Will the Class 197s be the last pure diesel unit to be ordered?

Status
Not open for further replies.

Technologist

Member
Joined
29 May 2018
Messages
471
And fitted with highly polluting tyres...

That's a load of FUD when environmentalists lost the emissions arguments due to EVs, it's not really applicable to the countryside and the best way to solve it is to keep your roads nice and smooth.

You can design a battery electric train to do any journey on the UK rail network it's just a matter of fitting enough batteries to the vehicle, improving aero and putting in the correct charging provision or having a partially electrified line. For low usage lines you can generally just charge in a terminating station, cars are already charging at 1 MW so you could do this with just a few EV chargers plugged in at once.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,861
Rhydgaled said:
Surely they could have added electric/battery hybrid 331s instead of additional 195s?
They weren't on offer. The options were essentially order the additional 3 195s, or nothing.
That depends if CAF were in a position to offer a battery hybrid with sufficient range in 2018, which seems unlikely.
Even if CAF was prepared to make them, why would Northern want 3 non standard units?
I suggested 3x battery-hybrid 331s instead of the 3 additonal 195s because it seems like it would have been a good fit for the Windermere battery hybrid trail, which Jo Johnson announced in that February 2018 speech. Displacing 3x 195 from Windermere (assuming it needs that many diagrams) by putting 3x new-build hybrid 331s on it would have been a similar boost to the size of the Northern fleet. Since I've no idea if anything became of the Windermere battery project I can only speculate, but unless DfT decided between Feb2018 and Nov2018 to cancel the Windermere scheme, I can't think why that wouldn't have been an alternative to more 195s. I also don't know for sure whether CAF had anything to do with the Windermere IPEMU idea, but it seems logical to use 331s as the base for the IPEMU rather than a micro fleet of 3 battery units with even less in common with Northern's other units.

Ordering 19X class earlier would have just meant retiring some older stock earlier than they were [snip] but it doesn't make that much of a difference to the environment if a class is retired in 2015 earlier than necessary or if its successor is in 2049.
Agreed, it wouldn't make any difference to waste if you did that (unless of course you retained the older stock to increase the overal fleet size (to boost capacity, frequency or reopen lines). However ordering 19x earlier is not what I was trying to suggest there. I was meerly giving the 'powers that be' some leeway for ordering 19x before the 2040 withdrawal target for diesel trains was announced, particularly since my current views on these units have changed (perhaps significantly) with the benefit of hindsight. I now, in 2025, think the 195s are an utter garbage design that should never have existed at all, and the 196s and 197s aren't much better. At most, I think a fleet of around 26-30 units, with a mix of design features from all three classes (most notably, with end gangways as per the 196s and 197s), should have been ordered (probably around the time the 195s were in reality), though I'm not sure if they should have gone to Northern or West Mids.

The 2040 Jo Johnson target has never been a serious target because of the difficulty in decarbonising rural routes.
Yes and no. On the one hand, thank's to Northern's class 195 order, it could be seen as trying to 'close the door after the horse has bolted.' However, the wording of Jo Johnson's ambition "take all diesel-only trains off the track by 2040" meant that, the Civity DMUs aside, it was a more-credible target than it would otherwise have seemed.

There are enough rural routes to run 19X on until they are life expired. Decarbonising the Cambrian Coast, Settle and Far North lines by X date is driven by ideological purity rather than a meaningful environmental impact on diesel running very rural lines.
Again; yes & no. Yes, the impact of running the infrequent 2-car diesel services in somewhere like Builth Road is of little significance, but where exactly do you 'draw the line'; and existing orders already total 161 CAF Civity DMUs, with worrying rumours that TfW might order more. For routes without freight, my view is that any route which carries 5+ coaches per direction per hour really ought to be electrified, as a minimum.

Network Rail's Traction Decarbonisation Network Strategy (TDNS), in their own words, "looks at every section of unelectrified line in the country to see where each solution can be most effectively used." Of "the 15,400 single track kilometres (STK) of unelectrified rail network in Great Britain", the TDNS recommended electrification for the vast majority, leaving just 2,360 STK either undecided or where alternative traction (battery or hydrogen) was the prefered decarbonisation solution. When this was published, I had a go at estimating how many diagrams would be required to operate each of the routes remaining unwired. Hopefully the following selection of some of the routes in question will illustrate just how over-simplistic the idea that the 161 CAF Civity DMUs have plenty of work ahead of them is:
  • Hydrogen Proposed
    • Shrewsbury - Aberystwyth & Pwllheli (Cambrian Lines)
    • Llangennech - Builth Road - Craven Arms (Heart Of Wales line)
    • Ipswich/Westerfield - Lowestoft
    • Lowestoft - Norwich
  • Battery Proposed
    • St. Erth - St. Ives
    • Truro - Falmouth Docks
    • Liskeard - Looe
    • Gunnislake - St. Budeaux/Plymouth
    • Castle Cary - Upwey/Weymouth
    • Newport (Casnewydd) - Ebbw Vale (the TfW-owned Core Valley Lines appear to have been excluded from the TDNS report, but Maesteg and the Vale Of Glamorgan are shown as routes for electrification)
    • Marlow - Maidenhead
    • Wrexham - Bidston
    • Blackpool South
There needed to be another model of DMUs following the Turbostars to bridge the gap to decarbonising most lines and to run rural services in the 2040s (and probably into 250s).
Assuming you include the 172s among 'Turbostars' then I disagree; not in large numbers anyway and certainly not in the form of the Civities we've ended up with. Drip-feeding a few extra class 172/2 and 172/3 units into service between 2011 and 2015, maybe, but even then there hasn't really been a new unit designed for GB rural services post-privatisation (the class 175s come close, but with their 100mph top-speed and high leasing costs I'm not sure whether they are too expensive for such routes, so don't know whether you can count them as a 'rural' unit - even if you do there are/were only 27 of them). The Turbostars, 185s and now Civities are all based on increasing standing room and cutting dwell times for busy urban services, like the Liverpool - Warrington Central - Manchester Airport route which was one of the first to see the 195s in use - however most such routes are frontrunners for electrification.

They could, and in my view should, have ordered bimodes or trimodes (e.g. 755s, 756s, or even 231s) to replace the retiring like diesel units - these have a long-term future, and were ordered around the same time as the 19x.
Agreed, it should have been bi-modes or EMUs only for all new train orders from 2015 onwards. I would however have taken a SMALL order (say 30 three-car units, maximum) for long-distance-spec Civity DMUs (think 197s crossed with 397s, ie. narrower external doors to make room for more legroom, tables and toilets) in place of either the 195s or the 197s to try and encourage modal shift from cars by providing a high-quality experience if the only bi-modes options available had too much doorway as the UK FLIRTs (in common with Turbostars, 185s, 197s, 350s etc.) have all had. Even the supposedly 'InterCity' EMU version on GA has double-width doors throughout, and to make matters even worse GA apparently don't use the internal vestible draught excluder doors.

Wouldn't a 756/0 (or even a theoretical "3-car" 231) have been more expensive than even a "197113-126" 197?
Quite possibly, but KeolisAmey didn't need to promise to replace the entire ATW fleet in their bid (although perhaps they wouldn't have won the contract otherwise). They could have kept the 158s (and possibly the 175s) and ordered a bi-mode, 100mph, version of the class 397s with the class 196 cabs to supplement the class 158s and mark 4s on the long-distance routes, cascading the 175s to things like the Conwy Valley and Heart Of Wales (or obtaining ex-GA class 156s for those and letting the 175s go to Northern, GWR or EMR). Expensive the bi-mode option may be, but if they'd kept the 158s and 175s they'd need far less of them than the total fleet replacement 197s and, unlike the cavity abominations, bi-modes wouldn't get in the way of things like wiring Shrewsbury-Wovlerhampton to allow WMT to put EMUs on their stopping services. As well as CAF offering a bi-mode Civity on their website in the past, a bi-mode Aventra was apparently offered for the MML (but lost out to Hitachi's class 810s), meaning Stadler probably didn't have a monopoly on bi-modes either.

It's a pitty we haven't seen anyone have a go at a FLIRT UK with a long-distance/rural design specification - either longer vehicles with just the one double-door per side (pretty sure GA's, although only one door, retain the short vehicles) or retain the short vehicles but reduce the door width to match a 175 (or even have no door at all on some vehicles).
 

390112A

Member
Joined
7 May 2017
Messages
69
Location
Liverpool
There needed to be another model of DMUs following the Turbostars to bridge the gap to decarbonising most lines and to run rural services in the 2040s (and probably into 250s).

Assuming you include the 172s among 'Turbostars' then I disagree; not in large numbers anyway and certainly not in the form of the Civities we've ended up with. Drip-feeding a few extra class 172/2 and 172/3 units into service between 2011 and 2015
I understand your logic here and to an extent agree and believe that a decent size order for more 172s should have been placed 2011-13 this would allow for growth, this would have been along side a proper electrification scheme across the UK to last throughout the 2010s planning as they go into the 2020s. This would have allowed orders of EMUs to cascade younger DMUs away to replace older DMUs.

In an ideal world easy schemes such as.
Third Rail Infill schemes - Uckfield, Ashford, North Downs. (releases 171s + 166s)
Full completion of the GWML electrification.
Expansion schemes - Should of electrified Cheshire Lines same time as Chat Moss (northern DMUs) and more infill around Manchester such as earlier completion of other bits the 769s now use.
And Schemes only now taking place should of been planning and delivering a decade ago TransPennine Route Upgrade (185s), Cardiff Valleys (replaces paces and allows sprinter cascade) and the long awaited MML program delivered earlier (222s).

While admittedly Scotland has done considerably more than others, not having a rolling Glasgow scheme when they electrified the Whifflet line was a mistake, so could have been improved to also electrify East Kilbride, Barrhead and Kilmarnock (156s) during the same time plus also doing the Edinburgh Glasgow Improvement Program during the 2012-2020 period. Fife Circle/Borders electrification(158/170s) then could have taken place and then Leven could have reopened as an electrified railway. (This though is really just wishing the flow between schemes was a little faster/more efficient)

Plus with starting the above programs earlier we would now be on even more programs Chiltern (168s), Snow Hill lines (172s), Hope Valley, maybe even stuff around Bristol, Exeter, Leeds, Newcastle.

If we had done this in the last 10 years I estimate the same number of DMUs would have been released as the 19Xs total.

Additionally more routes in the last 5 years may have been able to order bimode/battery units to take advantage of all the additional electrification. (eg South Wales(756/231s), Windermere, North Pennine, Scotland, Thames Branches)

Climate Change and the need to decarbonise has been no secret and the 2010s was an incredibly wasteful decade in the fight against global warming not just in the railway industry nor only in the UK but in the world as a whole. Additionally it is well known that an railway with longer greener cleaner trains is an attractive railway that often leads to additional growth.

Additionally I am in the camp with the 197s that there was no problem with the 175s so should not of been replaced and 197s should have been to strengthen services along side.

Even without all the above ordering the 19X to not be EMU ready convertible was a serious flaw and is even more confusing when the first one 195 is a diesel version of the 331 so you would think it would have been easier when designing to just take the AC traction away from a 331 and replace it with a ICE and generator so it was just the same train fed two different ways. so in the future it would be easy do a few tweaks, to add a panto car and remove the engines.
 
Last edited:

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,997
Location
Wales (sometimes in England), thanks for replying!
Assuming you include the 172s among 'Turbostars'
172s are very much Bombardier Turbostars, in the same Turbostar family as the ADtranz/Bombardier 168s/170s/171s and were built in the same factory. The 172/0s and 172/1s even have the 2002-2005 design of 168/170/171 cab.

I just group the 172s with the 195s/196s/197s (CAF Civity UK DMUs) because they all have the MTU 1800 Series engines coupled to 6-speed ZF gearboxes, and the 172s were built in the same decade (2010s) as some of the 195s and 196s.

Funnily enough, the 161 figure for the combined number of 195s/196s/197s, well, as there are 39 172s, the combined number of 172s/195s/196s/197s is a neat 200!
 

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,408
FLIRTs look likely to be the first non-pure diesel trains (as far as I know) to be operating in Northern Ireland.

https://www.railwaygazette.com/trac...dublin-belfast-enterprise-fleet/70100.article

EUROPE: Ireland’s national railway Iarnród Éireann and North Ireland’s Translink have jointly selected Stadler from the three bidders for a contract to supply trainsets to replace locomotive-hauled rolling stock on the cross-border Dublin – Belfast Enterprise service.

Stadler had been informed that it was the preferred bidder in mid-September, but the award process was delayed when rival bidder CAF launched a legal challenge during the standstill period prior. The injunction sought by CAF was lifted at the High Court in Dublin on November 26, with the court noting the time-critical importance of securing EU funding contributions and also accepting that there is an urgent need to address emissions and improve accessibility.
 