MCR247
Established Member
- Joined
- 7 Nov 2008
- Messages
- 10,292
I'm sure you was on about short term...?
Yes, I think of using 90+Mk 3s in the short term, unless East Coast had it's own Pendolinos, therefore 91+Mk 4s could be cascaded & Pendolino sets as a long term use.
unless East Coast had it's own Pendolinos
EC are due to get IEP
I thought that was only to replace HSTs, with (some?) 91s remaining in service too?
For me the answer to the Manchester-Scotland stock is where the route is likely to end up in the Franchise map. I think theres a fairly broad consensus that the route should be in the ICWC franchise.
My hope is that the winning bidder for ICWC electrifies Crewe-Chester and introduces a fleet of 390s (maybe 6 car units) to replace the 221 and operate Manchester-Scotland. This would make the franchise entirely 390 operated (+57 drag), giving economies of scale and standardisation.
Could you imagine what would happen if they discovered a fatigue fault or other problem with the 390's which required them to be taken out of service for modifications though :P
New 350s would then take over Birmingham - Manchester, This could run via Manchester Airport and continue to Scotland, under ICWC using 350s?

Manchester - Scotland I can understand, but Birmingham - Scotland should have stayed XC
Well lots were built.There isn't exactly a million servicable MK3s lying around though?
I thought it was absolutely ludicrous that Birmingham/Manchester-Scotland services were taken away from XC.
Well lots were built.
Rumour has it that Derby would like some more work. Either a refurb contract or a further build of new version of Mark3s perhaps. I'm sure the blueprints are lying around somewhere.
Well lots were built.
Either a refurb contract or a further build of new version of Mark3s perhaps.
Indeed, you couldn't built Mk3 today. The necessary re-design to meet modern crashworthiness standards, fitting of powered doors, retention tank bogs, modern electrics & electronics, blah blah, would render a completely new design. I wager it would be easier and more cost effective to start from scratch.As if you could build more MK3s now:roll:
The problem is that there are only four paths south on XC (two to Reading, two to Bristol), and a lot more potential services to the north (two to Liverpool, two to Manchester, two to the ECML, one up the WCML to Scotland). So any attempt to give Glasgow/Edinburgh or Liverpool a XC service to Bristol/Reading would have to be instead of an established link from Manchester/Newcastle.
So a massive spend on New Street to bring it up to standard - yet still scuppered with pathing.
The XC Bournemouth - Manchester is cut back to Birmingham and then joined with the Birmingham - Scotland
New 350s would then take over Birmingham - Manchester, This could run via Manchester Airport and continue to Scotland, under ICWC using 350s?
Before Glasgow-South West was split up and the Birmingham-South West was tagged on to the Manchester-Birmingham's that didn't continue to Reading, it was suggested that more 350s would be put on Manchester-Birmingham. However, Virgin made it awkward as they refused to take on a small 350 fleet and kicked up a fuss about how London Midland would take their passengers if LM ran the service instead.