyone get to grips with the new service, then learn a bit more as the white space is eventually filled.

The problem is that if your "firebreak" is a single express train per hour, which interacts with about 14 miles of route on a branch from the mainline, it absolutely raises questions around just how much of a "firebreak" this is. For instance, I think the now circa 60 min turnaround at Leeds, or the circa 80 min turnaround at BDQ, acts as a far more meaningful opportunity to recover time on the express runs to London. Certainly more meaningful than a few minutes gained by leaving a gap on the graph for a very small number of route miles.

I think its totally a fair to be very sceptical about the motivations here - if it truly is a firebreak, its not a very substantial or meaningful one, and certainly, if I was the operator and truly in a position to deliver this service, I'd be questioning why I'm losing revenue to act as another operators recovery time.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,143
Location
Bolton
As someone with a lifetime experience in ops, it makes absolute sense to me if major changes are involved.

New timetables rarely work well immediately no matter how well briefed. There will always be trains with an unexpected and disproportionate impact on the plan, needing new strategies for their management.

Having some temporary firebreaks is a good way to help everyone get to grips with the new service, then learn a bit more as the white space is eventually filled.
Agreed, a few schedules being left out on all routes in a controlled phase-in as a pre-planned exercise would actually have been achievable and brought some of the benefits you describe here. This could have been managed as part of the LTP offer. Alternatively some discrete buckets of schedules with simplified diagrams could have been created in the initial drafting so that the STP cancellation exercise were simple to achieve.

However, withdrawing one service group when you didn't do the above and realise too late, so it's the only suitable target left, especially one which is in fact essential to a piece of TRU work, and around which the TRU Church Fenton work was long planned, isn't the way to achieve that.
 

Freemo

Member
Joined
19 Dec 2019
Messages
94
Location
Sheffield
It's been referred to as a 'firebreak' move, in an interview with Paul Rutter (Network Rail EC Route Director) that was published on the latest Green Signals podcast, timestamped below:

Nitpicking but I assume when he said the Northern service is starting in January he actually meant from 27th December as is the currently advertised plan.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,143
Location
Bolton
Nitpicking but I assume when he said the Northern service is starting in January he actually meant from 27th December as is the currently advertised plan.
Correct. Thankfully Northern won the argument to have it start no later than that, otherwise there would be a startling reduction in capacity for Leeds - Sheffield for about four weeks. They may also run tomorrow and Sunday.
 

Peterthegreat

Established Member
Joined
22 Feb 2021
Messages
1,784
Location
South Yorkshire
Correct. Thankfully Northern won the argument to have it start no later than that, otherwise there would be a startling reduction in capacity for Leeds - Sheffield for about four weeks. They may also run tomorrow and Sunday.
Nor will they run the first week of February. In fact there will be NO trains from Leeds to Sheffield as the line is blocked at the north end of Sheffield due to engineering work.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,708
Location
West of Andover
Skegness is 2 car 158s with the odd exception with the plan to be 4 car 158s in summer as appropriate.

Liverpool Norwich is indeed a 50/50 split more or less.
4 coach 158s on Skegness line, trains which have rubbish luggage space being used on services where passengers will likely be carrying luggage (including the kitchen sink).

(And I bet some guards are not looking forward to working potentially overcrowded Skeggy services when formed of a 158 if they have got used to a 170 with the cab doors)
 

Freemo

Member
Joined
19 Dec 2019
Messages
94
Location
Sheffield
Nor will they run the first week of February. In fact there will be NO trains from Leeds to Sheffield as the line is blocked at the north end of Sheffield due to engineering work.
Since I have discretion over when I go in the office this basically means I'll be absent entirely for four out of the first five weeks of the year, plus today when XC couldn't find a driver to start before Leeds. I feel for the people who either don't know or don't have any choice other than to go in whilst capacity is down more than a third in the peaks, assuming Northern run perfectly.

Edit: actually I think the new services don't run into Leeds platform 17 so might at least be 3 or more cars? But that'll require units being found so I'm not hopeful
 
Last edited:

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,884
4 coach 158s on Skegness line, trains which have rubbish luggage space being used on services where passengers will likely be carrying luggage (including the kitchen sink).

(And I bet some guards are not looking forward to working potentially overcrowded Skeggy services when formed of a 158 if they have got used to a 170 with the cab doors)
It'll be character building :lol:

Newbies haven't lived until they've tried working a 153 on it's own on the 0955 in summer!
 

1D53

Established Member
Joined
2 Apr 2006
Messages
2,884
Yes. Ask yourself why for example only the Leeds - Sheffield, GTR stops at Cambridge South plus some other minor tweaks, and one and a bit LNER diagrams are what's been taken out? The answer is because it was too late to do anything more invasive. The Leeds - Sheffield diagrams are an easy target as they don't do much else. It's a largely arbitrary choice to hold them back.
This is correct.
 
Joined
2 Feb 2019
Messages
1,039
Yes. Ask yourself why for example only the Leeds - Sheffield, GTR stops at Cambridge South plus some other minor tweaks, and one and a bit LNER diagrams are what's been taken out? The answer is because it was too late to do anything more invasive. The Leeds - Sheffield diagrams are an easy target as they don't do much else. It's a largely arbitrary choice to hold them back.
Nothing will be stopping at Cambridge South in the December 2025 timetable period as the opening date for this new station has been delayed to June 2026.
 