NEW PENDOLINOS:
As many of you will know from other threads, Virgin have now introduced a new "11-car" Pendolino - 390 054 - which is temporarily 9-car.
Although I haven't been on this Pendolino yet, from what I've been told, I find it quite shocking that nothing has been changed (or shall I say, rectified).
Here are some common complaints:
Surely Virgin and Alstom will have learnt from these mistakes, and will have corrected them in the new Pendolinos? Perhaps Virgin don't want to change anything - or cannot change anything - because changing the specification would dramatically increase the price of these new trains.
Nevertheless, it seems short-sighted to me. The current Pendolino's are approaching 10 years of age. Like 222's (which are newer), they will eventually have to be refurbished - quite dramatically too if the toilet problems are to be fixed.
Surely now - with the introduction of these 4 new Pendolino's - would be an opportune time to show what refurbished Pendolino's would be like? These new Pendolino's could be the "refurbished" model, with the current Pendolino's to follow in the next few years.
PLATFORM EXTENSIONS:
Virgin and the DfT continually say that 11-car Pendolino's cannot be brought into service until Platform Extension work has been completed. Why is this?
For through stations, 11-car Pendolino's could easily be brought into service without any Platform Extension work by using SDO (Selective Door Operation). For terminus stations, 11-car Pendolino's could be brought into service by extending platforms to accommodate 10-car trains and by using SDO. (Most terminus stations - such as London Euston - already seem to be capable of accommodating 10-car trains since they can accommodate 10-car doubled-up Super Voyagers.)
I have attached a diagram to explain what I mean. At through stations, passengers in Coach A and Coach K would only have to walk a distance of less than one metre - i.e. into the next carriage - to exit the train. They'd only have to enter the carriage, not walk through it. How hard can it be!?
For terminus stations that can accommodate 10-car trains, passengers in Coach A or Coach K would have to do the same thing to exit the train.
Does anyone know of any reasons for why this cannot be done? Or at least why Virgin or the DfT don't want to do it? It seems simple enough to me - and extremely cost effective.
Also note that, as shown in the diagram, I think that on 11-car Pendolino's the First Class Quiet Coach can be switched back to being the first First Class carriage after Standard Class. There would be no pantograph above the carriage, and staff wouldn't have to pass through the carriage, creating less noise. On an 11-car Pendolino with 7 Standard Class carriages, I think it will be very rare for First Class to be declassified.
As many of you will know from other threads, Virgin have now introduced a new "11-car" Pendolino - 390 054 - which is temporarily 9-car.
Although I haven't been on this Pendolino yet, from what I've been told, I find it quite shocking that nothing has been changed (or shall I say, rectified).
Here are some common complaints:
- The seats are too hard!
- Not enough seats line up with the windows!
- The toilets smell!
- There isn't enough luggage space!
Surely Virgin and Alstom will have learnt from these mistakes, and will have corrected them in the new Pendolinos? Perhaps Virgin don't want to change anything - or cannot change anything - because changing the specification would dramatically increase the price of these new trains.
Nevertheless, it seems short-sighted to me. The current Pendolino's are approaching 10 years of age. Like 222's (which are newer), they will eventually have to be refurbished - quite dramatically too if the toilet problems are to be fixed.
Surely now - with the introduction of these 4 new Pendolino's - would be an opportune time to show what refurbished Pendolino's would be like? These new Pendolino's could be the "refurbished" model, with the current Pendolino's to follow in the next few years.
PLATFORM EXTENSIONS:
Virgin and the DfT continually say that 11-car Pendolino's cannot be brought into service until Platform Extension work has been completed. Why is this?
For through stations, 11-car Pendolino's could easily be brought into service without any Platform Extension work by using SDO (Selective Door Operation). For terminus stations, 11-car Pendolino's could be brought into service by extending platforms to accommodate 10-car trains and by using SDO. (Most terminus stations - such as London Euston - already seem to be capable of accommodating 10-car trains since they can accommodate 10-car doubled-up Super Voyagers.)
I have attached a diagram to explain what I mean. At through stations, passengers in Coach A and Coach K would only have to walk a distance of less than one metre - i.e. into the next carriage - to exit the train. They'd only have to enter the carriage, not walk through it. How hard can it be!?
For terminus stations that can accommodate 10-car trains, passengers in Coach A or Coach K would have to do the same thing to exit the train.
Does anyone know of any reasons for why this cannot be done? Or at least why Virgin or the DfT don't want to do it? It seems simple enough to me - and extremely cost effective.
Also note that, as shown in the diagram, I think that on 11-car Pendolino's the First Class Quiet Coach can be switched back to being the first First Class carriage after Standard Class. There would be no pantograph above the carriage, and staff wouldn't have to pass through the carriage, creating less noise. On an 11-car Pendolino with 7 Standard Class carriages, I think it will be very rare for First Class to be declassified.