4tph on Gatwick Express is just the same service that was ran anyway before Covid so no upgrades would be needed.
Is the capacity freed up by reducing the Gatwick Express to 2tph from 4tph just left free, or has it been taken by other services?

Given the article talks about the late 2030's for the largest increase in passengers, I guess questions about rolling stock and drivers today are irrelevant for then?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

John R

Established Member
Joined
1 Jul 2013
Messages
6,146
Is the capacity freed up by reducing the Gatwick Express to 2tph from 4tph just left free, or has it been taken by other services?

Given the article talks about the late 2030's for the largest increase in passengers, I guess questions about rolling stock and drivers today are irrelevant for then?
Not really, as the same article says a 15% increase could happen before the runway opens, and 25% once it does. The late 2030s increase is 39%.

Given the usual railway lead time for planning capacity increases, and for any new build rolling stock deemed to be required, I don’t think questions are irrelevant for today.
 

izvor

Member
Joined
11 Jun 2014
Messages
601
Location
on the SER
I suspect a through service connecting Gatwick to Ashford would be popular, Ashford has good connections to a chunk of easternmost East Sussex and most of Kent.
With the North Downs Line, it's difficult to see how improvements could be made without electrification or bi-modes. I wonder how much a fleet of bi modes for the North Downs would cost (partly funded by Gatwick).
I believe an Ashford - Redhill - Guildford - Reading service was part of a SouthEastern franchise spec pre-Covid? Confirmation welcome. It would certainly make use of underutilised rail infrastructure in the east. Doubt 100% electric SE would want to operate it though. And Redhill would probably need remodelling to cope with interchange to/from Gatwick.

Alternatively a new Edenbridge - Gatwick - Dorking by-pass line (avoiding the "Redhill reverse") has been mooted in the past. I can't see any UK government financing this, but if it were made a condition of Gatwick expansion I think it would be a winner, stimulating cross-regional traffic avoiding London and modal shift away from the M25. And releasing the 2tph GWR paths on the Brighton main line.

Thameslink struggle to run the existing service, especially at weekends.
An understatement!
 

stadler

Established Member
Joined
5 Jun 2023
Messages
3,304
Location
Horsley
What i would do is simply change the Gatwick Express to operate like the Luton Express service. So basically a Southern service that shares Gatwick Express branding. So there would no longer be a dedicated Gatwick Express train but instead all of the fast trains would share Gatwick Express branding.

What i would then do is change all of the London Victoria to Bognor Regis / Brighton / Chichester / Eastbourne / Hastings / Littlehampton / Ore / Portsmouth And Southsea / Portsmouth Harbour / Southampton Central / Worthing services to run non stop between London Victoria and Gatwick Airport and vice versa. This would instantly increase Gatwick Express from 2tph to 8tph without having to change the timetable.

It would also benefit non airport passengers as the trains would be quieter and no longer get filled up at East Croydon and Clapham Junction with local London passengers. One of the major problems with these Sussex trains is that they can get full and standing at East Croydon and Clapham Junction just with local London passengers.

Anyone to or from Gatwick Airport who requires East Croydon could instead take the frequent Thameslink trains which have a very frequent 8tph frequency. Any passengers for Clapham Junction could simply change at East Croydon which would still have the frequent East Grinstead and Caterham and Tattenham Corner trains. Potentially the two disused Gatwick Express paths per hour could also be used to provide an additional two trains per hour local London Victoria to Clapham Junction and East Croydon stopping service.

I think this would be the simplest way to do things and would keep the current timetable but provide extra fast trains. It would overall be a benefit for passengers too.

I think there is plenty of capacity to or from Gatwick Airport as it is so no actual extra trains are needed. But what i would do is make all trains 12 coaches long.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,601
Location
Taunton or Kent
I believe an Ashford - Redhill - Guildford - Reading service was part of a SouthEastern franchise spec pre-Covid? Confirmation welcome. It would certainly make use of underutilised rail infrastructure in the east. Doubt 100% electric SE would want to operate it though. And Redhill would probably need remodelling to cope with interchange to/from Gatwick.

Alternatively a new Edenbridge - Gatwick - Dorking by-pass line (avoiding the "Redhill reverse") has been mooted in the past. I can't see any UK government financing this, but if it were made a condition of Gatwick expansion I think it would be a winner, stimulating cross-regional traffic avoiding London and modal shift away from the M25. And releasing the 2tph GWR paths on the Brighton main line.
An understatement!
I believe the ambition was Ashford to Redhill via Tonbridge, possibly extending to Gatwick, however I don't ever recall this ambition including going any further west over the non-electrified stretches. I certainly think a service like this would have potential now, but certainly with an expanded Gatwick.
 

izvor

Member
Joined
11 Jun 2014
Messages
601
Location
on the SER
I believe the ambition was Ashford to Redhill via Tonbridge, possibly extending to Gatwick,
Yes there was a recent Network Rail report that examined various options for improving Kent - Gatwick links, the conclusion being basically that the only viable option was to just extend the existing Tonbridge to Redhill 1tph shuttle to Gatwick. Minimum cost, minimum traffic generation. There are memories of the Connex Strood/Maidstone to Horsham service (via Gatwick) of around 25 years ago, a brave idea but hardly an attractive offer (class 508s, all stations) for anything other than short-distance trips.

This report may have to be revisited in the light of today's announcement and potential funding.

However a colleague did inform me about the Ashford - Reading plan...
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,202
I believe an Ashford - Redhill - Guildford - Reading service was part of a SouthEastern franchise spec pre-Covid? Confirmation welcome. It would certainly make use of underutilised rail infrastructure in the east. Doubt 100% electric SE would want to operate it though. And Redhill would probably need remodelling to cope with interchange to/from Gatwick.
GWR could operate it, but it doesn't really compare with the appeal of Reading to Gatwick.
I believe the ambition was Ashford to Redhill via Tonbridge, possibly extending to Gatwick, however I don't ever recall this ambition including going any further west over the non-electrified stretches. I certainly think a service like this would have potential now, but certainly with an expanded Gatwick.
Hopefully it does happen, it makes the most sense (especially if you can periodically extend to Gatwick if paths allow).
Alternatively a new Edenbridge - Gatwick - Dorking by-pass line (avoiding the "Redhill reverse") has been mooted in the past. I can't see any UK government financing this, but if it were made a condition of Gatwick expansion I think it would be a winner, stimulating cross-regional traffic avoiding London and modal shift away from the M25. And releasing the 2tph GWR paths on the Brighton main line.
Sadly I can't see that being constructed pre-2050, the territory is too thin and the terrain would make construction very expensive Dorking to Gatwick.
 
Joined
2 Feb 2019
Messages
1,039
What i would do is simply change the Gatwick Express to operate like the Luton Express service. So basically a Southern service that shares Gatwick Express branding. So there would no longer be a dedicated Gatwick Express train but instead all of the fast trains would share Gatwick Express branding.

What i would then do is change all of the London Victoria to Bognor Regis / Brighton / Chichester / Eastbourne / Hastings / Littlehampton / Ore / Portsmouth And Southsea / Portsmouth Harbour / Southampton Central / Worthing services to run non stop between London Victoria and Gatwick Airport and vice versa. This would instantly increase Gatwick Express from 2tph to 8tph without having to change the timetable.

It would also benefit non airport passengers as the trains would be quieter and no longer get filled up at East Croydon and Clapham Junction with local London passengers. One of the major problems with these Sussex trains is that they can get full and standing at East Croydon and Clapham Junction just with local London passengers.

Anyone to or from Gatwick Airport who requires East Croydon could instead take the frequent Thameslink trains which have a very frequent 8tph frequency. Any passengers for Clapham Junction could simply change at East Croydon which would still have the frequent East Grinstead and Caterham and Tattenham Corner trains. Potentially the two disused Gatwick Express paths per hour could also be used to provide an additional two trains per hour local London Victoria to Clapham Junction and East Croydon stopping service.

I think this would be the simplest way to do things and would keep the current timetable but provide extra fast trains. It would overall be a benefit for passengers too.

I think there is plenty of capacity to or from Gatwick Airport as it is so no actual extra trains are needed. But what i would do is make all trains 12 coaches long.
Definitely yes to making all the trains 12 coaches long but definitely no to skipping Clapham Junction. They all need to call at Clapham Junction as Clapham Junction is the interchange for journeys between SWR stations and Gatwick Airport in addition to being an important interchange for many journeys to and from Southern stations.
 

PGAT

Established Member
Joined
13 Apr 2022
Messages
2,136
Location
Selhurst
Definitely yes to making all the trains 12 coaches long but definitely no to skipping Clapham Junction. They all need to call at Clapham Junction as Clapham Junction is the interchange for journeys between SWR stations and Gatwick Airport in addition to being an important interchange for many journeys to and from Southern stations.
Agreed theres no benefit to skipping Clapham Junction other than from the airports perspective selling a premium service. Hopefully this is less of an incentive when GTR is nationalised
 

PTR 444

Established Member
Joined
22 Aug 2019
Messages
2,647
Location
Wimborne
Alternatively a new Edenbridge - Gatwick - Dorking by-pass line (avoiding the "Redhill reverse") has been mooted in the past. I can't see any UK government financing this, but if it were made a condition of Gatwick expansion I think it would be a winner, stimulating cross-regional traffic avoiding London and modal shift away from the M25. And releasing the 2tph GWR paths on the Brighton main line.
Bypassing Redhill via Gatwick would be quite some detour and add several additional miles for Dorking - Edenbridge journeys. While it would improve connectivity to Gatwick from Dorking and Edenbridge, it might make some cross-Redhill journeys less attractive.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,439
Location
The Fens
What i would then do is change all of the London Victoria to Bognor Regis / Brighton / Chichester / Eastbourne / Hastings / Littlehampton / Ore / Portsmouth And Southsea / Portsmouth Harbour / Southampton Central / Worthing services to run non stop between London Victoria and Gatwick Airport and vice versa. This would instantly increase Gatwick Express from 2tph to 8tph without having to change the timetable.
Completely disagree on this. Both East Croydon and Clapham Junction are hugely important for interchange. For many journeys this is turning 1 change into 2 changes, not no changes into 1 change.

There is another connectivity issue to consider too. I use East Croydon not Gatwick Airport for interchange between Thameslink and West Coastway because it is cross platform and less crowded than Gatwick Airport. Actively encouraging people to change trains at Gatwick is bonkers, especially if that change is not cross platform. Gatwick is congested enough with airport passengers.


What i would do is simply change the Gatwick Express to operate like the Luton Express service. So basically a Southern service that shares Gatwick Express branding. So there would no longer be a dedicated Gatwick Express train but instead all of the fast trains would share Gatwick Express branding.
I have a more radical solution, which is to run the 2tph Brighton-Victoria as part of Thameslink with class 700s. It would only require 5 units and ought to be possible with the existing fleet given that the core peak hour service has never got to 24 tph, and the number of units used on GN services. It might require a bit of fiddling to get those 5 units to be 12 cars not 8 cars.
 

PTR 444

Established Member
Joined
22 Aug 2019
Messages
2,647
Location
Wimborne
I have a more radical solution, which is to run the 2tph Brighton-Victoria as part of Thameslink with class 700s. It would only require 5 units and ought to be possible with the existing fleet given that the core peak hour service has never got to 24 tph, and the number of units used on GN services. It might require a bit of fiddling to get those 5 units to be 12 cars not 8 cars.
So are you suggesting that Brighton loses all of its direct trains to London Victoria? It might be better from an operational perspective, but likely wouldn’t go down well with the travelling public.

Are there any alternatives to increasing capacity on the BML? One idea I have is to abolish Peterborough - Horsham (how many people actually make the end to end journey anyway) and split the Portsmouth/Bognor trains at Crawley instead of Horsham so the smaller stations between Crawley and Horsham can still be served.
 

stadler

Established Member
Joined
5 Jun 2023
Messages
3,304
Location
Horsley
Completely disagree on this. Both East Croydon and Clapham Junction are hugely important for interchange. For many journeys this is turning 1 change into 2 changes, not no changes into 1 change.

There is another connectivity issue to consider too. I use East Croydon not Gatwick Airport for interchange between Thameslink and West Coastway because it is cross platform and less crowded than Gatwick Airport. Actively encouraging people to change trains at Gatwick is bonkers, especially if that change is not cross platform. Gatwick is congested enough with airport passengers.



I have a more radical solution, which is to run the 2tph Brighton-Victoria as part of Thameslink with class 700s. It would only require 5 units and ought to be possible with the existing fleet given that the core peak hour service has never got to 24 tph, and the number of units used on GN services. It might require a bit of fiddling to get those 5 units to be 12 cars not 8 cars.
Running a service branding as "Thameslink" that does not go through the Thameslink Core would not make sense. So i would not classify it as "Thameslink" just because 700s were to be used. But i suppose you could use 700s on Brighton to London Victoria and operate it as a Southern service. The 700s already run Great Northern services. Not much difference to the current GX 387s running SN services and the SN 387s running GX services.
 

TheGrew

Member
Joined
31 Jul 2012
Messages
520
In a universe where further 3rd rail fill-in schemes were likely to get approved, I would be tempted to get Gatwick Airport to pay for the electrification of the remaining parts of the North Downs line. Additionally, this, coupled with longer electric trains (possibly the 350/2s), would probably provide a more significant capacity boost than from London, which is already well served by Southern, Thameslink, and GatEX services.
That would make getting to Gatwick much more straightforward by train for those from Birmingham (and other places on the Cross Country network), Wales, and the West Country, while avoiding the Tube and Elizabeth Line completely.
 

PTR 444

Established Member
Joined
22 Aug 2019
Messages
2,647
Location
Wimborne
In a universe where further 3rd rail fill-in schemes were likely to get approved, I would be tempted to get Gatwick Airport to pay for the electrification of the remaining parts of the North Downs line.
I think it’s far more likely that Gatwick will pay for a fleet of new battery trains for the North Downs Line.
Additionally, this, coupled with longer electric trains (possibly the 350/2s), would probably provide a more significant capacity boost than from London, which is already well served by Southern, Thameslink, and GatEX services.
That would make getting to Gatwick much more straightforward by train for those from Birmingham (and other places on the Cross Country network), Wales, and the West Country, while avoiding the Tube and Elizabeth Line completely.
Birmingham - Gatwick will still be quicker via London. If you want to avoid the tube completely, just walk from Euston to St Pancras where you can catch a Thameslink train to Gatwick.
 

RUFJAN15

Member
Joined
1 Jan 2015
Messages
49
Are there any alternatives to increasing capacity on the BML? One idea I have is to abolish Peterborough - Horsham (how many people actually make the end to end journey anyway) and split the Portsmouth/Bognor trains at Crawley instead of Horsham so the smaller stations between Crawley and Horsham can still be served.
Some time ago Southern hit on the idea of splitting a peak Victoria - Bognor/Portsmouth service at Three Bridges so that the Bognor portion could cover the local stations to Horsham. Three Bridges has multiple platforms and more staffing, so better than Crawley.

The problem was that Horsham is a significant traffic generator and everyone travelling to Crawley/Horsham wanted to use the front (faster) portion. This used to be packed out leaving Three Bridges.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,439
Location
The Fens
So are you suggesting that Brighton loses all of its direct trains to London Victoria?
No, 2tph Brighton-Victoria as now.

One idea I have is to abolish Peterborough - Horsham (how many people actually make the end to end journey anyway)
The station to station flows have 11k one way journeys Peterborough-Gatwick and 4k one way journeys Peterborough-East Croydon. There are also 3k one way journeys Peterborough-Brighton.

Thameslink isn't about end to end journeys. My guess would be that Thameslink's biggest end to end flow is Cambridge-Brighton at 27k one way journeys. Peterborough-Horsham is basically the old Peterborough-Kings Cross and Horsham-London Bridge services joined up, they can't just be abolished.

split the Portsmouth/Bognor trains at Crawley instead of Horsham
No signalling or traincrew facilities at Crawley for this, though it could be done at Three Bridges.

It would mess with the paths of the Bognor portions at Ford-Barnham.
 
Last edited:

TheGrew

Member
Joined
31 Jul 2012
Messages
520
I think it’s far more likely that Gatwick will pay for a fleet of new battery trains for the North Downs Line.

Birmingham - Gatwick will still be quicker via London. If you want to avoid the tube completely, just walk from Euston to St Pancras where you can catch a Thameslink train to Gatwick.
Quicker, yes, but appealing with suitcases? Unlikely, Reading by comparison is quite a modern station that is a comparatively easy change. Thameslink is not all that well-advertised to the general public, and neither is the relatively close proximity of Euston and King's Cross/St Pancras.
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,491
Location
Gomshall, Surrey
As much as I would like the 769s to come back, I fear the DfT won't allow it! :s
Indeed - the utter farce of the 769s will surely never progress to such a sensible next stage! Meanwhile the NDL will remain a vastly under-used route resource.

== Doublepost prevention - post automatically merged: ==

Need to make the Bedford-Brighton, Cambridge-Brighton and Peterborough-Horsham Thameslink trains that call at Gatwick Airport 2tph all day seven days a week. Also run the 2tph Reading-Gatwick Airport service with new 8-car third rail plus battery trains.

Gatwick Express trains need to call at Clapham Junction and they need to simplify the fares between Gatwick Airport and London as recommended in the following article from Railfuture.
Wow - the infrastructure works necessary to allow that would be big, given that platforms on the route were just lengthened, where required, to accommodate four car trains! As the 769s were pretty much ready to go just before being axed, I can't see the expenditure on 8-car new (technically complex) trains being approved.
 
Last edited:

devon_belle

Member
Joined
21 Jul 2022
Messages
666
Location
Surrey
My thoughts are that 12 car Southern and GatEx services wherever possible would be a good start. I only think 4 tph GatEx would be worth doing if people could be enticed off of Southern trains and onto these instead. Plus, GatEx trains should not be lengthened if it will shorten Southern trains. Southern has its own problems with short trains so using those units on fresh air GatEx trains doesn't feel sensible.

I don't know if lengthening the North Downs Line trains will make much of a difference. The number of travellers must be tiny compared to those using Southern+GatEx+Thameslink services. In my experience they've never been rammed, though I would be a supporter of longer, faster trains for other flows.

In another universe where we have money to spend on infrastructure I think Gatwick should get its own dedicated railway into central London, perhaps to connect with the Elizabeth line. Possibly one (HS4?) to Heathrow as well.
 

PTR 444

Established Member
Joined
22 Aug 2019
Messages
2,647
Location
Wimborne
No, 2tph Brighton-Victoria as now.
Sorry, I assumed "part of Thameslink" meant that you intended to divert them through the core.
The station to station flows have 11k one way journeys Peterborough-Gatwick and 4k one way journeys Peterborough-East Croydon. There are also 3k one way journeys Peterborough-Brighton.

Thameslink isn't about end to end journeys. My guess would be that Thameslink's biggest end to end flow is Cambridge-Brighton at 27k one way journeys. Peterborough-Horsham is basically the old Peterborough-Kings Cross and Horsham-London Bridge services joined up, they can't just be abolished.
Apart from the stations between Crawley and Horsham, I dont think there are any stations south of London Bridge served exclusively by the Peterborough - Horsham trains (Horley also has the Three Bridges - Bedford trains while Merstham and Coulsdon South also have the Reigate - Victoria trains), so they could be curtailed at Blackfriars or London Bridge to improve reliability of the ECML leg.

== Doublepost prevention - post automatically merged: ==

In another universe where we have money to spend on infrastructure I think Gatwick should get its own dedicated railway into central London, perhaps to connect with the Elizabeth line. Possibly one (HS4?) to Heathrow as well.
In an ideal world, the Brighton Main Line would be four tracked all the way from Victoria to Brighton. Fast tracks should be dedicated to Victoria - Clapham Junction - Gatwick - Brighton expresses (maintaning Intercity or GatEx branding), while the slow tracks are for commuter services with more stops.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,825
Location
Central Belt
I would think that more Thameslink services are the better solution.

As others have said make divert the Peterborough - Horsham service to run non-stop East Croydon - Gatwick Airport so you have fast trains between St Pancras and Gatwick Airport every 7-8 minutes (12 car of course). The question then will be what become of the Redhill stops, should they go on a Thameslink service to say Kentish Town, or a Southern service to Victoria or London Bridge? Perhaps even take over the Rainham service paths after London Bridge.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,439
Location
The Fens
Apart from the stations between Crawley and Horsham, I dont think there are any stations south of London Bridge served exclusively by the Peterborough - Horsham trains (Horley also has the Three Bridges - Bedford trains while Merstham and Coulsdon South also have the Reigate - Victoria trains)
But you are cutting out trains to London Bridge and the Thameslink core currently served by the Horsham trains.
so they could be curtailed at Blackfriars or London Bridge to improve reliability of the ECML leg.
How are you going to do that?

In an ideal world, the Brighton Main Line would be four tracked all the way from Victoria to Brighton.
Balcombe Tunnel, Ouse Viaduct, Clayton Tunnel - good luck with that one.
 

frankmoh

On Moderation
Joined
7 May 2025
Messages
826
Location
London
Running a service branding as "Thameslink" that does not go through the Thameslink Core would not make sense. So i would not classify it as "Thameslink" just because 700s were to be used. But i suppose you could use 700s on Brighton to London Victoria and operate it as a Southern service. The 700s already run Great Northern services. Not much difference to the current GX 387s running SN services and the SN 387s running GX services.
The funny thing is that there is already a Southern service that is cross-London. Watford Junction-East Croydon. The route also used to use former Thameslink 319 stock.

What I'm saying is that this sort of thing has precedence, although having Southern-branded 700s is not so ideal.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,409
As others have said make divert the Peterborough - Horsham service to run non-stop East Croydon - Gatwick Airport so you have fast trains between St Pancras and Gatwick Airport every 7-8 minutes (12 car of course). The question then will be what become of the Redhill stops, should they go on a Thameslink service to say Kentish Town, or a Southern service to Victoria or London Bridge? Perhaps even take over the Rainham service paths after London Bridge.
The Rainham runs directly between the two Thameslink services which currently go via Redhill which would cause a more imbalanced timetable.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,439
Location
The Fens
I would think that more Thameslink services are the better solution.

As others have said make divert the Peterborough - Horsham service to run non-stop East Croydon - Gatwick Airport so you have fast trains between St Pancras and Gatwick Airport every 7-8 minutes (12 car of course).
Thameslink already has 8tph at Gatwick Airport, though currently 4tph are via Quarry and 4tph via Redhill. I doubt it would be possible to move 4tph onto the Quarry line.

Perhaps even take over the Rainham service paths after London Bridge.
I am in favour of pulling Thameslink out of Rainham, especially since the Elizabeth Line opened. But where is the path for them through East Croydon and Gatwick?

The Rainham runs directly between the two Thameslink services which currently go via Redhill which would cause a more imbalanced timetable.
Going north the Rainham passes through the core nicely between the Bedford and Cambridge via Quarry trains, but going south it is next train behind the Cambridge-Brighton.
 

izvor

Member
Joined
11 Jun 2014
Messages
601
Location
on the SER
Sadly I can't see that being constructed pre-2050, the territory is too thin and the terrain would make construction very expensive Dorking to Gatwick.
Agree on both counts (plus the cost of underground E-W platforms at Gatwick), but this announcement is the only opportunity to "dare to think big".

Bypassing Redhill via Gatwick would be quite some detour and add several additional miles for Dorking - Edenbridge journeys. While it would improve connectivity to Gatwick from Dorking and Edenbridge, it might make some cross-Redhill journeys less attractive.
But what Dorking - Edenbridge journeys? This movement must be minimal bordering on zero. And anyway, it would actually be facilitated, by having a through service instead of an enforced change.

Cross-Redhill for local journeys would be unchanged - still 1 or 2 tph on each leg with a change required.

The proposal would significantly speed journeys from the West of England and South Wales to Gatwick, and create a market for Tonbridge/Tunbridge Wells, Ashford and East Kent (possibly even Medway) direct to Gatwick, who currently have to travel by car (there is no longer even a direct coach service). Any improvements to more local movements would be collateral.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,409
Is it time to dust off the Thameslink 2 proposal?
Almost certainly not, as it doesn't help people get to Gatwick, and isn't going to get funding.

I can't see Gatwick Airport funding anything other than their runway changes. They will be expecting the public purse to fund any other transport improvements, and as is well versed, there aren't a lot of spare funds lying around for those.
 