Not an expert by any measure, but it would make sense to do it that way since it's unlikely that structures will align with cable run ends so the catenary wire will have to run under the bridges.
Yes, that does make sense. Especially with the four bridges being demolished and rebuilt (complete by May next year) along the route.
Spoke to an operator at Lennymuir today and he was saying that over the Christmas period that wires will go in starting from Haymaret. Delays at the moment are due to the RHTT being out thus preventing overnight possessions.
Wow, that's great to hear! Even if the wires won't be live, it'll still be very nice to see the masts and droppers in correct orientation. (Which to be fair, the wires will be as useful right now as they will when they're switched on, since only LNER will use them...)
It occurred to me from the tram to the airport the other day that between Haymarket East and Haymarket Central Jn you can see three different generations of OHLE. Wonder if that occurs elsewhere in such close proximity.
I'm not sure if London St Pancras + London Kings Cross would have multiple generations of OHLE. Considering the ECML having both the old OHLE, the newer series 2 OHLE from the Gasworks Tunnel remodel, HS1's overheads, and the St. Pancras to Bedford OHLE. I'm not sure if the ECML and MML OHLE are the same, but if not that would be cool.