Siemens Staines
Established Member
- Joined
- 30 Jul 2015
- Messages
- 1,549
It is that one.
Thank you
It is that one.
thank youIt is that one, which seems to be 455 more often than not anyway.
Doing relatively minor stuff such as restoring the half hourly evening service through to Reading doesn't require a complete timetable rewrite or a huge increase in resources. Neither does adjusting the times of AM Peak Up Weybridge services to restore connections to the Hounslow loop from Reading. Odd that SWR can add in extra minutes to Reading services as they did mid-timetable in February last year, but can't make minor adjustments that have an actual positive benefit for passengers.SWR don't look to be in a position to make changes yet. Introducing additional services requires more crew when there are already plenty of crew availability related cancellations. The current operating model makes time savings on 701s at peak time disappear far more than any ADBO saving. As more 701s get introduced capacity can be increased at peak times across the network at relatively low cost.
Resurrecting the Houslow Loop service would be a favourite, to restore the 4tph service at Chiswick, Mortlake etcDoing relatively minor stuff such as restoring the half hourly evening service through to Reading doesn't require a complete timetable rewrite or a huge increase in resources. Neither does adjusting the times of AM Peak Up Weybridge services to restore connections to the Hounslow loop from Reading.
Hopefully, they have abandoned their plans of terminating the 2V at Twickenham, which would have meant that Mortlake, N Sheen and St Margarets would have stayed at 2tphResurrecting the Houslow Loop service would be a favourite, to restore the 4tph service at Chiswick, Mortlake etc
Restoring the service through Mortlake to 4tph by extending the Hounslow loop services back to WaterlooDoing relatively minor stuff such as restoring the half hourly evening service through to Reading doesn't require a complete timetable rewrite or a huge increase in resources.
Rant over.
There were some very good people and ideas being worked on, yes, but equally at that time Waterloo throat was already at capacity in the peaks, irrespective of how many more services could be squeezed in to the plan (on paper) further back down the line, be that via ABDO and consequential tightening up of head ways or any other means. Movements through Waterloo throat have/will always dictate the overall level of service possible in the wider context.Back when there was actually some ambition to improve frequency and infrastructure…
These days it’s as if they want everything to stay the same.
I can confirm Bigfoot's comments in post #15,595 about new TT, and can also say that in many ways it will involve a back to basics re write with a firm base, but no small task none the less. As such any temporary tinkering in the short term would very likely take the planning team involved away from their core objective in this regard, as much as I appreciate people aren't happy with some aspects of the TT as it is today.That we've had to wait five years for the 701s then SWR are continuing to use them as an excuse to not even make minor timetable changes just shows how woefully the company has been managed over the past few years, and, outwardly at least, continues to be so (that's a pop at the top of the organisation, not anyone below).
Can anyone advise whether there a thread regarding the SWR T/T change (which I believe is June 2027) and if not, whether it would be best placed in the speculative sub thread?There were some very good people and ideas being worked on, yes, but equally at that time Waterloo throat was already at capacity in the peaks, irrespective of how many more services could be squeezed in to the plan (on paper) further back down the line, be that via ABDO and consequential tightening up of head ways or any other means. Movements through Waterloo throat have/will always dictate the overall level of service possible in the wider context.
It is now generally accepted by many (even within the industry from what I am hearing) that the FG/MTR original bid was over ambitious, and in practice very likely unworkable on the ground. I accept some will disagree with that, so we will just have to see how things pan out over the next couple of years?
== Doublepost prevention - post automatically merged: ==
I can confirm Bigfoot's comments in post #15,595 about new TT, and can also say that in many ways it will involve a back to basics re write with a firm base, but no small task none the less. As such any temporary tinkering in the short term would very likely take the planning team involved away from their core objective in this regard, as much as I appreciate people aren't happy with some aspects of the TT as it is today.
Bare in mind the recent changes at 'the top', before 'one' pop's away too much. A TT change as is being proposed and worked on won't happen in five minutes.
I for one, have confidence in what is being proposed, just so long as those pesky politicians leave the professional railway people to get on with the job.
I have been wondering if the 701s coming out of Marchwood are more ready than those stored further afield. What you say about some newer arrivals jumping the queue reminds me of that.The number of not in passenger service 701/0s at the London end has been relatively consistent. There's 3 at Farnham, unallocated shuffles make it hard to say which ones are there currently. That leaves 12 between Clapham and Wimbledon broadly similar to before, 4 have joined the in service pool this month roughly offsetting the arrivals.
Some have an operational use e.g. 701028 for PTI testing and there might be others. There's a few on the SWR network since at least this summer without seeing service including 701004, 701015, 701024 and 701054. The next 701s to arrive have a good chance of jumping most of those into service in my opinion.
Thanks, I thought it was just me !. It was those paths facilitating the move that failed to materialise which have been driving my curiosity this week !.Three out of four paths were published for a Marchwood to Wimbledon drag for Tuesday this week. Unclear what happened to the Marchwood to Wimbledon schedule to complete the set that didn't appear for whatever reason (light loco Leicester LIP to Eastleigh Yard, Eastleigh Yard to Marchwood and Wimbledon to Leicester LIP were published).
I agree crew availability must be tight while crew are being diverted to training.SWR don't look to be in a position to make changes yet. Introducing additional services requires more crew when there are already plenty of crew availability related cancellations. The current operating model makes time savings on 701s at peak time disappear far more than any ADBO saving. As more 701s get introduced capacity can be increased at peak times across the network at relatively low cost.
+Doing relatively minor stuff such as restoring the half hourly evening service through to Reading doesn't require a complete timetable rewrite or a huge increase in resources. Neither does adjusting the times of AM Peak Up Weybridge services to restore connections to the Hounslow loop from Reading. Odd that SWR can add in extra minutes to Reading services as they did mid-timetable in February last year, but can't make minor adjustments that have an actual positive benefit for passengers.
That we've had to wait five years for the 701s then SWR are continuing to use them as an excuse to not even make minor timetable changes just shows how woefully the company has been managed over the past few years, and, outwardly at least, continues to be so (that's a pop at the top of the organisation, not anyone below).
Rant over.
+Resurrecting the Houslow Loop service would be a favourite, to restore the 4tph service at Chiswick, Mortlake etc
Extra services, although obvious improvements, will require drivers etc that are hopefully currently tied up with driver training on the 701s.Restoring the service through Mortlake to 4tph by extending the Hounslow loop services back to Waterloo
This was a proven fact, but only in hindsight, and has been the case since latter Stagecoach days. There were a couple of trains, most notoriously 2/9G90 and 2/9G92 which would completely break the mornig peak on a regular basis, and when 1 or 2 trains were cancelled especially on the fast lines, the morning peak PPM improved dramatically on those days where no other factors were in play.It is now generally accepted by many (even within the industry from what I am hearing) that the FG/MTR original bid was over ambitious, and in practice very likely unworkable on the ground. I accept some will disagree with that, so we will just have to see how things pan out over the next couple of years?
Yes, 5M03 tended to be a 455 on most Mondays anyway. A mixed bag this week: Mon = 455, Tue = 701, Wed = 701, Thur = 455, Fri (today) = 701thank you
Class 701/0 No. 021 is the South Western Railway (SWR) Arterio electric multiple unit nicknamed "Phoenix." This ten-car train (unit number 701021) was recently named in a nod to its "rebirth" after overcoming significant production and testing delays that sidelined the fleet for years. As of November 28, 2025, it's among the approximately 20 units now in regular passenger service on suburban routes from London Waterloo, including to Windsor & Eton Riverside, Shepperton, and Reading. The naming was spotted and shared by rail enthusiasts on social media, highlighting its symbolic return to operation after the class's troubled rollout.Does anyone know which 701 unit number has been given the "Phoenix" name?
I think the Phoenix name is more to do with Aldershot football club based on the online video that's been posted...Class 701/0 No. 021 is the South Western Railway (SWR) Arterio electric multiple unit nicknamed "Phoenix." This ten-car train (unit number 701021) was recently named in a nod to its "rebirth" after overcoming significant production and testing delays that sidelined the fleet for years. As of November 28, 2025, it's among the approximately 20 units now in regular passenger service on suburban routes from London Waterloo, including to Windsor & Eton Riverside, Shepperton, and Reading. The naming was spotted and shared by rail enthusiasts on social media, highlighting its symbolic return to operation after the class's troubled rollout.
Found this....Although I think there are more than 20 units out there.
No disrespect meant at all to your good self, but the point you mention re-inforces my point about the overall SW TT, in that the throat at Waterloo in the timetabling sense was, and still is the driving force in timetable capacity at Waterloo.when 1 or 2 trains were cancelled especially on the fast lines, the morning peak PPM improved dramatically on those days where no other factors were in play.
Hence the need for a hole for the 701s to go down.No disrespect meant at all to your good self, but the point you mention re-inforces my point about the overall SW TT, in that the throat at Waterloo in the timetabling sense was, and still is the driving force in timetable capacity at Waterloo.
Particularly an issue as the railway is now the only link across the Thames between Putney and Chiswick Bridges. Hammersmith Bridge has been closed for six years now and shows no signs of being reoPened any time soon.Restoring the service through Mortlake to 4tph by extending the Hounslow loop services back to Waterloo
Currently five in the sidings there - 004, 011, 040, 043, 052The number of not in passenger service 701/0s at the London end has been relatively consistent. There's 3 at Farnham, unallocated shuffles make it hard to say which ones are there currently.
043 has been in service for nearly two years now, and was still in service as recently as yesterdayBeleive 701043 is the "in service" one stabled at Farnham for the diagram on Monday ?? (The other 4 are inbdeed "pre-service" units).
The major problem is that there is little if any space left at all locations for any further siding extensions in the suburban area. Every suburban depot was looked in to for the original SWT 10 car plan, and siding extensions and remodelling of track layouts was undertaken where ever possible to accommodate the 10 car 455+456, 458 and 707 formations.I wonder how much cheaper than making Waterloo bigger the costs of replacing all 5car stabling/depot capacity by 10car capacity is ?
One of a very few in the soft launch rotation too.043 has been in service for nearly two years now, and was still in service as recently as yesterday
There is still remit for ten extra 10 car roads at Feltham, it will take time of course but certainly doable.The major problem is that there is little if any space left at all locations for any further siding extensions in the suburban area. Every suburban depot was looked in to for the original SWT 10 car plan, and siding extensions and remodelling of track layouts was undertaken where ever possible to accommodate the 10 car 455+456, 458 and 707 formations.
I did see mention of that up thread somewhere, but hadn't heard anything about same from any other source. The main headache in this, will be enough 10 car sidings in the correct places to start (and finish) the service every day, whilst keeping associated empty moves, for which there may not be pathways, to a minimum.There is still remit for ten extra 10 car roads at Feltham, it will take time of course but certainly doable.
Thanks...Looks like you are correct...At least I know now.I think the Phoenix name is more to do with Aldershot football club based on the online video that's been posted...
Their badge features a phoenix and the club were recently successful the FA trophy final.
It was the last of the first three to enter service, in January 2024. Another two entered service in February and March (one of them being 701028, which only ever ran three times in passenger service) and another two in the autumn.[701043] One of a very few in the soft launch rotation too.
This is because of engineering work through Wimbledon today and services being diverted via the Windsor lines and Chertsey. Probably because nobody uses - well pays to travel on the loop services as there are no gated stations so people don't tap in and out. The services might be busy but not according to the income from those stations.It is farcical how low the commitment to service on that branch is - for example today there is a 1tph service
A 2026 subclass entry-to-service for 701/5, wow...701/5s won't be seen until at least the middle of next year in passenger service.
Well they're not going to use it if the service is so poor!This is because of engineering work through Wimbledon today and services being diverted via the Windsor lines and Chertsey. Probably because nobody uses - well pays to travel on the loop services as there are no gated stations so people don't tap in and out. The services might be busy but not according to the income from those stations.