• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Great Western (and other TOCs) - nationalisation

Status
Not open for further replies.

northernbelle

Member
Joined
10 Oct 2018
Messages
770
To happen in 2026, alongside GTR, Chiltern and West Midlands - Facebook post this morning from Rail Minister Heidi Alexander:

At Labour Party Conference, I’m announcing the 4 train operating companies to be brought into public ownership next year: Great Western, GTR (including Thameslink and Southern), Chiltern and West Midlands.

This will mean that by the middle of next year over half of all railway journeys will be done on publicly operated railways.

We are returning the railways to the service of passengers, putting an end to the delays, cancellations and waste that have frustrated the travelling public for too long.

My dad was an electrical apprentice on our railway in Swindon, making sure things worked properly.

It seems fitting that 60 years later, I will also be rewiring the railways as we rebuild a transport system fit for the future.

It will take time, but we will sweep away decades of fragmentation and pointless bureaucracy, and deliver a Great British Railway people can be proud of and rely on.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,924
Location
Mold, Clwyd
It seems Heidi Alexander will announce at the Labour party conference next week the dates for the next TOC transfers to DOHL operation.
See 0928 in this blog:
Most rail journeys in Great Britain will be under public ownership by the middle of next year, the transport secretary is expected to announce.
Speaking at the Labour party’s annual party conference, Heidi Alexander will reveal the next four services to be brought into public ownership.

WMT will transfer from Transport UK on 1 Feb 2026 (already announced)
GTR will transfer from Govia (Go-Ahead/Keolis) on 31 May 2026
Chiltern and GWR will transfer (from Arriva and FirstGroup respectively) later in 2026 (specific dates not announced).

That will just leave Avanti, Cross-Country and EMR of the DfT-contracted TOCs in the private sector until 2027.
Merseyrail and TfL-controlled TOCs London Overground and Elizabeth Line remain in the private sector for now (current concessions expire 2026 (LO), 2028 (Merseyrail) and 2032 (EL).
 
Last edited:

physics34

Established Member
Joined
1 Dec 2013
Messages
4,090
Yep as a GTR employee we received an email from our management this morning confirming this.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,641
Location
Hampshire
It is still a little annoying to see the perpetual XC can kicked down that road again. GWR, and to some extent Chiltern, are two of the better TOCs at the moment. The less said about XC the better.
 

paulmch

Member
Joined
20 Dec 2018
Messages
220
It is still a little annoying to see the perpetual XC can kicked down that road again. GWR, and to some extent Chiltern, are two of the better TOCs at the moment. The less said about XC the better.
Unfortunately 2027 is the earliest that XC can be taken in house without Arriva receiving some sort of compensation. I suspect the DfT are happy to put off having to deal with the XC mess directly for as long as possible!
 

KNN

Member
Joined
9 Feb 2024
Messages
296
Location
Birmingham
It is still a little annoying to see the perpetual XC can kicked down that road again. GWR, and to some extent Chiltern, are two of the better TOCs at the moment. The less said about XC the better.
It isn't a punishment this time, though. And a few months either way aren't going to fix the problems at XC, might as well leave them where they are for now.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,168
Location
West Wiltshire
DfT sneeked out a post dated yesterday
  • schedule set out for West Midlands Trains, Govia Thameslink Railway, Chiltern Railways and Great Western Railways to come under public control
  • by the middle of next year, more than half of all rail journeys in Great Britain will be under public ownership
  • the government is delivering on its commitment to bring passenger services under public control and put passengers back at the heart of the railway
The next 3 train operating companies whose services will transfer into public ownership, as part of the government’s landmark overhaul of the railways, have been confirmed.

After Greater Anglia’s services transfer on 12 October 2025, West Midlands Trains services will then follow on 1 February 2026, before Govia Thameslink Railway’s services on 31 May 2026, marking another significant step in the government’s plans to bring services into public ownership.

This means by the middle of next year, 8 in 10 passenger rail journeys that the department is responsible for will be owned by the public, for the public.

Chiltern Railways and Great Western Railways services are then expected to follow, with the Secretary of State of Transport due to make final decisions on when exactly this will happen in due course.

All passenger services operating under contracts with the department are expected to return to public ownership by the end of 2027 and will eventually be integrated into Great British Railways. Services are being transferred after contracts reach the end of their minimum term, ensuring taxpayers pay no additional costs for breaking contracts early.

Operators must meet rigorous, bespoke standards to earn the right to be called Great British Railways, so we can rebuild a world-class public service.

This confirmation builds on the government’s delivery of the biggest reset of the railways in a generation, which will help to deliver better and more reliable services for passengers.

Legislation to establish Great British Railways, the new public company which will take responsibility for the day-to-day operations of the railways, will be introduced this Parliamentary session.

Publicly owned operating companies Southeastern and LNER are delivering some of the lowest cancellation rates nationally and South Western Railway has tripled the number of new trains in service in the four months since it came under public ownership, offering more comfortable journeys.

 

450.emu

Member
Joined
21 May 2015
Messages
287
Rail Minister Heidi Alexander: "It seems fitting that 60 years later, I will also be rewiring the railways..."
She's playing with fire making wild promises about electrification projects :E

Let's see what happens next, there's not even a livery yet, it just seems to be "coming soon" stickers which seems quite amateur :rolleyes:
 

jamieh27

Member
Joined
2 Jan 2023
Messages
668
Location
Falmouth
To happen in 2026, alongside GTR, Chiltern and West Midlands - Facebook post this morning from Rail Minister Heidi Alexander:
Just saw the news so all 14 operating companies by 2026 will be brought into public ownership uner Great British Railways.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,662
Just saw the news so all 14 operating companies by 2026 will be brought into public ownership uner Great British Railways.
Nope. '8 in 10 journeys will be in the public sector' Cross Country and Avanti, at least, still to be given a firm end date.
 

Keithheller

Member
Joined
12 Feb 2019
Messages
16
So we got a transport minister whos dad worked on the railway and a London Mayor whos dad was a bus driver. Must have the same spin doctor and or script writers!
 

Cardiff123

Established Member
Joined
10 Mar 2013
Messages
1,656
Location
South Wales
DfT sneeked out a post dated yesterday


So "we're going to launch GBR but we're not going to let every operator call themselves GBR." :rolleyes:
So private operators are going to still be running TOCs? And what will English operators be called that are not allowed to call themselves GBR?
 

ollyexe2808

Member
Joined
18 Jun 2023
Messages
138
Location
Exeter
So "we're going to launch GBR but we're not going to let every operator call themselves GBR." :rolleyes:
So private operators are going to still be running TOCs? And what will English operators be called that are not allowed to call themselves GBR?

The operators will go into public hands but keep their TOC name (as in LNER, Northern etc). So the TOCs will no longer be private companies, but will keep their names. I think it is silly though to not have GBR as the main brand from Day One.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,293
So "we're going to launch GBR but we're not going to let every operator call themselves GBR." :rolleyes:
So private operators are going to still be running TOCs? And what will English operators be called that are not allowed to call themselves GBR?
Well there’s LNER, SWR, Northern, to give three nationalised examples operated by ‘DfT Operator Ltd’, as explained in a number of similar threads over the last few months…
 

Cardiff123

Established Member
Joined
10 Mar 2013
Messages
1,656
Location
South Wales
Well there’s LNER, SWR, Northern, to give three nationalised examples operated by ‘DfT Operator Ltd’, as explained in a number of similar threads over the last few months…
Yes but that's because GBR doesn't exist as a legal entity yet. What the press release from the DfT and Heidi Alexander is saying is that they won't be calling every operator GBR if they are poorly performing.
So what happens if an operator performs well and so is rebanded as GBR, but then performs poorly? It's loses the GBR brand and is then called something else?
This is leaving out the fact the TfW and ScotRail won't be re-branded as GBR anyway.
When you drill down it all looks like a bit of a poorly thought out mess.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,293
Yes but that's because GBR doesn't exist as a legal entity yet. What the press release from the DfT and Heidi Alexander is saying is that they won't be calling every operator GBR if they are poorly performing.
We already knew about that from the earlier ‘nationalisations’ though. Your question has been asked before, and there was no clear answer to whether a GBR branded TOC could go the other way subsequently.

I’m quite looking forwarded to DFT getting XC staff to work normally at weekends for instance.
 

Hadders

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
27 Apr 2011
Messages
18,151
So we’ve got:
Greater Anglia 12th October
West Midlands Trains 1st February
GTR 31st May

Then:
GWR
Chiltern
Both to follow at a date to be determined by the Secretary of State (presumably later 2026)

Which by my reckoning leaves:
Avanti
CrossCountry
EMR
to transfer in 2027
 

satisnek

Member
Joined
5 Sep 2014
Messages
1,097
Location
Kidderminster/Mercia Marina
Being a Worcestershire rail user for more than 35 years and anti-privatisation for almost as long, I should be over the moon about this. But I have absolutely zero confidence in today's politicians.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,119
It isn't a punishment this time, though. And a few months either way aren't going to fix the problems at XC, might as well leave them where they are for now.
Though where fixes might take a bit longer I would have thought DfT would be keen to set the ball in motion now, so improvements conveniently come very soon after nationalisation.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,350
Though where fixes might take a bit longer I would have thought DfT would be keen to set the ball in motion now, so improvements conveniently come very soon after nationalisation.
There is no evidence from any of the nationalisation phasing yet to suggest that improvements are any more likely before or after nationalisation happens.
 

positron

Member
Joined
18 Oct 2022
Messages
716
Location
Cardiff
So we’ve got:
Greater Anglia 12th October
West Midlands Trains 1st February
GTR 31st May

Then:
GWR
Chiltern
Both to follow at a date to be determined by the Secretary of State (presumably later 2026)

Which by my reckoning leaves:
Avanti
CrossCountry
EMR
to transfer in 2027
EMR core contract expires October 2026, Avantis September 2026 and Cross country October 2027! But their (XC and Avanti tbf) service provision is so shockingly bad they should be able to cancel cross country earlier imo.

The others core contracts have all already expired so it's just a matter of staggering their transfer.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,350
But their service provision is so shockingly bad they should be able to cancel cross country earlier imo.
If they are delivering services to the specification laid down by and agreed with the DfT, there isn't really grounds to cancel a contract.
 

Wilts Wanderer

Established Member
Joined
21 Nov 2016
Messages
3,199
If they are delivering services to the specification laid down by and agreed with the DfT, there isn't really grounds to cancel a contract.

I will be surprised if the DfT specification provides for such an abysmal level of service delivery as CrossCountry achieve day to day, particularly at weekends. Of course, kicking Arriva out early just hastens the problem landing firmly on DfTs plate which is presumably why they haven’t.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,119
There is no evidence from any of the nationalisation phasing yet to suggest that improvements are any more likely before or after nationalisation happens.
I’m not suggesting that. They are all happening as soon as the contracts practically allow.

And clearly the first few have come too quickly after the election for any longer term improvements to be initiated in advance.
 

positron

Member
Joined
18 Oct 2022
Messages
716
Location
Cardiff
Cross country ultimately need more rolling stock and that's not going to materialise so yeah I imagine it's in their interest to delay the transfer as long as possible. Even bent dft and maybe having some more flexibility with rolling stock doesn't help, because there's not really any suitable cascades even.

Wonder if it will help or hinder GWRs plans for their battery tech. That's something they'll need sooner rather than later to get 150s replaced too. Again there's not much diesel stock that isn't also life expired.
 

Clarence Yard

Established Member
Joined
18 Dec 2014
Messages
3,271
All they are doing at this moment is removing the private sector management element. They are still working to the existing DfT business plan for each TOC, irrespective of ownership.

Change of ownership doesn’t mean change of plan.
 

Sorcerer

Established Member
Joined
20 May 2022
Messages
2,117
Location
Liverpool
I expect Merseyrail, London Overground and Elizabeth Line will either remain as concessions or will be brought under control by local bodies rather than the Department for Transport. Considering that the Great British Railways brand will only be applied to operations that the government deems a good enough standard, I am not too surprised they'd prefer to bring Avanti and CrossCountry back in house later down the line. I didn't quite realise just how little TOCs remained privatised though I must admit.
 

positron

Member
Joined
18 Oct 2022
Messages
716
Location
Cardiff
All they are doing at this moment is removing the private sector management element. They are still working to the existing DfT business plan for each TOC, irrespective of ownership.

Change of ownership doesn’t mean change of plan.
That's not quite the whole truth though, both south western and now south eastern have had their management structure changed too so that services and infrastructure are managed by a single entity. That's more than just switching private to public.

== Doublepost prevention - post automatically merged: ==

Cross country they can't actually do until at the earliest October 2027. So they'll be the last ones to transfer.
 
Status
Not open for further replies.

Top