From this December's timetable change, the only regular through Northern services at Newcastle will be the Middlesbrough semifasts every other hour with Carlisle stoppers, with Carlisle semifasts and Hexham, Morpeth and Nunthorpe stoppers terminating at Newcastle.

(Off-topic, but I hadn't realised how bad the connections would be under the draft timetable in some North East cases – Hexham local stations to Middlesbrough would go from a direct service to a 52 minute wait at Newcastle.)

I wonder what the rationale is behind the change?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,088
Location
Redcar
If we're going to start getting into the weeds of the changes being brought in by the December 2025 timetable change it's probably time to take it to the dedicated thread for the ECML timetable change :)

 

nerdowell

Member
Joined
24 Apr 2024
Messages
53
Location
Bebside
Northumberland Park Construction Update - "Opening Later this year"

Ahead of the lift installation and platform works over the next few weeks, we catch up with the project team to hear the latest progress on station construction at Northumberland Park...

Special 158 Livery: The Northumbrian - Unveiled featuring imagery of landmarks from along the Northumberland Line including Woodhorn Pit Wheels, Blyth Beach Huts and Seaton Delaval Hall

New train artwork celebrating the reopening of the Northumberland Line and the history of the local area has been unveiled by Northern.

Featuring depictions of local landmarks including Seaton Delaval Hall, Blyth Beach Huts and Woodhorn Colliery, the colourful vinyl was revealed during a ceremony at Ashington station earlier today.

It also includes football fans in Newcastle United and Sunderland colours, The Angel of the North and George Stephenson, the famous engineer from Northumberland who played a key role in the creation of the modern railway in 1825...
 
Last edited by a moderator:

hacman

Member
Joined
22 Jul 2011
Messages
502
One of those routes though where it always seems like a solid 95%+ of the train gets off at Newcastle in either direction though. Admittedly I don't do it all that often but on every occasion I've seen it the train basically empties on arrival and then refills. Obviously it would be better if the connection wasn't 52 minutes though but I don't think it's a disaster either way.

That's true, and I suspect MetroCentre and Sunderland, which have the most alternatives, make up most of the total through demand.

This is the reason for the change - the number of people who actually travel across Newcastle to any station that isn't Sunderland or Metrocentre is very small, and having trains run through has long been a cause of knock-on delays.

The connection timing needs to be tightened up, but hopefully, this can then start to be done with future timetable changes.

To this end, it has been a very good thing that the NL is currently an isolated diagram for the most part - faster journey times and good connections are worth a lot, but they will always come second to consistency and on-time running as that is what makes a service reliable. Reliability is one of the headline selling points of this project, with the existing bus services being anything but.
 

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,510
Location
Isle of Man
Looks like I caught the branded 158 the day after it had been launched. Similar branding on the inside of the unit too, along the band between the luggage rack and the window.

It looked very smart. I was pleased to finally tick the line off too.
 

Attachments

  • IMG_3488.jpeg
    IMG_3488.jpeg
    4.1 MB · Views: 123

GuyGibsonVC

Member
Joined
29 Nov 2019
Messages
232
Location
Up North
‘The latest delays on the £300 million railway was revealed by council leader Glen Sanderson at Wednesday's meeting of Northumberland County Council’

Two of the remaining stations on the Northumberland Line railway will not reopen to the public until 2026, it has been confirmed...

Looks like Northumberland Park and Bedlington have been pushed into next year.
 
Last edited by a moderator:

Meole

Member
Joined
28 Oct 2018
Messages
735
At least both are still to be opened, always a chance they could have been cancelled to save costs.
 

GuyGibsonVC

Member
Joined
29 Nov 2019
Messages
232
Location
Up North
500,000 passengers have now travelled on the Northumberland Line since it opened, train operator Northern has announced.

The operator has been running trains since the line opened in December 2024, with the milestone of half a million customer journeys achieved just eight months later.


If you build it, they will come…
 
Last edited by a moderator:

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,296



If you build it, they will come…
I won't be surprised to see Ashington with higher passenger numbers than Morpeth, in 2025-6 if not this year (as ORR statistics are April–March). I'd guess journeys to / from Ashington make up the majority of those on the line right now, and probably would have taken some journeys away from Morpeth (520,000 passengers in 2023-4).
 

androdas

Member
Joined
3 Aug 2011
Messages
310
Location
The Winning
In my experience Newsham and even Deleval seem to get as many boarding as Ashington. But I do mainly use the line in the peaks.

Absolutely Morpeth (and Cramlington) will have taken a hit. Before Ashington opened I used to drive to Morpeth quite regularly when I travelled for work long distance. Now I park at Ashington for free and change at Newcastle. I have colleagues from Cramlington that now just use Deleval as it has free parking and more trains
 

GuyGibsonVC

Member
Joined
29 Nov 2019
Messages
232
Location
Up North
I won't be surprised to see Ashington with higher passenger numbers than Morpeth, in 2025-6 if not this year (as ORR statistics are April–March). I'd guess journeys to / from Ashington make up the majority of those on the line right now, and probably would have taken some journeys away from Morpeth (520,000 passengers in 2023-4).

Yes, the half hour frequency, free parking and cheaper fares will have shifted some from Morpeth. Even Pegswood, with its handful of trains a day, see people go down the road to Ashington.

Deleval has been the dark horse. Saves you getting stuck in the North Tyneside traffic and you can be in the City Centre in less than 20 mins for £2.

No wonder the car park is full!
 

Baxenden Bank

Established Member
Joined
23 Oct 2013
Messages
4,744
Can anyone confirm the station opening date for Blyth Bebside please? Last news was late August / early September. I note from RealtimeTrains that calls are shown as 'unadvertised ordinary passenger', but that all trains are calling.
 

GuyGibsonVC

Member
Joined
29 Nov 2019
Messages
232
Location
Up North
Can anyone confirm the station opening date for Blyth Bebside please? Last news was late August / early September. I note from RealtimeTrains that calls are shown as 'unadvertised ordinary passenger', but that all trains are calling.

There are some road resurfacing works planned for mid September. With the other stations, they usually give around a couple of weeks notice.

With this in mind, I’d say any opening will be probably be in late September at the earliest.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,267
There are some road resurfacing works planned for mid September. With the other stations, they usually give around a couple of weeks notice.

With this in mind, I’d say any opening will be probably be in late September at the earliest.
On the Northumberland Line website they've just announced the 2-week delay to nearby road works, that should have been happening next week, because they've just found "access challenges resulting from complex issues with utilities in this area". So I expect that’s possibly the same work area as you have mentioned?

There are also "unknown utilities" causing delays to associated road works near Bedlington station. Amazing how often utilities issues come up after work starts, I suppose the older a place is, the more of a problem there is with accurate record keeping.

I forgot :oops: to add a link to the Northumberland Line news page, it’s the top 2 articles:
Front Street, Bebside - Roadworks Update
...the final stage of the highways works will now take place overnight during a four-night full road closure on Front Street, starting on Friday 12 September and finishing on Monday 15 September. Works will be ongoing between 7pm and 6am each day during this period...
Bedlington Road Works Update
We are pleased to share that the works on Ravensworth Street/Station Street, to complete essential drainage upgrades, are now complete and the road will reopen at 5pm on Friday 22nd August 2025.

However, these works have discovered underground utilities in the area, which were previously unknown, meaning that the next phase of works (the closure of part of Barrington Road) have been postponed...
 
Last edited by a moderator:

GuyGibsonVC

Member
Joined
29 Nov 2019
Messages
232
Location
Up North
On the Northumberland Line website they‘ve just announced the 2 week delay to nearby road works, that should have been happening next week, because they’ve just found “access challenges resulting from complex issues with utilities in this area”. So I expect that’s possibly the same work area as you have mentioned?

There are also “unknown utilities” causing delays to associated road works near Bedlington station. Amazing how often utilities issues come up after work starts, I suppose the older a place is the more of a problem there is with accurate record keeping.

Yes, that was the work I was referencing.

Bedlington has the same issues. I have a bit of sympathy as that part of Northumberland was one big coal mine and I’d imagine the earthworks and utilities are complex.

Still, nearly two years overdue is a bit galling.
 

danielnez1

Member
Joined
14 May 2012
Messages
311
Location
Seghill
Yes, that was the work I was referencing.

Bedlington has the same issues. I have a bit of sympathy as that part of Northumberland was one big coal mine and I’d imagine the earthworks and utilities are complex.

Still, nearly two years overdue is a bit galling.
The money pit of inefficiency is appauling.
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,460
Location
Sheffield
Massive match at St James Park tonight to prove the value of this rail link from the heartland of NUFC's support but seems normal 2 car trains into Newcastle. KO 20.00 so those wanting to get back to Ashington will welcome the 4 car 22.16, the last train of the day.

This may not go well, football or travel wise? Hope Northern have a contingency plan for their part of the evening.
 
Last edited:

duffield

Established Member
Joined
31 Jul 2013
Messages
3,280
Location
East Midlands
Massive match at St James Park tonight to prove the value of this rail link from the heartland of NUFC's support but seems normal 2 car trains into Newcastle. KO 20.00 so those wanting to get back to Ashington will welcome the 4 car 22.16, the last train of the day.

This may not go well, football or travel wise? Hope Northern have a contingency plan for their part of the evening.
It sounds pretty difficult for getting that train. With time added on, matches often get very close to the two hour mark, 15 minutes to get out of the (presumably capacity filled) ground and over to the station doesn't seem feasible to me. But I'm not a local, maybe this can be made to work.
Obviously if the result is very clear cut by 70-80 minutes some people will leave early, but it could be close goal fest with Liverpool looking like they can both score and concede lots of goals at present.

Ideally Northern would delay this service by 15-30 minutes, surely they could get a path at that time of night? Or even better run and extra service.
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,460
Location
Sheffield
It sounds pretty difficult for getting that train. With time added on, matches often get very close to the two hour mark, 15 minutes to get out of the (presumably capacity filled) ground and over to the station doesn't seem feasible to me. But I'm not a local, maybe this can be made to work.
Obviously if the result is very clear cut by 70-80 minutes some people will leave early, but it could be close goal fest with Liverpool looking like they can both score and concede lots of goals at present.

Ideally Northern would delay this service by 15-30 minutes, surely they could get a path at that time of night? Or even better run and extra service.
55,000 crowd expected. That last Northern service will be very cosy!

TPE are seemingly not offering any direct services back to Liverpool after their 20.58.

No sign of any charter trains today either? Makes one wonder what's the point of a railway?

It should be a good evening for taxi drivers in Newcastle tonight.
 

Llandudno

Established Member
Joined
25 Dec 2014
Messages
2,743
Location
Matlock
55,000 crowd expected. That last Northern service will be very cosy!

TPE are seemingly not offering any direct services back to Liverpool after their 20.58.

No sign of any charter trains today either? Makes one wonder what's the point of a railway?

It should be a good evening for taxi drivers in Newcastle tonight.
Or the match kicks off no later than 1830…
 

duffield

Established Member
Joined
31 Jul 2013
Messages
3,280
Location
East Midlands
Or the match kicks off no later than 1830…
As it's a bank holiday, if it was for the fans' convenience it would be an afternoon match. But I guess Sky wanted it at 20:00 for maximum peak viewing time - just about the worst possible time for Liverpool fans.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,522
Location
Northampton
No sign of any charter trains today either? Makes one wonder what's the point of a railway?
Charter trains are increasingly hard to run for football matches, especially late kickoffs. Racing to beat the blocks while trying to avoid getting trapped behind all-shacks but not leave all the fans behind and it quickly just becomes a hiding to nothing.
The public services finishing by 10pm is poor though.
It should be a good evening for taxi drivers in Newcastle tonight.
When does the Metro stop running?
 

GuyGibsonVC

Member
Joined
29 Nov 2019
Messages
232
Location
Up North
Massive match at St James Park tonight to prove the value of this rail link from the heartland of NUFC's support but seems normal 2 car trains into Newcastle. KO 20.00 so those wanting to get back to Ashington will welcome the 4 car 22.16, the last train of the day.

This may not go well, football or travel wise? Hope Northern have a contingency plan for their part of the evening.

The new December timetable has a 2321 departure back to Ashington which will be very welcome.

This helps those going to the match, theatre, shows, etc.
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,460
Location
Sheffield
Charter trains are increasingly hard to run for football matches, especially late kickoffs. Racing to beat the blocks while trying to avoid getting trapped behind all-shacks but not leave all the fans behind and it quickly just becomes a hiding to nothing.
The public services finishing by 10pm is poor though.

When does the Metro stop running?
Sorry we've gone off topic. There's a new thread encompassing football and the railway here; https://www.railforums.co.uk/thread...rains-home-for-away-fans.291308/#post-7439730 Should football game finish times take into account suitable trains home for away fans?

But in this case they should allow for home fans too! The Ashington and Blyth area is historically a hot bed of support for the Magpies ( home of Jackie Milburn, the Charlton brothers, Dan Burn etc). The Metro doesn't get close - but last trains normally run from Newcastle city centre just before midnight
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,841
The new December timetable has a 2321 departure back to Ashington which will be very welcome.

This helps those going to the match, theatre, shows, etc.
The notion of folk from Ashington going to the theatre made me chuckle.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,267
Any update from anyone when Bebside is going to open
I think no earlier than the end of September, based on Saturday‘s discussions about problems with local roads. (Post #1455 onwards.). The project website still does not give a date.
 

Tge1435

Member
Joined
20 Oct 2023
Messages
14
Location
Northumberland
Any update from anyone when Bebside is going to open

The current programme indicates that Bebside Station will open in October 2025 as whilst the construction activity is nearing completion, the complex regulatory process of securing ‘entry into service’ will take a few months to conclude; it is expected that Bedlington Station and Northumberland Park will open in early 2026.
 