Lumo Expansion - FirstGroup make further applications

Status
Not open for further replies.

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,704
Strictly there were some testing / driver training paths in for 805 + 807 and some of the differential speed limits hadn't been implemented at the time of previous application.

Unless those paths have disappeared into thin air, then unless anyone can explain what has replaced them, presumably a smidge of extra capacity now exists.
Capacity is largely irrelevant in this, it will still be performance. Those driver training paths were never WTT and likely treated as non-permanent so the shorter term risk was acceptable. The timetable has the differential limits factored in, hence why 80x lose time currently.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

YorkRailFan

Established Member
Joined
6 Sep 2023
Messages
3,361
Location
York
So First has acquired the rights to Grand Union's Cardiff-Edinburgh proposal that they dropped in April then? This seems like an identical application apart from terminating in York instead of Edinburgh or have I missed something?
 
Joined
2 Feb 2019
Messages
1,039
The line in the press release, "Stirling has a large catchment area, with an estimated three million people living within an hour's drive" really tells you everything you need to know. It does a bit seem like they're clutching at straws.
Indeed that is close to the entire population of the Central Belt of Scotland most of whom are far more likely to use Edinburgh or Glasgow.
 

FGWHST43009

Member
Joined
3 Nov 2020
Messages
255
So First has acquired the rights to Grand Union's Cardiff-Edinburgh proposal that they dropped in April then? This seems like an identical application apart from terminating in York instead of Edinburgh or have I missed something?
Fairly similar in terms of overall route barring not extending to Edinburgh. However this new service seems to use quite a different way of working, being more of a interregional service as opposed to a limited-stop service which was what the previous proposal was intending.
 

YorkRailFan

Established Member
Joined
6 Sep 2023
Messages
3,361
Location
York
Fairly similar in terms of overall route barring not extending to Edinburgh. However this new service seems to use quite a different way of working, being more of a interregional service as opposed to a limited-stop service which was what the previous proposal was intending.
Wonder how it will do with the abstraction test then.
Indeed that is close to the entire population of the Central Belt of Scotland most of whom are far more likely to use Edinburgh or Glasgow.
It's a no-brainer really, a far more frequent Service from Edinburgh or Glasgow.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,164
Location
West Wiltshire
Indeed that is close to the entire population of the Central Belt of Scotland most of whom are far more likely to use Edinburgh or Glasgow.
I agree, but there are station stops in Glasgow suburbs, and of course not everyone lives near the city centre stations.

As for Stirling being a railhead for visiting Scotland, there had to be a reason for Stirling being a motorrail terminus 40-50 years ago.
 
Joined
2 Feb 2019
Messages
1,039
The Rochdale doesn't stand a chance. The Cardiff York will be trying to get the paths XC aren't using on the Reading Newcastle.
I am baffled as to why First Group think it is a good idea to submit another application for services from Rochdale to London Euston on the West Coast Mainline. In their rejection of the three open access applications for the West Coast Mainline earlier this year the Office of Rail and Road were totally clear that there is no capacity for any such services and the three applications were rejected specifically for this reason.

It should be clear to everyone that there is no prospect whatsoever of the Office of Rail and Road approving any further applications to operate any new open access train services on the West Coast Mainline to London Euston until High Speed Two is open and takes some of the long distance high speed trains off the West Coast Mainline.

By submitting another such application First Group run the risk of their open access applications no longer being taken seriously and being considered frivolous.
 

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,701
Location
Selby
As for Stirling being a railhead for visiting Scotland, there had to be a reason for Stirling being a motorrail terminus 40-50 years ago.
Sure, if you are wanting to visit the Highlands and Islands then Stirling makes a lot of sense as a Motorail terminal, you can drive off the train and onto main roads heading north, north-east or north-west, giving you easy access to everywhere beyond the central belt from one station. But that only works when you've got a car. If you're looking at taking tourists up to Scotland by train without their car then you need to take them to the places they want to go to. And while Stirling is a pleasant place to visit for a day or so, it's unlikely to be a big draw for tourists – nothing like the big cities of Glasgow or Edinburgh, and not much better for the Highlands and Islands than taking people to one of those two for an onward connection.
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,614
Proposed stopping pattern is
Cardiff Central, Newport, Severn Tunnel Junction, Chepstow, Gloucester,
Cheltenham Spa, Worcestershire Parkway, Bromsgrove, Birmingham New
Street, Tamworth, Derby, Chesterfield, Sheffield, Doncaster, York.

Though Cheltenham, Worcestershire Pkwy, Bromsgrove, Tamworth and Chesterfield are not necessarily to be called at by all services.

Given their experience with Sheffield applications on behalf of Hull Trains I would have thought First would have understood how busy the place is. Especially when there is presumably significant political capital to be gained by avoiding Sheffield and calling at Rotherham Central instead.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,313
Location
Glasgow
Given their experience with Sheffield applications on behalf of Hull Trains I would have thought First would have understood how busy the place is. Especially when there is presumably significant political capital to be gained by avoiding Sheffield and calling at Rotherham Central instead.
Perhaps if this application is refused on abstraction grounds (as opposed to capacity), they'll try again with a modified stopping pattern that may attempt something along those lines.
 

FGWHST43009

Member
Joined
3 Nov 2020
Messages
255
Perhaps if this application is refused on abstraction grounds (as opposed to capacity), they'll try again with a modified stopping pattern that may attempt something along those lines.
Probably likely to happen. With the stopping pattern they're proposing they will almost certainly run into the same problems that the current XC franchise has, with a mix of long-distance and short hop passengers, leading to overcrowding and putting yourself back in square one. If Lumo get their hands on more vehicles they could lengthen the 222s to 7 or 8 car but I don't know if there are any other operators who have earmarked the rest of the 222s. If they focus on long-distance and go for limited-stop, they make be less likely to fail abstraction, especially if they skip Tamworth and Chesterfield.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,568
Location
"Marston Vale mafia"
Probably likely to happen. With the stopping pattern they're proposing they will almost certainly run into the same problems that the current XC franchise has, with a mix of long-distance and short hop passengers, leading to overcrowding and putting yourself back in square one. If Lumo get their hands on more vehicles they could lengthen the 222s to 7 or 8 car but I don't know if there are any other operators who have earmarked the rest of the 222s. If they focus on long-distance and go for limited-stop, they make be less likely to fail abstraction, especially if they skip Tamworth and Chesterfield.

Nothing of course stopping them as a private operation avoiding overcrowding by making reservation actually compulsory as per e.g. the Caledonian Sleeper. They already promote it as such including on station displays (unlike LNER where they change it to recommended on station displays).
 

FGWHST43009

Member
Joined
3 Nov 2020
Messages
255
Nothing of course stopping them as a private operation avoiding overcrowding by making reservation actually compulsory as per e.g. the Caledonian Sleeper. They already promote it as such including on station displays (unlike LNER where they change it to recommended on station displays).
That could probably work, although you might still end up with people jumping on for short hops then standing for the journey. That said, if the trains will be fully standard class that will be a welcome capacity boost over XC with only 3 standard coaches on a 220. They could go for an unreserved coach.
 

The Pelican

Member
Joined
3 Oct 2025
Messages
416
Location
London
I agree, but there are station stops in Glasgow suburbs, and of course not everyone lives near the city centre stations.

As for Stirling being a railhead for visiting Scotland, there had to be a reason for Stirling being a motorrail terminus 40-50 years ago.
I've always assumed Stirling is because it's the nearest big station after using the Motherwell Cumbernauld line, connecting the lines South East of Glasgow to the main routes North of it. Historic Scottish railway geography means that Edinburgh has a single main station a train can run through from the ECML or reverse in from the WCML, but Glasgow has terminals facing North or South. Unfortunately, that means a train from London finds it hard to serve both Glasgow and other places in Scotland. (there was a WCML train that ran from London to Ayr, south east of Glasgow, but there's not much beyond Ayr).

Now reopening St Enoch as a four platform small terminus for trains running from South to North or vice versa- that's the kind of Chiltern Evergreen style private operator infrastructure project which would really improve the network in the long term...
 

lachlan

Member
Joined
11 Aug 2019
Messages
1,171
Sure, if you are wanting to visit the Highlands and Islands then Stirling makes a lot of sense as a Motorail terminal, you can drive off the train and onto main roads heading north, north-east or north-west, giving you easy access to everywhere beyond the central belt from one station. But that only works when you've got a car. If you're looking at taking tourists up to Scotland by train without their car then you need to take them to the places they want to go to. And while Stirling is a pleasant place to visit for a day or so, it's unlikely to be a big draw for tourists – nothing like the big cities of Glasgow or Edinburgh, and not much better for the Highlands and Islands than taking people to one of those two for an onward connection.
Initially I thought this new route could be a speedier connection to Stirling and connecting services, but looking at the timetable the proposal is slower than taking ScotRail and LNER.
 

Peterthegreat

Established Member
Joined
22 Feb 2021
Messages
1,799
Location
South Yorkshire
Given their experience with Sheffield applications on behalf of Hull Trains I would have thought First would have understood how busy the place is. Especially when there is presumably significant political capital to be gained by avoiding Sheffield and calling at Rotherham Central instead.
You can't avoid Sheffield AND stop at Rotherham Central.
 

Charlie978

Member
Joined
31 Jul 2025
Messages
67
Location
Chesterfield
Given their experience with Sheffield applications on behalf of Hull Trains I would have thought First would have understood how busy the place is. Especially when there is presumably significant political capital to be gained by avoiding Sheffield and calling at Rotherham Central instead.
Unfortunately that isn’t possible with the current junctions at Rotherham.

The Sheffield avoiding line (via Beighton) feeds onto the mainline just after Holmes junction which is where the Rotherham Central lines diverge off. They actually cross over at that point but there isn’t access between the 2.

If Masborough was to reopen as it’s often discussed on here and in local circles, then it would be able to call there. But that certainly would be longer term than this application process.
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,614
You can't avoid Sheffield AND stop at Rotherham Central.

Unfortunately that isn’t possible with the current junctions at Rotherham.

The Sheffield avoiding line (via Beighton) feeds onto the mainline just after Holmes junction which is where the Rotherham Central lines diverge off. They actually cross over at that point but there isn’t access between the 2.

If Masborough was to reopen as it’s often discussed on here and in local circles, then it would be able to call there. But that certainly would be longer term than this application process.

Clearly I had a bit of a moment there, I meant Rotherham Gateway.

SYMCA have late 2030 in mind, and given that Stirling is still 2027, it doesn't seem unreasonable to me to think a cross country Lumo and the station opening might coincide. Of course it does no harm to have local politicians and press on side.
 
Joined
2 Feb 2019
Messages
1,039
Meanwhile still no sign of the prposed LNR manchester extensions on the ORR website? Is there any update on this?
The information on the London North Western Railway website has changed to the following proposal for an hourly service Manchester Airport-Crewe-Birmingham New Street also serving the new stations at Darlaston and Willenhall.

Previously they proposed extending the hourly London Euston-Crewe service to Manchester Victoria and extending the hourly Stafford-Stoke-Crewe service to Manchester Airport. Looks like they have dropped the former and changed the latter to extending the hourly Stafford-Stoke-Crewe service North to Manchester Airport and South to Birmingham New Street.

The comment about the better use of the existing southbound train that is currently a stopping service only as far as Crewe is a bit odd as this can only refer to the hourly Northern stopping train service from Manchester Piccadilly to Crewe via Manchester Airport. Surely they do not expect Northern to stop running this service and hand them the path?

The website claims that they will submit detailed proposals to the ORR in the second half of 2025. However, they just seem to be throwing up anything they can think of which could enable them to claim that they will operate a train service to Manchester.

My current guess is there will be no application to the ORR and 'Destination Manchester' will disappear from their website when they are taken over by the Government on 1 February 2026. I do not expect any application from London North Western Railway to join the latest applications from First Group Lumo on the ORR website.

Destination Manchester
As a progressive rail operator, we’re always looking to develop our services and timetables to provide a better travelling experience for our customers. We are ambitious and our team seek innovative solutions to create new journey opportunities.
That's why we have developed proposals for our trains to begin serving Manchester Airport for the first time. The plans would provide direct connectivity between the West Midlands and Manchester Airport, including new stations at Darlaston and Willenhall.
The plan will deliver:
An hourly Manchester Airport to Crewe service, calling at Styal and Wilmslow and continuing from Crewe to Birmingham New Street.
Direct connectivity between Manchester Airport to more destinations including Stoke on Trent and Stafford, as well as Willenhall, Darlaston and Birmingham without the need to take up additional network capacity.
Better use of the existing southbound train that is currently a stopping service only as far as Crewe where passengers need to interchange for other destinations.
A great alternative to private car and an affordable new rail option.
What happens next?
We will submit our detailed proposals to the Office for Rail and Road for consideration in the second half of 2025. In the meantime we are working closely with other train operators, Network Rail and partners in the Manchester area to iron out the finer details of the proposal. If approval is granted we would plan to begin running trains from December 2026.
 
Last edited:

43074

Established Member
Joined
10 Oct 2012
Messages
2,253
The comment about the better use of the existing southbound train that is currently a stopping service only as far as Crewe is a bit odd as this can only refer to the hourly Northern stopping train service from Manchester Piccadilly to Crewe via Manchester Airport. Surely they do not expect Northern to stop running this service and hand them the path?
There is a short news piece in the current Modern Railways where the WMT MD "reiterates" they still plan to run to Manchester Airport, and that it's "complicated" so it's quite plausible that remapping the Northern Crewe to Manchester Airport path to WMT is still an option.
My current guess is there will be no application to the ORR and 'Destination Manchester' will disappear from their website when they are taken over by the Government on 1 February 2026. I do not expect any application from London North Western Railway to join the latest applications from First Group Lumo on the ORR website.
What evidence do you have for this claim?
 
Joined
2 Feb 2019
Messages
1,039
What evidence do you have for this claim?
I stated that it is my current guess. I do not know their intentions. However the plans published on their website changed, there has been no application so far to the ORR, the plans published on their website indicate the proposed service may be dependent on taking over a service run by another Government run operator and they will be taken over by the Government on 1 February 2026.

== Doublepost prevention - post automatically merged: ==

There is a short news piece in the current Modern Railways where the WMT MD "reiterates" they still plan to run to Manchester Airport, and that it's "complicated" so it's quite plausible that remapping the Northern Crewe to Manchester Airport path to WMT is still an option.
I have not seen any news about discussions between WMT and Northern. All the news about this proposal so far is from WMT. We shall see in the next three months whether there is any more news about this or if the proposal is just dropped.

Clearly finding paths for any new train services in and around Manchester is complicated and this is another reason I cannot see the new open access Rochdale application from Lumo First Group going anywhere.
 
Last edited:

Killingworth

Established Member
Joined
30 May 2018
Messages
6,483
Location
Sheffield
Given their experience with Sheffield applications on behalf of Hull Trains I would have thought First would have understood how busy the place is. Especially when there is presumably significant political capital to be gained by avoiding Sheffield and calling at Rotherham Central instead.
LSL specials usually pick up at Chesterfield and Swinton to avoid running through Sheffield!
 

MikePJ

Member
Joined
10 Dec 2015
Messages
1,016
Interesting choice, I thought they'd go for fewer stops to provide a faster Cardiff-Birmingham service. Would be interesting to see if that gets past the abstraction tests. Also I find it interesting that the application mentions reducing journey times to 4:30 when it's possible to do it quicker changing at Bristol Parkway. Going via Bristol Parkway and not calling at Gloucester, Bromsgrove, Tamworth and Chesterfield could reduce journey times to 3:45-3:50.
I went from Leeds to Cardiff recently via the direct XC train that comes from Edinburgh, and was surprised to find that it wasn't quicker than changing at Bristol Parkway! This Lumo service will definitely be a slow service to the Midlands from Cardiff - but perhaps that'll get it through the ORR, as CrossCountry will be able to sell a faster one. Also worth noting that XC stop at University rather than Bromsgrove.
 

TheGrew

Member
Joined
31 Jul 2012
Messages
514
It's a shame that LNR doesn't appear to want to go via WBQ. I genuinely think there is some non-abstractive potential of the Lumo proposals, but I appreciate the pathing challenges that I felt the LNR proposal addressed in part by being an extension. In my experience, WBQ-Euston fast services are well loaded. Newton-le-Willows (where I live, so I am biased) is also a popular railhead. Eccles does genuinely serve western Greater Manchester well, including MediaCity, which currently has quite long travel times to Piccadilly. Whilst I appreciate that Victoria will have some abstraction on the Manchester->London market, there are also some destinations served from only there and not Piccadilly, which would become a single change away from London without having to trapse across Manchester either on foot or Metrolink.
 

SeanM1997

Member
Joined
2 Feb 2016
Messages
572
There is a short news piece in the current Modern Railways where the WMT MD "reiterates" they still plan to run to Manchester Airport, and that it's "complicated" so it's quite plausible that remapping the Northern Crewe to Manchester Airport path to WMT is still an option.

What evidence do you have for this claim?
Not sure if we need a new thread to move WMT conversation there?

In the interim, the Bee Network is wanting to run their own services between Manchester Airport and Manchester Piccadilly from 2028, so breaking the Crewe - Manchester Airport - Manchester Piccadilly service in two could allow this to happen. However, this would lead to less connectivity on the Heald Green/Didsbury branch heading south where passengers may prefer to change at Wilmslow/Crewe to head to London/Birmingham; and would mean significant changes to the Northern Crewe operations as the two services switch routes at Crewe.

It is good to see Stoke-Birmingham return as will relieve pressure on CrossCountry. Will be interesting if Avanti Scotland-Birmingham-London service still calls at Stafford as that stop was only added to Avanti when WMT dropped the extension to ensure CrossCountry didn't get overcrowded.

Personally, I hope Northern maintain two trains an hour to Crewe and WMT is an addition, boosting Crewe's connectivity and status as an interchange
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,651
Previously they proposed extending the hourly London Euston-Crewe service to Manchester Victoria and extending the hourly Stafford-Stoke-Crewe service to Manchester Airport. Looks like they have dropped the former and changed the latter to extending the hourly Stafford-Stoke-Crewe service North to Manchester Airport and South to Birmingham New Street.

I saw this. It's quite an interesting regional service, and I would think that many in the North of Birmingham / inner Staffs area would appreciate a direct link to Manchester Airport (plus all the connections of Crewe, and fast connects to Manchester without going to BNS) - and serving new stations, it opens up a lot of possibilities. Presumably Tame Bridge Parkway too on the way to New St.

Do we think it would avoid, or go via Wolverhampton, on the way to Stafford?
 