On a point of pedantry, It wont be a loop as such but rather just extending the dock line to join south of the platform. Down will be towards Portishead, Up to Bristol.

So you'll have a Portishead Single on the 'down' side with one platform for both directions and a Portbury Docks Single/Siding (or whatever it ends up being called) on the 'up' side without a platform, I think.
Pedantic is good for me! I was just curious from historical point of view which side was up/down so thank you for explaining that part.

Might take a wonder today and grab some photos of any work going on.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

tumbles

Member
Joined
13 Aug 2020
Messages
182
Location
Portishead
On a point of pedantry, It wont be a loop as such but rather just extending the dock line to join south of the platform. Down will be towards Portishead, Up to Bristol.

So you'll have a Portishead Single on the 'down' side with one platform for both directions and a Portbury Docks Single/Siding (or whatever it ends up being called) on the 'up' side without a platform, I think.
Something I was thinking about today which I think you may have confirmed - are we saying there will be double track from Portbury dock stop board to the end of pill station/start of viaduct. I just didn’t imagine there was the space to have two lines from the current points around to the north end of the station. Certainly the bridge that goes over footpath just by it is single track width
 

Annetts key

Established Member
Joined
13 Feb 2021
Messages
3,792
Location
West is best
Something I was thinking about today which I think you may have confirmed - are we saying there will be double track from Portbury dock stop board to the end of pill station/start of viaduct. I just didn’t imagine there was the space to have two lines from the current points around to the north end of the station. Certainly the bridge that goes over footpath just by it is single track width
I posted a diagram of the intended track layout here.

Through the station at Pill, there will be two single lines. One going to Portishead. This will be a new line. And the existing freight line to Portbury docks. The single lines diverge at the site of the non-existent junction where there is currently a gate (or fence, forget which) across the currently disused track get for the Portishead line. Although a point was provided here when the new freight line to the docks was constructed, at some time the point was removed. The track being plain lines where it was.
 

tumbles

Member
Joined
13 Aug 2020
Messages
182
Location
Portishead
I posted a diagram of the intended track layout here.

Through the station at Pill, there will be two single lines. One going to Portishead. This will be a new line. And the existing freight line to Portbury docks. The single lines diverge at the site of the non-existent junction where there is currently a gate (or fence, forget which) across the currently disused track get for the Portishead line. Although a point was provided here when the new freight line to the docks was constructed, at some time the point was removed. The track being plain lines where it was.
Interesting then as they’re going to have to widen the bridge at Avon Road/Lodway Close. I genuinely didn’t think there was space to do this without impeding on some of the gardens to the right

IMG_7240.jpeg

Will take a wonder down there at weekend and see if they’re cutting back either side of the bank.
 
Last edited:

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,411
Location
Northampton
Interesting then as they’re going to have to widen the bridge at Avon Road/Lodway Close. I genuinely didn’t think there was space to do this without impeding on some of the gardens to the right

View attachment 192235
The DCO has all the relevant documents. Drawing: https://nsip-documents.planninginsp...R040011-000349-2.22 Avon Road Underbridge.pdf refers. The bridge is being widened to the left, the existing Portbury single is staying where it is on the east side of the formation.

1763074284536.png
The green outline is the existing bridge, red is the new one.

(DCO website: https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/TR040011)
 

tumbles

Member
Joined
13 Aug 2020
Messages
182
Location
Portishead
The DCO has all the relevant documents. Drawing: https://nsip-documents.planninginspectorate.gov.uk/published-documents/TR040011-000349-2.22 Avon Road Underbridge.pdf refers. The bridge is being widened to the left, the existing Portbury single is staying where it is on the east side of the formation.

View attachment 192236
The green outline is the existing bridge, red is the new one.

(DCO website: https://national-infrastructure-consenting.planninginspectorate.gov.uk/projects/TR040011)

Thank you. I did go through the DCO page on my phone but its difficult sifting through all the documents on a small screen.

I do love some of the letters sent in about the scheme held on the DCO portal. This one in particular https://nsip-documents.planninginspectorate.gov.uk/published-documents/TR040011-001670-Kevin O'Hanlon_Redacted.pdf - apparently we can still run frieght on the line while tarmacing over the line..
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,076
What a complete load of bollocks. “Nobody wants to go to Temple Meads?”
Watch people flood off trains in the morning peak and say it again with a straight face.
 

tumbles

Member
Joined
13 Aug 2020
Messages
182
Location
Portishead
What a complete load of bollocks. “Nobody wants to go to Temple Meads?”
Watch people flood off trains in the morning peak and say it again with a straight face.
There was a very strange campaign from a group called the 'Portishead Busway' Scheme. It was borderline bat**** crazy at times. Amongst the suggestions were putting rubber mats either side of the rails to allow for Buses to run in tandem with freight traffic. That there would be no need to cut back Avon Gorge Whitebeam if they ran buses - despite the fact double decker buses are taller than a 165/166. Then one final effort where they suggested just having a guided bus Portishead to M5 J19 junction and then using the existing roads. Most of these ideas came from someone who lived in Brislington on the other side of Bristol.

Anyway I really will make effort to get some pics of the works so far this weekend, quite a lot going on so far.
 
Last edited:

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,411
Location
Northampton
What a complete load of bollocks. “Nobody wants to go to Temple Meads?”
Watch people flood off trains in the morning peak and say it again with a straight face.
Indeed. They've closed the peak-only gateline further up platform 3 that leads out to Temple Quay for renovations at the moment and it's causing chaos when even a 2-car train from Severn Beach or Filton Abbey Wood comes in. If a Clifton Down and London train arrive in short succession the gates are generally thrown open to clear the crowd (not helped by the scaffold towers of course).
 

tumbles

Member
Joined
13 Aug 2020
Messages
182
Location
Portishead
Indeed. They've closed the peak-only gateline further up platform 3 that leads out to Temple Quay for renovations at the moment and it's causing chaos when even a 2-car train from Severn Beach or Filton Abbey Wood comes in. If a Clifton Down and London train arrive in short succession the gates are generally thrown open to clear the crowd (not helped by the scaffold towers of course).

... and will only get busier with the likes of Hargreaves & Lansdown relocating nearby.
 

tumbles

Member
Joined
13 Aug 2020
Messages
182
Location
Portishead
Couple of shots this lunchtime of initial clearance work - from just where the line at Portishead used to be double track. Couldn’t stop by Portbury Station but they have cleared the track almost down to the M5 J19 junction

IMG_7279.jpeg

IMG_7275.jpeg
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,311
Location
Somerset
What a complete load of bollocks. “Nobody wants to go to Temple Meads?”
Watch people flood off trains in the morning peak and say it again with a straight face.
Pedantry alert - for the majority of those arriving in the peak it’s probably true - they don’t want to go but know they won’t get paid if they don’t!!! (Said with feeling as one of those negotiating Temple Meads at that those times of day!)
 

37114

Member
Joined
4 Jul 2019
Messages
506
Actually got me thinking what physical infrastructure (Platforms/Station buildings) will be left on the Portishead Branch.

Ashton Signal Box - demo'd early 1990s?
Ashton Gate Station - Platforms remain
Clifton Bridge Station - Platforms & Bridge remain
Nightingale Valley Halt - Nothing remains
Ham Green Halt - Platform remain
Pill Station - Signal box demolished in 1964, Street level buildings due for demo by end of year, coal sidings removed in 2000 prior to freight reopening.
Portbury Shipyard - Nothing remains.
Portbury Station - platform & station now private residence.
Portishead Station(s) - Pier station building demo'd for RNLI 2015, Original station demo' 1954, Second Station closed 1964, used as part of petrol station till Waitrose? circa 2000.

So the demo of the Pill buildings will leave pretty much just a few platforms and Portbury station as the only remements of the original line operation.
Ashton Signal box went around 1998, I used to work for a local container haulier who had a yard on the Carla trading estate next door, one of the drivers told me when he arrived back at the office that the signal box had been on fire.
 

contrex

Established Member
Joined
19 May 2009
Messages
1,657
Location
St Werburghs, Bristol
Pedantry alert - for the majority of those arriving in the peak it’s probably true - they don’t want to go but know they won’t get paid if they don’t!!! (Said with feeling as one of those negotiating Temple Meads at that those times of day!)
Are you thinking of PINS by any chance?
 

tumbles

Member
Joined
13 Aug 2020
Messages
182
Location
Portishead
Is there an updated programme of works online anywhere?

Not sure you mean this or BB but Portishead work on clearing the area for station and car park starts on 9th December with traffic lights around the Quays Avenue roundabout. Best to avoid at peak time as it will be chaos
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,411
Location
Northampton
Not sure you mean this or BB but Portishead work on clearing the area for station and car park starts on 9th December with traffic lights around the Quays Avenue roundabout. Best to avoid at peak time as it will be chaos
That's one item, I was more meaning the overall timeline of construction. Given the delays anything previously published for planning etc will be well out of date, although a lot of it may simply just 'slide to the right'.
 

Annetts key

Established Member
Joined
13 Feb 2021
Messages
3,792
Location
West is best
Ashton Signal box went around 1998, I used to work for a local container haulier who had a yard on the Carla trading estate next door, one of the drivers told me when he arrived back at the office that the signal box had been on fire.
The only "regular" traffic that I was aware of In the late 1980s was the engineering train to and from the Ashton engineering depot. It typically moved on Tuedays and Thursdays if my memory is correct. Apart from when specially requested, that's the only time that it was staffed. Typically a S&T maintenance team would also be present if possible.

When the engineering train no longer ran, visits from railway staff to Ashton significantly reduced.

In the early to mid 1990s (maybe 1993) all the electrical circuits between the nearest Bristol PSB controlled Interlocking and Ashton Junction signal box were disconnected. I believe this was due to the poor state of the electrical signalling equipment in the box.

I don't know for certain, but I don't think any further rail traffic used the line after this.

Sadly, vandals smashed the windows and set fires. A shame because otherwise it was not in too bad a condition considering the lack of love or maintenance..
 

tumbles

Member
Joined
13 Aug 2020
Messages
182
Location
Portishead
That's one item, I was more meaning the overall timeline of construction. Given the delays anything previously published for planning etc will be well out of date, although a lot of it may simply just 'slide to the right'.
Ah yes apologies. Not seen anything as yet. The Portishead rail group usually seem to get word of plans before most. At present the remedial work is mostly being done by Glendale on behalf of NSC. I forget that they own the track from Portbury Docks to Portishead. Assume at some point it’ll be transferred back to NR ownership.

== Doublepost prevention - post automatically merged: ==

The only "regular" traffic that I was aware of In the late 1980s was the engineering train to and from the Ashton engineering depot. It typically moved on Tuedays and Thursdays if my memory is correct. Apart from when specially requested, that's the only time that it was staffed. Typically a S&T maintenance team would also be present if possible.

When the engineering train no longer ran, visits from railway staff to Ashton significantly reduced.

In the early to mid 1990s (maybe 1993) all the electrical circuits between the nearest Bristol PSB controlled Interlocking and Ashton Junction signal box were disconnected. I believe this was due to the poor state of the electrical signalling equipment in the box.

I don't know for certain, but I don't think any further rail traffic used the line after this.

Sadly, vandals smashed the windows and set fires. A shame because otherwise it was not in too bad a condition considering the lack of love or maintenance..
Loved that signal box and always wanted to convert it and live in it when was a child.

I don’t recall ever seeing any freight traffic passing down the line. It was technically closed off in 1981 I think? It was a miracle in a way that they ran trains down the line in 1985 given pretty poor state of the line. No way that would happen now.

At some point maybe late 80s I think some track was pinched/lifted down by where nightingale halt was.

Do remember seeing a survey train of sorts running down it in mid/late 90s. Maybe doing some assessment for the eventual reopening in 2000/2001
 

Annetts key

Established Member
Joined
13 Feb 2021
Messages
3,792
Location
West is best
I don’t recall ever seeing any freight traffic passing down the line. It was technically closed off in 1981 I think? It was a miracle in a way that they ran trains down the line in 1985 given pretty poor state of the line. No way that would happen now.

At some point maybe late 80s I think some track was pinched/lifted down by where nightingale halt was.

Do remember seeing a survey train of sorts running down it in mid/late 90s. Maybe doing some assessment for the eventual reopening in 2000/2001
The engineering train (a BR departmental train) I was talking about was only going to the Ashton engineering depot shown in this Google Earth view.

Very occasionally a light loco or on track machine would ventre along the Portishead line towards Pill or maybe slightly beyond. But that only happened as far as I know while BR existed. I myself did walk from Ashton Junction signal box to the first tunnel in around 1988 or 1989. That part was fine at the time.

In later years, yes, thieves nicked rails and chairs from various places.

Ashton Junction signal box still had and used gas lighting on the operating floor. I saw it working once when I was in the box with the signaller. It never got mains electricity. The only electrical supply was for the signalling equipment (mostly to supply the barriers and the relays that interfaced to Bristol PSB area of control). Most of the booms were still the wood type.
 

tumbles

Member
Joined
13 Aug 2020
Messages
182
Location
Portishead
The engineering train (a BR departmental train) I was talking about was only going to the Ashton engineering depot shown in this Google Earth view.

Very occasionally a light loco or on track machine would ventre along the Portishead line towards Pill or maybe slightly beyond. But that only happened as far as I know while BR existed. I myself did walk from Ashton Junction signal box to the first tunnel in around 1988 or 1989. That part was fine at the time.

In later years, yes, thieves nicked rails and chairs from various places.

Ashton Junction signal box still had and used gas lighting on the operating floor. I saw it working once when I was in the box with the signaller. It never got mains electricity. The only electrical supply was for the signalling equipment (mostly to supply the barriers and the relays that interfaced to Bristol PSB area of control). Most of the booms were still the wood type.
Ah yeah, I think the original BR sign for the entrance to the engineering dept was still there (albeit covered) until very recently. I am sure I recall some sort of surveying train going down in mid 90s when at School and could hear it from the playfields by Ham Green Halt.

Real shame about the signal box, I guess it would have been gone by now anyway or at least saved for a preservation line perhaps. Wonder how many there were in total on the branch - defo one at Pill and imagine there was one at Portishead originally.
 

sharpener

Member
Joined
4 Oct 2018
Messages
372
Real shame about the signal box, I guess it would have been gone by now anyway or at least saved for a preservation line perhaps. Wonder how many there were in total on the branch - defo one at Pill and imagine there was one at Portishead originally.

Marked a phase in my life as I worked at Strachan & Henshaw (RIP, now Babcock) from 1989 - 1993. But am glad the line is being brought back into use now.

Bridge swings used to play havoc with the rush hour traffic. Are they still even possible? I saw the last sand dredger come into Poole's Wharf before it was redeveloped for housing.

And much earlier on (1974 - 1977) I was on the Cambridge Science Park and on a slow day could watch the St Ives gravel trains from my office window. The LC on Milton Rd was always closed for a long time bc IIRC someone had to walk the length of the train. The alternative was the grotty narrow underpass. All cleared away for the Misguided Busway.

Happy days.
 

37114

Member
Joined
4 Jul 2019
Messages
506
When I worked for a Bristol company that was subcontracted to them, we were told to say 'Strawn' and not 'Strackan' (like Michaela). Can you confirm this?
Everyone I knew in Bristol (including those with connections to the company) called them 'Strawn'
 

themiller

Established Member
Joined
4 Dec 2011
Messages
1,380
Location
Cumbria, UK
When I worked for a Bristol company that was subcontracted to them, we were told to say 'Strawn' and not 'Strackan' (like Michaela). Can you confirm this?
At Sellafield we had cranes made by S&H at Bristol and the pronunciation was Strawn.
 

sharpener

Member
Joined
4 Oct 2018
Messages
372
When I worked for a Bristol company that was subcontracted to them, we were told to say 'Strawn' and not 'Strackan' (like Michaela). Can you confirm this?

Yes, as others have already said that is the official pronunciation. (There was a sister company that made printing machinery, ditto.)

They were a client of my previous company otherwise I would have found it confusing at first, as one of my oldest university friends was a Strachan pronounced in the other fashion.
 

Roger B

Established Member
Joined
16 Jun 2018
Messages
1,259
Location
Gatley
Yes, as others have already said that is the official pronunciation. (There was a sister company that made printing machinery, ditto.)

They were a client of my previous company otherwise I would have found it confusing at first, as one of my oldest university friends was a Strachan pronounced in the other fashion.
There was also a company called Strachans (pronounced "Strawns") that manufactured bus and coach bodies until the mid-seventies. I have to say that, to my eye, they were some of the least aesthetically pleasing designs.
 