• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

DLR B23 Stock (CAF Inneo)

JCO1406

Member
Joined
28 May 2024
Messages
190
Location
London
Its been a month now since the first train entered service. How many units are in service now?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Roast Veg

Established Member
Joined
28 Oct 2016
Messages
2,320
Difficult to say unless Beckton depot is open again - it was closed all weekend I believe.
 

JCO1406

Member
Joined
28 May 2024
Messages
190
Location
London
I can confirm that I saw 2 units on the woolwich line plus a test train. Didnt catch the numbers tho
 

charles123

Member
Joined
11 Dec 2019
Messages
34
Location
Newcastle
Was travelling today and overheard the PSA talking to a colleague. Supposedly the B23s have been withdrawn due to frequent overruns at present. Seems to be a software/ signalling issue.
 

simple simon

Member
Joined
13 Feb 2011
Messages
728
Location
Suburban London
Supposedly the B23s have been withdrawn due to frequent overruns at present. Seems to be a software/ signalling issue.
That reminds me what was said (ie: rumour, 'hearsay') to have happened when testing of the new trains first began. It was never officially stated however that this was happening.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,397
Location
Hertfordshire / Teesdale
What sections realistically allow a full 80kph? I am assuming that would likely only be achieved when running late. I know SelTrac on the District line will set slower maximum speeds when the train is running to time, and will uplift the maximum in places to aid service recovery.
The braking curve does seem almost too slow, are these units too light footed or is it simply to make best use of the regenerative capability?

It’s a bit of a myth that Seltrac “speeds up” when late. What it does is impose a velocity ceiling if the system calculates that the train will arrive significantly early at the next station. So it all depends on how much slack there is in the timetabled run times versus reality.

If you take something like the Northern Line, most of the time the train runs at full speed. There’s a handful of sections where you’re more likely to see slower running, but in general it’s fairly rare. Where you’re most likely to see it is if you have a driver who is very quick with the station dwell times and has the doors closed ready to move as soon as the target point advances, or at very quiet times of day again where dwells are short.

There is no uplifting to aid recovery. The speed profile is exactly the same for an on time train as it is for a late one.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,292
It’s a bit of a myth that Seltrac “speeds up” when late. What it does is impose a velocity ceiling if the system calculates that the train will arrive significantly early at the next station. So it all depends on how much slack there is in the timetabled run times versus reality.

If you take something like the Northern Line, most of the time the train runs at full speed. There’s a handful of sections where you’re more likely to see slower running, but in general it’s fairly rare. Where you’re most likely to see it is if you have a driver who is very quick with the station dwell times and has the doors closed ready to move as soon as the target point advances, or at very quiet times of day again where dwells are short.

There is no uplifting to aid recovery. The speed profile is exactly the same for an on time train as it is for a late one.
How interesting, thanks for explaining
 

Mattplans

Member
Joined
27 Sep 2024
Messages
715
Location
London, UK
Was travelling today and overheard the PSA talking to a colleague. Supposedly the B23s have been withdrawn due to frequent overruns at present. Seems to be a software/ signalling issue.

On an older train this morning that overran! Is this a common issue at all - never had it happen before?
 

Mattplans

Member
Joined
27 Sep 2024
Messages
715
Location
London, UK
Out of interest, what time was that and at which station?
This was at Deptford Bridge around 7:10 am. The train was being operated from the front though, and a loud noise sounded and the panel was lit red next to "I" on their dispatch panel. The operator reversed the train from the front into the correct stopping pos and the journey continued without issue, at least until I got off at Canary Wharf.
 

DGP

Member
Joined
31 Mar 2024
Messages
123
Location
London
This was at Deptford Bridge around 7:10 am. The train was being operated from the front though, and a loud noise sounded and the panel was lit red next to "I" on their dispatch panel. The operator reversed the train from the front into the correct stopping pos and the journey continued without issue, at least until I got off at Canary Wharf.
I did a few journeys on the DLR yesterday and all were being operated from the front. Maybe a bigger issue of which the overrunning was a symptom of?
 

Mattplans

Member
Joined
27 Sep 2024
Messages
715
Location
London, UK
I did a few journeys on the DLR yesterday and all were being operated from the front. Maybe a bigger issue of which the overrunning was a symptom of?
Interesting, all of my recent journeys on the DLR have been operated from the front. But this isn’t uncommon at all at late times presumably operators have been on their feet all day. Even at any given time it’s not uncommon to see trains being operated from the front. Did you look at other passing trains to see if they too were being operated from the front?
 

tom1996

Member
Joined
9 Mar 2015
Messages
17
Strange, I was on a B09 train at Bow Church on Tuesday and the train over ran (even though only 2 car so still well within the platform) and made a loud noise and the dispatcher had to re position but he was in the rear unit
 

Mattplans

Member
Joined
27 Sep 2024
Messages
715
Location
London, UK
Strange, I was on a B09 train at Bow Church on Tuesday and the train over ran (even though only 2 car so still well within the platform) and made a loud noise and the dispatcher had to re position but he was in the rear unit
This is exactly what happened to me at Deptford Bridge. Wonder what’s going on. In my situation, the dispatcher was driving from the front and was able to reverse it from the front panel. Surprised that is allowed. Interesting the B23s were at one point withdrawn for overrunning when it seems it might be a network-wide issue.
 

Bungle73

On Moderation
Joined
19 Aug 2011
Messages
3,216
Location
Kent
The new trains have been withdrawn.

How was this not picked up in testing??
 

Mattplans

Member
Joined
27 Sep 2024
Messages
715
Location
London, UK
TfL denied it was embarrassing and did not say when the new trains will be fixed but has apologised.
Perhaps a bit of embarassment is due here, the trains were about 18 months late into passenger service accruing an extra expense to the taxpayer when TFL had to pay extra to store them overseas (is this still happening?) as they had no depot space here in London....

Now it seems they didn't even last a full month in revenue earning service.

What's interesting is that in this thread experiences of overrunning have been recounted that did not occur on the new trains. I wonder if somehow concessions made in the network/engineering to allow these new trains to be seamlessly integrated is causing issues to the rest of the fleet? Or perhaps it's just a result of an aging signalling system and aging fleet.

Either way the passenger is set for more weekend closures and no new trains.
 

Thirteen

Established Member
Joined
3 Oct 2021
Messages
1,899
Location
London
I assume they'll be back in service ASAP once they've identified the issue.

Will be interesting to see which train had the issue because 209 seemed fine when I was on it a few weeks back.
 

Thirteen

Established Member
Joined
3 Oct 2021
Messages
1,899
Location
London
I don't assume anything when we are talking about introducing any new rolling stock nowadays, just look at class 701 or 810...
TfL can't exactly scrap the B23s just because this one issue especially with the B92s on their last legs.
 

Bayum

Established Member
Joined
21 Mar 2008
Messages
3,297
Location
Leeds
Supposedly, one of the vehicles overshot a platform and being withdrawn for investigation as a result
 

DLRnotDave

Member
Joined
12 Aug 2020
Messages
35
Location
London
What's interesting is that in this thread experiences of overrunning have been recounted that did not occur on the new trains. I wonder if somehow concessions made in the network/engineering to allow these new trains to be seamlessly integrated is causing issues to the rest of the fleet? Or perhaps it's just a result of an aging signalling system and aging fleet.
Slight overruns (stop shorts are actually more common) and emergency brake applications are relatively normal during low adhesion on the old trains, it's just a quirk of Sel-Trac.
The B23 incident sounds like it highlighted an issue with the train/s itself.

FWIW I don't think they'll be back in service before Christmas
 

Geogregor

Member
Joined
16 Sep 2016
Messages
458
Location
London
TfL can't exactly scrap the B23s just because this one issue especially with the B92s on their last legs.

Of course they can't scrap them but god knows how long will take them to sort out the issue. Let's just say that the whole process up to date doesn't fill me with the confidence of quick resolution.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,297
Slight overruns (stop shorts are actually more common) and emergency brake applications are relatively normal during low adhesion on the old trains, it's just a quirk of Sel-Trac.
The B23 incident sounds like it highlighted an issue with the train/s itself.

FWIW I don't think they'll be back in service before Christmas
I've actually used the DLR constantly since the day it opened and have never experienced any overrun/underrun, so can't accept "relatively normal".

Bear in mind the new trains are "B23" because they were ordered to go into service in 2023. In a few weeks time it's going to be 2026, and there still seem significant issues preventing the new trains operating. Any cost "saving" by going to a different builder instead of the established one for the previous trains, who had all the knowledge of DLR train/track/signal interface, must have been long since lost. I still believe the current team don't understand the issues and are groping their way along.

BBC article here:

 

DGP

Member
Joined
31 Mar 2024
Messages
123
Location
London
I've actually used the DLR constantly since the day it opened and have never experienced any overrun/underrun, so can't accept "relatively normal".

Bear in mind the new trains are "B23" because they were ordered to go into service in 2023. In a few weeks time it's going to be 2026, and there still seem significant issues preventing the new trains operating. Any cost "saving" by going to a different builder instead of the established one for the previous trains, who had all the knowledge of DLR train/track/signal interface, must have been long since lost. I still believe the current team don't understand the issues and are groping their way along.

BBC article here:


I'm also a regular DLR user since I moved to Docklands 27 years ago and I have experienced only a couple of overruns in that time so I can understand what you mean and that you can't equate "normal" with "frequent". However I equate "normal" with a situation which has been anticipated and can be dealt with as part of the day-to-day routine, for which operators have been trained for and doesn't require attention from engineers or other support staff or shutting down the railway.
 

Top