Just another reminder that posts in this thread should be confined to consultation updates only.
A council said it is "shocked and disgusted" after learning more properties are set to be demolished to make way for a railway line
East West Rail (EWR) initially proposed demolishing 37 properties in Bedfordshire, but at a meeting on Tuesday, Bedford Borough Council was told a further 10 buildings, including flats and a GP surgery, are at risk.
An EWR spokesperson said that the proposed design changes "will be unsettling", but that it will be visiting residents to "explain our proposals in person".
From BBC News today
In their statement, EWR described its plans for an enlarged Bedford Station as "ambitious and transformative".
It added: "The proposed demolition of properties, while difficult, is necessary to significantly reduce construction time - by up to three years. This means the benefits of the new station can be delivered sooner, with less disruption over time."
In their planning documents, Universal has earmarked land for a bespoke station on the line outside their proposed resort.
The documents make clear that Universal chose the site at Kempston Hardwick, Bedfordshire, because of its transport links.
Visitors from abroad can easily fly to airports in London or Luton before driving or taking a train to the resort.
The proposals mention a new railway station could also be built on the East West Rail line, which links Oxford and Cambridge via Bedford, but planning permission is not being sought for this yet.
This can hardly be a surprise. The plans for redevelopment of Bedford Station, including its entrance, environs and link to the town centre have long been 'signalled'. IIUC no plans have yet been finalised; no building is yet 'scehduled for demolition', indeed the report states: 'The council said the properties at risk ...' note 'at risk'. I recognise that the days of large scale demolition have gone, but either Bedford wants a new station or it doesn't. Does it want EWR?From BBC News today
![]()
Council 'shocked' by East West Rail plans to demolish more homes
East West Railway proposes removing a further 10 properties in Bedford to make way for a new line.www.bbc.co.uk
Yes, but not in the way proposed. It wants EWR kept to the 'south' of the town aligned more closely to the old Varsity Line. This puts Bedford on the north point of a triangle with the line running east to west to the south of the town so trains calling at Bedford Midland would have to come from the south and reverse out south.Does it want EWR?
Is that the settled view of Bedford Borough Council? Is that a basis on which EWR might develop (change?) its plans; might it prolong (or reduce) the uncertainties of residents of the Poets area to the north of the station?Yes, but not in the way proposed. It wants EWR kept to the 'south' of the town aligned more closely to the old Varsity Line. This puts Bedford on the north point of a triangle with the line running east to west to the south of the town so trains calling at Bedford Midland would have to come from the south and reverse out south.
I think historically Bedford Midland wasn't technically on the Varsity Line but at the nearby station of Bedford St John's though NOT the current station of that name.
Reversing in and out of Bedford would not happen, just like it is not going to happen at Milton Keynes.This puts Bedford on the north point of a triangle with the line running east to west to the south of the town so trains calling at Bedford Midland would have to come from the south and reverse out south.
This is historically correct, but not relevant to the EWR proposals. The old Varsity Line closed almost 60 years ago, even I'm not old enough to remember it. EWR is to serve 21st century economic growth in the Oxford-Cambridge corridor, not to replicate 19th and 20th century history.I think historically Bedford Midland wasn't technically on the Varsity Line but at the nearby station of Bedford St John's though NOT the current station of that name.
The strong impression I get is that the revised EWR proposals for Bedford are driven by the desire to move more quickly, not more slowly. Both the Treasury and Universal will be pushing hard on this.maybe kick progress to Cambridge into the long grass
That depends on your definition of "quite a way".The Ashburnham Road buildings are quite a way to the east of the existing station footprint.
I get to see a lot of modern construction projects in progress, including Cambridge South station and various new buildings on the Biomedical Campus. Work can proceed remarkably quickly but that requires good access to get raw materials in and waste products out. It also needs plenty of space for staff accommodation, storage of plant and equipment and storage of raw materials.If the land was going to be used to make EWR or the station better for everyone then I probably be okay with the disruption to people's lives that the demolition will cause. But it's harder to get behind the "this will make construction quicker" argument.
This can hardly be a surprise. The plans for redevelopment of Bedford Station, including its entrance, environs and link to the town centre have long been 'signalled'. IIUC no plans have yet been finalised; no building is yet 'scehduled for demolition', indeed the report states: 'The council said the properties at risk ...' note 'at risk'. I recognise that the days of large scale demolition have gone, but either Bedford wants a new station or it doesn't. Does it want EWR?
Is that what Bedford Borough Council wants? If so they will need to be more open to the need for development, including redevelopment. Much local 'government' has been infected by NIMBYism- 'the voice of the people'. EWR is not 'democraticly eleected'. The Labour Government may not have long in which to get 'facts on the ground'.Unfortunate for those affected - and they need to be fully compensated - but you can't expect the redevelopment and expansion of a town centre railway station without some properties needing to be be demolished.
Bedford really should be one of the big winners from EWR with direct services opening up to Cambridge and Oxford and being at the centre of the Ox-Cam Arc - plus the Universal theme park development. There should be huge economic benefits for the town.
Unfortunate for those affected - and they need to be fully compensated - but you can't expect the redevelopment and expansion of a town centre railway station without some properties needing to be be demolished.
Or you know, lose the parking. Especially if it is temporary for construction compounds and access, that seems entirely acceptable.Given the massive street level car parks and depot around Bedford station I think you easily could expect that. A bit of local knowledge does help when it comes to this. Yes you'd lose parking but that could be replaced by going multi storey, it's all street level at present.
Or you know, lose the parking. Especially if it is temporary for construction compounds and access, that seems entirely acceptable.
I know lots of people drive to stations to take the train into London, if that is what you mean. You state there is lots of parking, I wasn't suggesting taking anything beyond what is necessary for station construction.Thus spake someone who doesn't understand how a lot of people commute in the South East. Losing parking entirely would not be an option. Going multi storey absolutely would though.
Given the constraints at either end of Bedford Station and the use of the slow line platforms for Thameslink I think it would be unreasonable to suggest it is possible to add another railway without affecting any properties outside the railway boundary at all.Given the massive street level car parks and depot around Bedford station I think you easily could expect that. A bit of local knowledge does help when it comes to this. Yes you'd lose parking but that could be replaced by going multi storey, it's all street level at present.
The cost of purchasing and demolishing the buildings will need to be balanced against the costs of a more constrained work site. If it requires a longer construction period or the use of specialized equipment/more line closures, that can tilt the balance in favour of demolition, but that can then cause planning delays and associated costs.Not at all sure why those would need to be demolished, there's clearly room for another two tracks well away from those properties.
On the other hand neither of those buildings is of particular architectural merit.
I guess they want to clear the whole block to make a clear site for the station and parking.Not at all sure why those would need to be demolished, there's clearly room for another two tracks well away from those properties.
On the other hand neither of those buildings is of particular architectural merit.
Not at all sure why those would need to be demolished, there's clearly room for another two tracks well away from those properties.
On the other hand neither of those buildings is of particular architectural merit.
We are considering a range of work for Bedford station including rebuilding the station building, creating a new station plaza, constructing footbridges and two new platforms (reduced from the three shown in previous proposals), and providing replacement car parking, all to give passengers the best possible experience.
Bedford St John’s was next to London Road, Bedford, and to the west was the flat 90 degree crossing with the Hitchin lineYes, but not in the way proposed. It wants EWR kept to the 'south' of the town aligned more closely to the old Varsity Line. This puts Bedford on the north point of a triangle with the line running east to west to the south of the town so trains calling at Bedford Midland would have to come from the south and reverse out south.
I think historically Bedford Midland wasn't technically on the Varsity Line but at the nearby station of Bedford St John's though NOT the current station of that name.
“It must be remembered that there is nothing more difficult to plan, more doubtful of success, nor more dangerous to manage, than the creation of a new system. For the initiator has the enmity of all who would profit by the preservation of the old institutions and merely lukewarm defenders in those who would gain by the new ones.” Niccolo Machiavelli is alive and well in living in Bedford.In the greater scheme of EWR - the route in & out of Bedford to Cambridge has been under debate for 30+ years so regardless of what Bedford Borough Council or it's residents still want, I think it's indicative that uncertainty over selection of a route has taken so long and still now, may get changed again?
“It must be remembered that there is nothing more difficult to plan, more doubtful of success, nor more dangerous to manage, than the creation of a new system. For the initiator has the enmity of all who would profit by the preservation of the old institutions and merely lukewarm defenders in those who would gain by the new ones.” Niccolo Machiavelli is alive and well in living in Bedford.
The plans for East West rail as a key element of the Oxford Cambridge arc predate the announcement of the construction of Universal leisure complex and have been controversial in the City of Bedford, The directly elected City Mayor lives east of the city and has views about the overall routing of the line. The only general consensus about new railway facilities is the need for a new station at Wixams servicing Thameslink trains.
The home counties are in general sensitised to new infrastructure projects as evidenced by the protracted disputes concerning HS2 and the ability of the internet to link up opposition. For those interested in the gritty detail of how to cope the political opposition to new rail infrastructure, I commend Sally Gimson’s new book about HS2 = “Off the Rails” ISBN 978 1 83643 017 9
Therefore the Council’s view can be summarised as follows,
• That EWR should connect with the centre of Bedford and that any Bedford south station does not achieve this objective
• That any proposed interchange with the Wixams is significantly more complex than has been presented in the consultation documents and in our opinion, is undeliverable in the available footprint
• That a connection into Bedford Midland is deliverable with significantly reduced costs to those put forward by EWR Company, and given the improved economic performance and connectivity, that this should be the preferred route.
In addition, we would like to reiterate the following comments which were addressed in our original response,
• The opportunity to create a national and regional transport hub which has the potential to benefit the Oxford Cambridge Arc and the East Midlands will be missed if there is no connection to Bedford Midland
• A connection to Bedford Midland will deliver 12% more economic benefits to Bedford, and EWR generally than a southern route, and that by contrast a southern option would damage the town’s competitiveness and future development
• A connection which directly serves the centre of Bedford meets the DfT’s strategic aim to ‘provide rail links between key urban areas’
• A station serving the centre of Bedford would support regeneration in the town and the delivery of the Town Centre Masterplan, including the area around the station
• A station in central Bedford provides access to jobs and leisure opportunities for people within existing and expanded settlements served by the railway
• The new rail market provided by EWR Western Section between Oxford and Bedford will be lost if a southern option is selected
• A route serving Bedford Midland will best support additional new growth. Developments to the south of Bedford are already committed and have been factored into current service patterns.