Rail Ranger
Member
- Joined
- 20 Feb 2014
- Messages
- 1,112
I disagree. Many diesel enthusiasts divide their time between main line charters and diesel gala events at heritage railways.
As much as I'd like to see more interchanges, I wonder how many heritage railways it's been beneficial for so far. For ones like the Chinnor and Princes Risborough or Cholsey and Wallingford with only two stations, and the NR one having a frequent service to somewhere like London, I'd suspect it's worth it. For cases like the (from what I remember, short-lived) Northallerton West, or Whitby, I wonder if the heritage railways would be better off following the Epping Ongar Railway's example of bus links to stations.the NR connection and interchange may turn out not to be a sufficient financial benefit to justify it
There'll always be a price point at which some interested people would be put off, but the only ones I've seen which I've found affordable in the UK have been the much shorter ones (typically ~40 minutes for the Metropolitan ones?) on the London Underground.by other factors such as spiralling ticket costs
You can only increase fares by so much unfortunately - they already went up at the start of this year. I do think it was very generous (perhaps too generous) to charge the Bluebell 65 gala as a standard travel day rather than a gala day.I suspect that this is part of the reason why the Bluebell made a half-millon loss last year and could well make a similar loss this year, while the Ffestiniog didn't.
To my mind, if a line is running at a loss, it effectively means that they are subsidising people to travel on it. This is unsustainable. Either there has to be significant cost cutting (and you would need to make quite a few people redundant in order to save half a million each year), or fares need to go up to a level where income matches outgoings.
Unfortunately as well as significant retrenchment in the heritage sector, I suspect that we are also going to see significant fare increases. Some lines, such as the Ffestiniog, have already started this. Some for example have already cut back on member benefits, and changed their fare structures so that those making part journeys pay more. But TBH this kind of thing is just fiddling around the edges, and won't bring in significant extra income. That will only be achieved by increasing the headline fares that the majority of passengers pay.
I was surprised to read a post from a Bluebell volunteer saying that the East Grinstead interchange really doesn't get much traffic outside of certain event days; I thought if any extension/connection was going to be beneficial it would be that one, with regular direct trains from London to East Grinstead plus the fact that I've always understood many London residents don't have a car due to London's ubiquitous public transport.As much as I'd like to see more interchanges, I wonder how many heritage railways it's been beneficial for so far. For ones like the Chinnor and Princes Risborough or Cholsey and Wallingford with only two stations, and the NR one having a frequent service to somewhere like London, I'd suspect it's worth it. For cases like the (from what I remember, short-lived) Northallerton West, or Whitby, I wonder if the heritage railways would be better off following the Epping Ongar Railway's example of bus links to stations.
== Doublepost prevention - post automatically merged: ==
There'll always be a price point at which some interested people would be put off, but the only ones I've seen which I've found affordable in the UK have been the much shorter ones (typically ~40 minutes for the Metropolitan ones?) on the London Underground.
Rather annoyingly for visitors there’s a public timetable and a working timetable - the WTT can often have trains timetabled to leave up to 20 minutes later than the public timetable does, so although the railway has the train on time, for visitors the service is late.From what I’ve read the watercress line is doing reasonably well financially, it’s a good railway to visit with plenty to do and see on top of that the engine work hard so get a good noise off them .
Bluebell line is also a lovely one to visit with again plenty to do and see ( only thing I’ve found tho is they always tend to run behind the time table , or at when least when I visit. Not a big deal though. ) I do think they don’t match their timetable to certain events. I .e the engine shed visits etc.
The thing is, the money earned from ticket sales isn't just based on the price of tickets, it's also based on how many people buy tickets, and obviously that number will go down as the price increases. Finding the price where revenue is maximised is of course very difficult.I suspect that this is part of the reason why the Bluebell made a half-millon loss last year and could well make a similar loss this year, while the Ffestiniog didn't.
To my mind, if a line is running at a loss, it effectively means that they are subsidising people to travel on it. This is unsustainable. Either there has to be significant cost cutting (and you would need to make quite a few people redundant in order to save half a million each year), or fares need to go up to a level where income matches outgoings.
Unfortunately as well as significant retrenchment in the heritage sector, I suspect that we are also going to see significant fare increases. Some lines, such as the Ffestiniog, have already started this. Some for example have already cut back on member benefits, and changed their fare structures so that those making part journeys pay more. But TBH this kind of thing is just fiddling around the edges, and won't bring in significant extra income. That will only be achieved by increasing the headline fares that the majority of passengers pay.
I did contact them regarding the tours , the reply I got was it’s worked around availability between services etc , they also said people still come from east Grinstead but just miss the first 20 odd minutes which i thought was an odd thing to say , why would people pay knowing they are going to miss at least 20 mins ( if train is on time).Rather annoyingly for visitors there’s a public timetable and a working timetable - the WTT can often have trains timetabled to leave up to 20 minutes later than the public timetable does, so although the railway has the train on time, for visitors the service is late.
I remember our conversation about the shed tours not being accessible from East Grinstead, so I will pass that on. They are new for this year, so can and likely will be adapted.
Not an ideal situation with the tours, and it would be more like half an hour missed, which at that point is just a waste of money. Will chase it up, as the tours should be available to anyone who wants to do it and meets the criteria.I did contact them regarding the tours , the reply I got was it’s worked around availability between services etc , they also said people still come from east Grinstead but just miss the first 20 odd minutes which i thought was an odd thing to say , why would people pay knowing they are going to miss at least 20 mins ( if train is on time).
Your second point is some what baffling to me. Why on earth would you run two separate time tables ? That makes no logical sense, especially as customers will be working around the published one
I find the current situation of Quainton road quite sad , they've really had all their options for building a decent running line snatched from right under them as :Would it be more resilient for the heritage, and less hassle for HS2 if the entire Quainton Road site were moved to a Thame Industrial estate, and they funded the rebuild of the line to Princes Risborough? So you'd have a fairly unique 'V' journey to Risborough then Chinnor.
What do you mean by significant retrenchment? Preserved lines closing?I suspect that this is part of the reason why the Bluebell made a half-millon loss last year and could well make a similar loss this year, while the Ffestiniog didn't.
To my mind, if a line is running at a loss, it effectively means that they are subsidising people to travel on it. This is unsustainable. Either there has to be significant cost cutting (and you would need to make quite a few people redundant in order to save half a million each year), or fares need to go up to a level where income matches outgoings.
Unfortunately as well as significant retrenchment in the heritage sector, I suspect that we are also going to see significant fare increases. Some lines, such as the Ffestiniog, have already started this. Some for example have already cut back on member benefits, and changed their fare structures so that those making part journeys pay more. But TBH this kind of thing is just fiddling around the edges, and won't bring in significant extra income. That will only be achieved by increasing the headline fares that the majority of passengers pay.
I was meaning more about things like cutting unprofitable services, reducing the number of operating days and the like. But sadly, I do think that the sheer number of preserved lines is likely to be unsustainable long term.What do you mean by significant retrenchment? Preserved lines closing?
The Snowdon Mountain Railway must have significant operating costs, as it can only carry a very limited number of passengers on each train, each of which is crewed with two members of paid staff. The fares are very expensive as a result, yet sufficient people travel on it to break even.If you make fares too expensive it will put a lot of people off travelling on preserved railways and passenger number will reduce year after year. That will become unsustainable as well.
The Snowdon Mountain Railway must have significant operating costs, as it can only carry a very limited number of passengers on each train, each of which is crewed with two members of paid staff. The fares are very expensive as a result, yet sufficient people travel on it to break even.
The Ffestiniog's first class is always the first to fill up, again indicating that there are plenty of people who are prepared to pay a significant fare.
I think some enthusiasts seem to have ideas about pricing that are based more on nostalgia than present day realities. The idea that £20 or £30 per person is too much to pay for a day or even half a day's entertainment is ludicrous. These days, families are prepared to pay significant sums for a day at the likes of Alton Towers.
I spent something like £200 just to get to the Bluebell's recent gala. The Bluebell fare cost was negligible in comparison. Do you really think I would have been put off if the fare were even double what they currently charge?
Yes, putting up the price would mean a drop in the numbers. But it isn't the number of passengers that is important. What is important is to break even, in order for the line to survive. If that means carrying significantly less passengers, paying significantly higher fares, then so be it.
The problem is that while some railways, like the two you mention, have a certain status in the tourist industry which allows them to charge premium prices without their passenger numbers collapsing, a fairly "ordinary" heritage railway in unremarkable countryside with no particular attractions along the line, whose main appeal to non-enthusiasts is just being somewhat local and offering a steam train ride may find that any significant increase in fares causes numbers to plummet to a degree that takes the line further from break even, not nearer.The Snowdon Mountain Railway must have significant operating costs, as it can only carry a very limited number of passengers on each train, each of which is crewed with two members of paid staff. The fares are very expensive as a result, yet sufficient people travel on it to break even.
The Ffestiniog's first class is always the first to fill up, again indicating that there are plenty of people who are prepared to pay a significant fare.
I think some enthusiasts seem to have ideas about pricing that are based more on nostalgia than present day realities. The idea that £20 or £30 per person is too much to pay for a day or even half a day's entertainment is ludicrous. These days, families are prepared to pay significant sums for a day at the likes of Alton Towers.
I spent something like £200 just to get to the Bluebell's recent gala. The Bluebell fare cost was negligible in comparison. Do you really think I would have been put off if the fare were even double what they currently charge?
Yes, putting up the price would mean a drop in the numbers. But it isn't the number of passengers that is important. What is important is to break even, in order for the line to survive. If that means carrying significantly less passengers, paying significantly higher fares, then so be it.
Must say I worry a lot about the slowness of some preserved lines to catch on to what may well be the “new normal”. By which I mean things like the economic climate and future prospects; changing leisure tastes among the general public; and “green” considerations.
An example - engineering standards for track-work on heritage lines.
For lines like the Bluebell who have a long established reputation for smartness and high standards of work, it may perhaps be defensible to keep things very spick and span (and when out of sight, very modern in concept) when doing renewals. Their magazine has hugely informative “infrastructure” pages and it’s clear that a great deal of precise work is now normal - things like sleeper ends being laid out to millimetre precision, using lasers for alignment.
Even it that case, it does jar a bit when the signal engineers install great quantities of kit requiring huge grey cabinet cases all along the lineside. Suspect a lot of this is driven by people wanting to play with all the tech, rather than any real need … on a 25 mph railway.
Moving to another example, the RVR extension to Robertsbridge. Huge tech-y engineering - of course necessary for things like bridges, and at road level crossings and their signalling. But for track? What they are doing involves bulldozing a roadway all along the route, destroying trees and lineside vegetation - and surely pissing off the objecting locals to an even greater extent! Of course it also destroys the ad-hoc charm of the Col Stephens railway backwater which this line was before it closed. When finished it will look just like Network Rail - or be even more manicured than that.
Is all this really necessary and best practice? Or are all those in charge retired engineers, just doing what they are familiar with and what comes naturally to ex-employees of the big railway? Surely it would have been practicable to extend (on plain line at least) at lower cost and in a less mechanised way, providing lighter trackwork more attuned to the past, and to a slow trundling present-day ride to enjoy the scenery? That approach could also have kept more volunteers happy for longer in doing the work, too.
Of course this extension was long desired; and got the go-ahead (and financial support) just before the recent economic downturn and the various perils now evident in the world. But I fear it will end up as just a millstone of cost for the revived railway, once the inital thrill of opening has passed. If it was proposed now it would have been kicked into touch.
I have just returned from a holiday in North Wales and spent a small fortune visiting a number of railways. Snowdon was the only one I regret doing...People are prepared to pay for sure, however they also have expectations of receiving value for money. If you have a read of Trip Advisor, the reviews for something like Snowdon MR aren’t always universally positive. In particular, “paid a lot of money, stuffed in a cramped compartment” is a common complaint.
There is definitely opportunity to make extra income from secondary spend, such as catering and souvenirs. Unfortunately as the likes of the NT are finding, such spend can be even more affected by people tightening their belts than entrance charges. Additionally, it is more difficult to run catering outlets with volunteers with current food hygiene certification requirements, and running them with paid staff can decrease the profit margin dramatically.Also, as I pointed out previously, it's not uncommon for charities that run visitor attractions to not break even from admissions. That doesn't inherently make them unsustainable.
Well, the question here is, if it does make a loss, if it genuinely attracts enough passengers that it makes up for the money lost. If it does, it's hardly madness...I understand some lines even justify their catering making a loss because it is needed to attract passengers to travel. That sounds like madness to me. At the very least, any catering outlet should at least break even.
As I mentioned, you have to take into account donations when discussing the finances of a charity.At the end of the day, the money has to come from somewhere.
I was staying close to the Ffestiniog Railway last week, with an extended family of six.I have just returned from a holiday in North Wales and spent a small fortune visiting a number of railways. Snowdon was the only one I regret doing...
As the Ffestiniog found when rebuilding the Welsh Highland, it is much easier to find people prepared to (re)build a railway than to maintain one that you have already got. And it is likewise a lot easier to obtain funding. Extensions and the like generate a lot of enthusiasm and press coverage - the problem is what comes afterwards.If you haven't got enough volunteers to do it the cheap way then you have little choice if you are set on extending. Finding a gang of 20 people happy to slog away for months installing a new railway will probably not work.
I can understand that, but I think they missed a trick by not at least charging for the Pulmans or the LNW obs. There were plenty of people making a beeline for those coaches as soon as the trains came in.First class was declassified all weekend because if it had been classified there wouldn’t have been enough seats in some sets. It’s not viable to be repeatedly kicking everyone out of first and making them stand elsewhere or pay the upgrade.
If First Class was to be treated as such, presumably First Class Day Rovers would be available? On most, if not all, heritage railway galas I have attended this has not been the case and First Class is open to all.
As the Ffestiniog found when rebuilding the Welsh Highland, it is much easier to find people prepared to (re)build a railway than to maintain one that you have already got. And it is likewise a lot easier to obtain funding. Extensions and the like generate a lot of enthusiasm and press coverage - the problem is what comes afterwards.
== Doublepost prevention - post automatically merged: ==
I can understand that, but I think they missed a trick by not at least charging for the Pulmans or the LNW obs. There were plenty of people making a beeline for those coaches as soon as the trains came in.
I was also surprised at the complete absence of any ticket checking the whole day I spent there. Surely having your ticket clipped is part of the heritage experience?
I can understand that, but I think they missed a trick by not at least charging for the Pullmans or the LNW OBO. There were plenty of people making a beeline for those coaches as soon as the trains came in.
I was also surprised at the complete absence of any ticket checking the whole day I spent there. Surely having your ticket clipped is part of the heritage experience?
The observation car generally doesn’t have a charge anymore due to the fact it tended to be a cash supplement (a card machine not being feasible for the cost). Only around 10% of our tickets booked on the day are paid for with cash. There is also a lack of volunteers to ensure upgrades are paid for, and a few other factors.No ticket checking on Sunday either