This certainly needs doing. There should be a requirement that any train operating on the ECML, WCML, GWML etc should be able to maintain linespeed or its own locomotive/stock's maximum speed (whichever is lower, obviously) throughout its journey aside from where signalling or other safety matters would not permit that. The waste of paths on the north WCML that exists just because freight operators can't be bothered to haul their trains with sufficient power because it might cost them money is nothing short of a disgrace. It is, in effect, subsidising private pockets at the expense of the passenger service.
I agree with this. The number of times I go past a freight TOC’s depot and it’s full of trains doing nothing, yet passenger TOCs are forced to ration rolling stock to the bare minimum. If freight TOCs are going to have a surplus of locomotives, at least use them to accelerate freight services to avoid taking up multiple passenger train paths!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

35B

Established Member
Joined
19 Dec 2011
Messages
5,548
I agree with this. The number of times I go past a freight TOC’s depot and it’s full of trains doing nothing, yet passenger TOCs are forced to ration rolling stock to the bare minimum. If freight TOCs are going to have a surplus of locomotives, at least use them to accelerate freight services to avoid taking up multiple passenger train paths!
Might that be a matter of when "peak" running is? I could draw the same conclusion going past a depot off peak, or at the weekend, for a passenger operator.

That's without wondering what good bunging another 66 on the front of a freight over Shap would actually do for the journey times - or the economics of the working in the first place.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,341
Location
Nottingham
When I looked at what traction was being used over Shap, I was surprised by how much freight already uses electric traction (88, 2x90 etc.) Most 66 hauled trains seem to pass late evening or overnight.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,937
Location
Mold, Clwyd
An extra Euston-Scotland means 4tph north of Preston.
How will this work with the current flighting policy?
Currently the fast Glasgow goes first from Preston, then the Birmingham and lastly the TPE, with slightly different stopping patterns.
The Birmingham and TPE go alternately to Glasgow and Edinburgh, giving 2tph to Glasgow and 1tph to Edinburgh.
It would appear Edinburgh needs a bigger capacity increase than Glasgow.
You surely wouldn't want 3tph to Glasgow, all leaving within 20 minutes of each other (leaving the rest for freight and some local Northern services).
Network Rail has previously said it can't manage more than the present 3tph.
There's ETCS coming, of course.
 
Last edited:

amahy

Member
Joined
9 Dec 2024
Messages
502
Location
West Dunbartonshire
Might that be a matter of when "peak" running is? I could draw the same conclusion going past a depot off peak, or at the weekend, for a passenger operator.

That's without wondering what good bunging another 66 on the front of a freight over Shap would actually do for the journey times - or the economics of the working in the first place.
Until fairly recently, I passed Newton Heath TMD pretty much every day at varying times (and had done for several years) - the depot was always empty, off peak or peak times, yet services were still short formed. Compare that with DRS Crewe, there has never been an occasion I've passed there and seen less than 10 class 68s doing nothing lined up next the mainline!

Freight TOCs shouldn't be running diesel locomotives over Shap, as the line is fully electrified. The only train that needs to be diesel hauled is the Hardendale Quarry run.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,379
An extra Euston-Scotland means 4tph north of Preston.
5tph in the hours where there is a service from Liverpool to Glasgow, although I guess that would have to give way. That would be getting to the levels of duplication once seen between York and Newcastle.
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,182
Location
Liverpool
Freight TOCs shouldn't be running diesel locomotives over Shap, as the line is fully electrified. The only train that needs to be diesel hauled is the Hardendale Quarry run.
Do freight/diesel locos also not have lower speed limits on Shap Summit compared to electric and multiple units? Or have I mixed that up with something else? If it is the case though than that kind of difference in speed limit uses up capacity on the route as well which could play a part in limiting the number of services over the WCML north of Lancaster. Even fixing that though there is capacity restraints at Glasgow Central to deal with as well.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,657
5tph in the hours where there is a service from Liverpool to Glasgow, although I guess that would have to give way. That would be getting to the levels of duplication once seen between York and Newcastle.
Could that go hourly, instead of a freight path? Or if that was possible, would the path be better used from somewhere else?

It at least would cover connectivity from Wigan and north - and might enable some other services to speed up (like the Euston-Brum-Scot) ?
 

MatthewHutton

Member
Joined
17 Aug 2024
Messages
1,084
Location
Oxford
An extra Euston-Scotland means 4tph north of Preston.
How will this work with the current flighting policy?
Currently the fast Glasgow goes first from Preston, then the Birmingham and lastly the TPE, with slightly different stopping patterns.
The Birmingham and TPE go alternately to Glasgow and Edinburgh, giving 2tph to Glasgow and 1tph to Edinburgh.
It would appear Edinburgh needs a bigger capacity increase than Glasgow.
You surely wouldn't want 3tph to Glasgow, all leaving within 20 minutes of each other (leaving the rest for freight and some local Northern services).
Network Rail has previously said it can't manage more than the present 3tph.
There's ETCS coming, of course.
You run the services out of London as a flighted pair, then you stop the slower one at Milton Keynes, Warrington Bank Quay and Wigan and slot the Manchester train in the gap between the two London services at Preston.

The Birmingham one can then follow the slower London service with the Liverpool one going in the gap between that and the slower London service caused by stops at Stafford and Crewe. Then the slower London and Manchester trains make all stops north of Preston except Lockabie with perhaps the Birmingham and Liverpool ones providing service there.

Is that not enough?

== Doublepost prevention - post automatically merged: ==

You surely wouldn't want 3tph to Glasgow, all leaving within 20 minutes of each other
You basically have to do this. Edinburgh has two trains arriving from london very close together.
 
Last edited:

lrbvoyager

Member
Joined
2 Jan 2025
Messages
372
I would have thought Avanti needs to up Edinburgh services to 2tph as they are almost always packed. Recently mine was cancelled and I had 2 hours to wait for the next one in Edinburgh and it was utter chaos. Maybe an every 2 hours service from Chester-Edinburgh? Issue with that being there isn’t enough 805s spare. As someone has already said extending the 397s to 7 coaches would help ease pressure. You would need to reconfigure the interior to have more airlines seats and maybe a shop?
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,590
Location
Neilston, East Renfrewshire
I would have thought Avanti needs to up Edinburgh services to 2tph

2 trains per hour instead of the current 1 every 2 hours? Slight overkill I would have thought! If one is cancelled is there no provision to join a Glasgow originator, either by Scotrail via Glasgow or TPE via Carlisle, rather than wait two hours?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,736
Location
"Marston Vale mafia"
I would have thought Avanti needs to up Edinburgh services to 2tph as they are almost always packed. Recently mine was cancelled and I had 2 hours to wait for the next one in Edinburgh and it was utter chaos. Maybe an every 2 hours service from Chester-Edinburgh? Issue with that being there isn’t enough 805s spare. As someone has already said extending the 397s to 7 coaches would help ease pressure. You would need to reconfigure the interior to have more airlines seats and maybe a shop?

Anyone travelling from Edinburgh to London on Avanti is doing so because they've been priced onto that service given that it is something in the order of two hours slower. Adjusting fares would presumably fairly easily resolve any overcrowding issue fairly easily. Obviously two trains into one doesn't go so cancellations will always result in overcrowding. Obviously there's intermediate demand, but that should really fit into an 11 car Pendolino fine.
 

lrbvoyager

Member
Joined
2 Jan 2025
Messages
372
2 trains per hour instead of the current 1 every 2 hours? Slight overkill I would have thought! If one is cancelled is there no provision to join a Glasgow originator, either by Scotrail via Glasgow or TPE via Carlisle, rather than wait two hours?
Sorry I meant 2 trains in 2 hours so 1tph, my bad!! Like one at 12:00 from Euston to Edinburgh then one at 13:00 from Chester to Edinburgh then 14:00 Euston to Edinburgh if you get what I mean?
 
Last edited:

NCT

Established Member
Joined
18 Apr 2025
Messages
2,307
Location
London
Surely the most logical thing to do is to lengthen the Manchester Airport - Scotland service?
 

amahy

Member
Joined
9 Dec 2024
Messages
502
Location
West Dunbartonshire
Could a potential solution to the Edinburgh problem to have standardised Manchester/London to Scotland pairings? So instead of London - Birmingham - Scotland and Manchester - Scotland alternating between going to Edinburgh and Glasgow, you could have the following:

1 tph London to Glasgow fast (as currently)
1 tph London to Edinburgh via Birmingham
1 tph Manchester to Glasgow

This way, the Edinburgh service is always at least 9 coaches, avoiding the crush loading onto a 5 car TPE when the previous Edinburgh train is cancelled. Although I'm not sure Manchester would be happy losing their direct Edinburgh service, nor would the Midlands be happy about losing their direct Glasgow service.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,353
Could a potential solution to the Edinburgh problem to have standardised Manchester/London to Scotland pairings? So instead of London - Birmingham - Scotland and Manchester - Scotland alternating between going to Edinburgh and Glasgow, you could have the following:

1 tph London to Glasgow fast (as currently)
1 tph London to Edinburgh via Birmingham
1 tph Manchester to Glasgow

This way, the Edinburgh service is always at least 9 coaches, avoiding the crush loading onto a 5 car TPE when the previous Edinburgh train is cancelled. Although I'm not sure Manchester would be happy losing their direct Edinburgh service, nor would the Midlands be happy about losing their direct Glasgow service.
the trouble is that this option does nothing at all to enhance the capacity or timetable options northbound from Crewe or Warrington, Crewe being (ironically) the worst-served WCML node on this route!

The elephant in the room (or you could say the gap in the timetable) is not that Euston needs 2 trains an hour to Glasgow but that the trains via Brum are overcrowded due to cheap fares all the way to Scotland being offered on these slow trains, when the capacity is most needed London to Wolves and Brum to Scotland.

By all means run the recent extra Euston - Blackpool trains via the Trent Valley to Scotland instead, but make them serve Crewe and relieve the current Edinburgh trains by going on to there too!
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,657
I would say that if we had to fix the services, Birmingham also has Edinburgh via York.

But eventually HS2 will need Edinburgh from Euston again.

And therefore, all Manchester goes to Edinburgh? And Liverpool-Glasgow increases towards hourly?

I recall a splitting plan for that Liverpool service once upon a time - which could be a faff but cover Manchester - Glasgow off.

Extras to Blackpool/Lancaster - would these compete with additional Liverpool services?
 

lrbvoyager

Member
Joined
2 Jan 2025
Messages
372
This is just a suggestion but you could have as follows:

Glasgow-Euston (fast) 1tph
Glasgow
Carlisle
Preston
Crewe
Euston

Glasgow-Euston (Semi-Fast) 1tph
Glasgow
Motherwell
Carlisle
Penrith North Lakes
Oxenholme Lake District

Lancaster
Preston
Wigan North Western
Warrington Bank Quay
Milton Keynes Central
Euston

Glasgow-Euston (Via Birmingham) 1tp2h
Glasgow
Motherwell
Carlisle
Penrith North Lakes
Oxenholme Lake District

Lancaster
Preston
Wigan North Western
Warrington Bank Quay
Crewe
Stafford
Wolverhampton
Sandwell & Dudley
Birmingham New Street
Birmingham International
Coventry
Milton Keynes
Euston

Edinburgh-Euston (Via Birmingham) 1tp2h
Edinburgh
Haymarket
Carlisle
Penrith North Lakes
Oxenholme Lake District

Lancaster
Preston
Wigan North Western
Warrington Bank Quay
Crewe
Stafford
Wolverhampton
Sandwell & Dudley
Birmingham New Street
Birmingham International
Coventry
Milton Keynes
Euston

Edinburgh-Chester 1tp2h
Edinburgh
Haymarket
Carlsile
Penrith North Lakes
Oxenholme Lake District

Lancaster
Preston
Wigan North Western
Warrington Bank Quay
Chester

Glasgow-Manchester Airport 1tph
Glasgow
Motherwell
Lockerbie
Carlisle
Penrith North Lakes
Oxenholme Lake District
Lancaster
Preston
Bolton
Manchester Oxford Road
Manchester Piccadilly
Manchester Airport

Glasgow-Liverpool Lime Street 1tp4h
Glasgow
Carlisle
Penrith North Lakes
Oxenholme Lake District
Lancatser
Preston
Wigan North Western
St Helens Central
Liverpool

Edinburgh-Manchester Airport 1tp2h
Edinburgh
Haymarket
Lockerbie
Carlisle
Penrith North Lakes
Oxenholme Lake District
Lancatser
Preston
Bolton
Manchester Oxford Road
Manchester Piccadilly
Manchester Airport

Edinburgh-Liverpool Liverpool Lime Street 1tp4h
Edinbrugh
Haymarket
Carlisle
Penrith North Lakes
Oxenholme Lake District
Lancatser
Preston
Wigan North Western
St Helens Central
Liverpool

This might be very over kill! It’s just what I thought would work. Means not always stopping.
 

NCT

Established Member
Joined
18 Apr 2025
Messages
2,307
Location
London
That's far too many services for the available infrastructure to handle.
 

Topological

Established Member
Joined
20 Feb 2023
Messages
4,327
Location
Swansea
IF you want more direct trains from Scotland for places like Chester and Liverpool then portion working with the Manchester is most likely to be the answer.

IF there is an available path then probably the additional London is the best use (as per the thread title)

However, the fast should not serve Crewe. Platforms at Crewe can create delays and Crewe would have the semi-fast to Glasgow with very little time differential compared to the fast (and likley with more space/lower fares)
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,182
Location
Liverpool
This is just a suggestion but you could have as follows:

Glasgow-Euston (fast) 1tph
Glasgow
Carlisle
Preston
Crewe
Euston

Glasgow-Euston (Semi-Fast) 1tph
Glasgow
Motherwell
Carlisle
Penrith North Lakes
Oxenholme Lake District

Lancaster
Preston
Wigan North Western
Warrington Bank Quay
Milton Keynes Central
Euston
Picking up on these two specifically. If we assume the timetable and pathing permitted these services, I feel like the fast would be better off not calling at Crewe and instead simply running non-stop to Preston and calling only at Carlisle and quite possibly Lancaster afterwards. It'd be comparable to the fast Edinburgh on the ECML running non-stop to York and serving only Darlington, Newcastle and Berwick-Upon-Tweed, and from the new winter timetable will call only at York and Newcastle.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,379
It'd be comparable to the fast Edinburgh on the ECML running non-stop to York and serving only Darlington, Newcastle and Berwick-Upon-Tweed, and from the new winter timetable will call only at York and Newcastle.
It would, but the passenger flows for Preston, Carlisle and Glasgow, and the number of paths available, don't easily support such a service missing out the other stops.
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,182
Location
Liverpool
It would, but the passenger flows for Preston, Carlisle and Glasgow, and the number of paths available, don't easily support such a service missing out the other stops.
Certainly not if the service was hourly, hence why I was operating on the assumption that we were able to get both a fast and a semi-fast as is currently the case with LNER Edinburgh trains. I remember the 16:30 calling only at Preston being scrapped because the following 16:33 to Preston was so packed even if it was still a shorter formation. Indeed if this hypothetical semi-fast terminated at Preston you'd have even more demand for the fast going further north.
 

Manutd1999

Member
Joined
21 Feb 2021
Messages
549
Location
UK
How about this for a switch-around?

1) Merge the Manchester-Scotland with an existing XC Manchester service, but starting from Birmingham NS. This could be operated by Pendalinos to give a capacity boost to both Birmingham-Manchester and Manchester-Scotland, also releasing some much needed Voyagers to strengthen other XC services.

2) Switch the existing London-Birmingham-Scotland to run semi-fast via the Trent Valley. This could continue to alternate between Glasgow/Edinburgh to maintain existing connections but could be weighted more towards Glasgow if we think the demand is there (say 4tpd to Edinburgh, with the rest to Glasgow). Pathing up to Crewe may be challenging.....

3) The current Glasgow service can then run faster, skipping Warrington/Wigan/Penrith to take 10+ minutes off the headline journey times.

4) If needed, run an additional Birmingham-Preston stopper to maintain connectivity to Wigan/Warrington.
 
Last edited:

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,379
2) Switch the existing London-Birmingham-Scotland to run semi-fast via the Trent Valley. This could continue to alternate between Glasgow/Edinburgh, maintaining existing connections whilst reducing journey times into London. Pathing up to Crewe may be challenging.....
Just pass the existing Crewe service to the InterCity operator and link it to the existing Birmingham to Glasgow path from Crewe.

1) Merge the Manchester-Scotland with an existing XC Manchester service, but starting from Birmingham NS. This could be operated by Pendalinos to give a capacity boost to both Birmingham-Manchester and Manchester-Scotland, also releasing some much needed Voyagers to strengthen other XC services.
Do people from Birmingham really want the delay of having their Scottish connection going via Manchester? How much time does that add to the journey? It was bad enough in the CrossCountry days with that detour.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,910
How about this for a switch-around?

1) Merge the Manchester-Scotland with an existing XC Manchester service, but starting from Birmingham NS. This could be operated by Pendalinos to give a capacity boost to both Birmingham-Manchester and Manchester-Scotland, also releasing some much needed Voyagers to strengthen other XC services.

2) Switch the existing London-Birmingham-Scotland to run semi-fast via the Trent Valley. This could continue to alternate between Glasgow/Edinburgh to maintain existing connections but could be weighted more towards Glasgow if we think the demand is there (say 4tpd to Edinburgh, with the rest to Glasgow). Pathing up to Crewe may be challenging.....

3) The current Glasgow service can then run faster, skipping Warrington/Wigan/Penrith to take 10+ minutes off the headline journey times.

4) If needed, run an additional Birmingham-Preston stopper to maintain connectivity to Wigan/Warrington.

By my reckoning, 1-3 alone needs a net extra 10-11 Pendolinos, plus 1-2 more platforms at New St, none of which exist.
 