InTheEastMids
Established Member
- Joined
- 31 Jan 2016
- Messages
- 1,404
The challenge is detecting the signal (if it's there) within the noise of all the other stuff going on e.g. deindustrialisation . For what it's worth, in GDP/head terms, Nottingham has seemed to outperform Derby since NET opened in 2004, so hooray for trams! Oh, but Nottingham has not obviously outperformed Coventry or Leicester over the same period so err...If metros etc were really transformative in the UK context, surely we would have seen Newcastle outperform after the system opened in the eighties, or, subsequently, Nottingham, or Sheffield……(Manchester may provide a more positive story.)
I agree with you, your XC example is a particularly egregious example given that XC serve pretty much exclusively larger stations which have long platforms.On the other hand I don't see much wrong with this approach, and see more capacity gain still to be captured, particularly via longer trains.
A counterfactual XC example is Birmingham-Leicester/Stansted services. We have run out of easy growth because more trains can't be squeezed through New Street, Wigston and Ely etc. And we can't run longer trains without a huge, costly programme to extend what are mainly 100m platforms at intermediate stations (effectively including New Street as I think the timetable has another short train at the other end of New Street Platform 10).
So progress has stalled, and we await Treasury for the money for Midlands Rail Hub East, the transformational scheme, aware that Governments repeatedly commit to, then defer/kill off these schemes (e.g. MMLE, Piccadilly P15/16, Ely Junction, and so on).
And I think what I'm saying is that we can't use a lot of this capacity to the full because they rely on, or are impacted by ripples from the big pinch points elsewhere on the network - Thameslink Core, Proof House Junction, Ely, Manchester Piccadilly P13/14 - and/or require hugely expensive route-wide platform extensions.Indeed, outside of London and the SE there are few areas where existing infrastructure capacity is being consistently used to the full
I agree and it feels like there's been a lot of dithering over replacing older diesel fleets. Austerity, pandemics, and failed decarbonisation strategy.I am aware that the existing rolling stock capacity is being fully used (indeed "over" used) to a much greater extent - which is part of the problem.
