D365
Veteran Member
- Joined
- 29 Jun 2012
- Messages
- 13,194
… for what purpose? Porterbrook is financing the Class 897s anyway.350/2 anyone, plenty will be available
… for what purpose? Porterbrook is financing the Class 897s anyway.350/2 anyone, plenty will be available
As a temporary stopgap if the 91s go before the 897s arrive?… for what purpose? Porterbrook is financing the Class 897s anyway.
Sounds comfy to meThey have eight which are either demic or have no seats, or both.
What sort of service would you run with that lot?!
Sounds like more standing room than XC haveSounds comfy to me![]()
Literally WHO . . . was talking about a 180, what even is that.. Obviously I'm talking about the intercity 225. They need a replacement THIS YEAR, ASAP.The IC225/91s or the 180s? Either way there’s nothing to replace them this year so there’ll be a lot of angry passengers stuck on platforms without a train to catch if you get your wish.
if a train's genuinely uncomfortable, outdated, or unreliable, the argument shouldn’t be “what replaces it?” but rather “why is it still running?” even if a full replacement isn’t available this second, i don’t think that means we should just settle for sub-par trains. that mindset is how things stay outdated . .In ref to the 91s? Even if they are awful replaced with what?
The December 2025 timetable is designed around the retention of IC225 sets. So no, that’s not happening.Literally WHO . . . was talking about a 180, what even is that.. Obviously I'm talking about the intercity 225. They need a replacement THIS YEAR, ASAP.
The choice right now is a 225 or no train at all.Literally WHO . . . was talking about a 180, what even is that.. Obviously I'm talking about the intercity 225. They need a replacement THIS YEAR, ASAP.
== Doublepost prevention - post automatically merged: ==
Is anyone else using these words about the 225 or do you have a personal hatred of them?if a train's genuinely uncomfortable, outdated, or unreliable, the argument shouldn’t be “what replaces it?” but rather “why is it still running?” even if a full replacement isn’t available this second, i don’t think that means we should just settle for sub-par trains. that mindset is how things stay outdated . .
More legroom in Standard - so yes.Does anybody really think the Azumas are better than the 225's, passenger wise? Really?
Literally WHO . . . was talking about a 180, what even is that.. Obviously I'm talking about the intercity 225. They need a replacement THIS YEAR, ASAP.
== Doublepost prevention - post automatically merged: ==
if a train's genuinely uncomfortable, outdated, or unreliable, the argument shouldn’t be “what replaces it?” but rather “why is it still running?” even if a full replacement isn’t available this second, i don’t think that means we should just settle for sub-par trains. that mindset is how things stay outdated . .
LNER had many diversions on the 11th/12th Oct running up and down the Durham Coastline in various formations.I wasn't saying the class 801's diesel engine couldn't physically move the train. It's just that, if the train is unable to get power from the OHLE while running on an electrified route, I'd have thought at least one of the following would be true in the vast majority of cases:
- a power outage in the OHLE is stopping an EMU (without self-rescue capability) ahead from moving, meaning the following signal is at danger and following trains (with diesel backup generators) can't proceed beyond that signal
- a power outage is impacting not just the OHLE but signalling as well, so no signals are lit - in such a situation isn't the driver supposed to assume the signal is at danger?
- the OHLE has come down and is blocking the line and/or is tangled around a train, preventing that train (and following trains) from moving beyond the next signal
Not just other countries; I don't think (m)any of the suburban and regional electric units on the GB network share the class 801's peculiar ability to move themselves if the external power supply fails, but not fast enough to run normal services on unelectrified routes. Electrostars, for example, can't do that as far as I know.
I think I read somewhere that they can divert via the Newcastle-Carlisle route with a 10-car formed of an 800/2 in multiple with an 801/1 if the ECML is shut north of Newcastle.
Agreed; I did imply that. What's more, I did so intentionally; because in some respects, the inclusion of diesel generator on the class 801s is a backwards step compared to the IC225s. The diesel generator certainly brings some benefits, but it also has its drawbacks.
In my earlier post, my sentence began with the words "An electric railway is a better railway," a phrase which (followed by "however you define better") was often used in Modern Railways campaign for more electrification. The class 801 is (in terms of technical complexity and maintenance requirements) actually a bi-mode, not an EMU. You still have the weight of a diesel engine and fuel to consider as well, so it is not as weight-efficient as a pure-electric train. You make a good point that pure-electric trains do have one drawback, that of a loss of 'hotel power' in certain categories of disruption, but the 'solution' to this comes at the cost of some of the benefits of electrification. Both approaches have their pros and cons.
CAF certainly were advertising at least bi-mode on their website, with an Australian Civity bi-mode order having been placed some years ago. What I didn't know, until LNER ordered the 897s, was whether CAF offered multi-mode units in the Civity UK platform to fit our loading guage (if they can, as I've been saying since at least 2018 probably, the class 195s, 196s, and 197s should have been at least bi-mode).
LNER had many diversions on the 11th/12th Oct running up and down the Durham Coastline in various formations.
225's likely to be here for a couple of years at least given the build programme of the new CAF units.Literally WHO . . . was talking about a 180, what even is that.. Obviously I'm talking about the intercity 225. They need a replacement THIS YEAR, ASAP.
== Doublepost prevention - post automatically merged: ==
if a train's genuinely uncomfortable, outdated, or unreliable, the argument shouldn’t be “what replaces it?” but rather “why is it still running?” even if a full replacement isn’t available this second, i don’t think that means we should just settle for sub-par trains. that mindset is how things stay outdated . .
I’m not sure tbh, I guess that would have to happen at Northallerton if they do, I’ve only ever seen them run non stop through Teesside.Do they have to tie the pantographs down on the 80x like they used to with the 91s (due to running under the metro wiring)?
FrontSideBus for one, in Post #100 on this topic.Literally WHO . . . was talking about a 180
Why? What's wrong with them?Obviously I'm talking about the intercity 225. They need a replacement THIS YEAR, ASAP.
Any extra legroom on the Azumas is presumably down to thinner (and therefore harder) seats though isn't it? If so, then just as many people are going to find the Azumas less-comfortable than a mark 4 (and vice-versa). However, all this is details of interior fit-out, rip the interior out and put a higher-spec one in and either design could probably be made comfortable for whoever chooses the new seats etc. If you ask me, I would say that:More legroom in Standard - so yes.Does anybody really think the Azumas are better than the 225's, passenger wise? Really?
Claustrophobia in First - so no.
I'm with bramling here; other than perhaps the 'wasted space' in the DVT I cannot see why anyone would consider the IC225s sub-par compared to newer trains. If anything, the trend here in GB seems to be that newer trains are more-likely to be sub-par than older ones. Indeed, unless you're happy with a throw-away culture that scraps equipment which required a significant amount of energy to make at the first sign of trouble rather than keeping it going as long as reasonably practical, I'd suggest that having some older stock around can be a useful asset, as it gives you something which is closer to life-expiry and therefore can be replaced sooner with new stock that can take advantage of any new innovation.I’m not sure the IC225s meet any of those three conditions, though personal preference might say some people find them uncomfortable I don’t think it’s fair to say that this applies to them any more than any other type of train (in fact quite possibly the opposite applies).if a train's genuinely uncomfortable, outdated, or unreliable, the argument shouldn’t be “what replaces it?” but rather “why is it still running?” even if a full replacement isn’t available this second, i don’t think that means we should just settle for sub-par trains. that mindset is how things stay outdated . .
Until at least 2029, so at least 4 years.225's likely to be here for a couple of years at least given the build programme of the new CAF units.
No, they do not have to tie the pantographs down.Do they have to tie the pantographs down on the 80x like they used to with the 91s (due to running under the metro wiring)?
89001 could do the job.Even if they had to withdraw the 91's before the Mk4's, realistically there is no locomotive in the UK that could replace them? 90's can't match the top speed and 67's, apart from being diesel, are too slow accelerating?
89001 could do the job.
As demonstrated by Transport for Wales also, the Class 67s require modifications to actually work with the MK4 coaches alone instead of the 91 and haven't proved to be the most reliable of the lot either. For example, 67016 ran into trouble today.Even if they had to withdraw the 91's before the Mk4's, realistically there is no locomotive in the UK that could replace them? 90's can't match the top speed and 67's, apart from being diesel, are too slow accelerating?
As demonstrated by Transport for Wales also, the Class 67s require modifications to actually work with the MK4 coaches alone instead of the 91 and haven't proved to be the most reliable of the lot either. For example, 67016 ran into trouble today.
It proved to be very useful in the past to cover for unavailable 91s.One loco wouldn't be a lot of use!
It proved to be very useful in the past to cover for unavailable 91s.
IMO, the fact that we have nothing else that can match the performance of a 91, except EMU's just shows how good they were (and still are).
I hope the 225 Group will obtain a full IC225 set (including 91 and DVT) for railtour use once LNER have fully withdrawn the fleet - together with the class 89 and LSL's 86(s), 87(s) and 90s that would give a nice range of traction options for both the mark 4 set and LSL's mark 3 set(s). Further details of what I'd like to see happen probably not allowed in this topic since it's not in the 'speculation' section.It would be great if they could acquire a rake of Mk4's for Avocet to do railtours with.
IMO, the fact that we have nothing else that can match the performance of a 91, except EMU's just shows how good they were (and still are). Too bad they couldn't be refit with modern components but I suppose all good things must come to and end.
The class 67's fuel range isn't too good either - partially illustrated by the very limited offering of TfW Mk4 services to/from Swansea.As demonstrated by Transport for Wales also, the Class 67s require modifications to actually work with the MK4 coaches alone instead of the 91 and haven't proved to be the most reliable of the lot either. For example, 67016 ran into trouble today.
Absolutely, I checked 67020's fuel gauge at Cardiff Central on Saturday after it had down Swansea to Manchester, Manchester to Cardiff and it was already on about half a tank. Not great and wouldn't be a very suitable locomotive to run the ECML with those circumstances!The class 67's fuel range isn't too good either - partially illustrated by the very limited offering of TfW Mk4 services to/from Swansea.
The problem is that the Mark 4 has a very limited route clearance, unlike the Mark 3s, where large portions of the network are cleared (more than you might think).I hope the 225 Group will obtain a full IC225 set (including 91 and DVT) for railtour use once LNER have fully withdrawn the fleet - together with the class 89 and LSL's 86(s), 87(s) and 90s that would give a nice range of traction options for both the mark 4 set and LSL's mark 3 set(s). Further details of what I'd like to see happen probably not allowed in this topic since it's not in the 'speculation' section.