Extend HS2 from Birmingham Airport south-west mostly following the M42 connecting with the Birmingham-Cheltenham line south of Bromsgrove.
Build link between HS1 and HS2 as originally planned.
Reinstate March-Spalding line with loading gauge profile to handle the largest containers as an alternative to sending traffic via Peterborough to/from Felixstowe.
Build link between HS1 and HS2 as originally planned.
Reinstate March-Spalding line with loading gauge profile to handle the largest containers as an alternative to sending traffic via Peterborough to/from Felixstowe.