A small corner of the common and a few industrial units is not a massive ask. Just ask the residents of Bedford! There's also the option of routing via Soham and Ely. Arguably, routing the freight that way frees up capacity along the line for more passenger service at Cherry Hinton, Fulborn, Dullingham, and Newmarket.
I'd argue it's a lot less circuitous, especially to Cambridge North, where the Science Park is!
I'll take those 10 minutes with a pinch of salt, but regardless, even 10 minutes doesn't make the difference to commuting range. Just think of it as bringing the Science Park into your commuting range of Bedford and Stewartby
That can be moved, or you can built a new rail bridge on the other side.
Off the top of my head, in no particular order (and I'm sure there are other options):
- You stop up the existing road. I would imagine there would be a bit of uproar if you didn't replace the link in some fashion! Conceivably you could do something with Moss Bank and the yard on the other side with a new dogleg link under the railway.
- You raise the railway up and bridge the road. Cambridge North complicates this, but it's not impossible, just very expensive, and there would be lengthy closures.
- You drive the road under the railway. The junctions for Moss Bank & Cheney Way complicate this, probably too much. That's before you even begin to consider the flood risk.
Perhaps. There also the option of putting it up on an embankment, though. A lot of the proposed southern approach is going to up on an embankment, abet though a much less built-up area.
Whilst I think it would be a better solution, I would expect any theoretical northern approach would skirt Milton, though, leaving the busway well alone.
I suspect the local service would continue to be well used running on parallel roads, with passengers from further out enjoying faster journey times by rail.