Yes, but how often are main line services crush loaded, apart from at their London termini when dwell time doesn't matter, and at how many places do they have a substantial crush load interchange on and off, like the Jubilee Line at Waterloo?

Regularly crush loaded. And with 2 doors per coach (and narrow doors on the 455s at that), it only needs one way flow fir there to be long dwells. For big two way flows, off the top of my head:

Clapham J, Wimbledon, Richmond, Balham, E Croydon, Denmark Hill, Lewisham, and London Bridge (6-9).

Notably the Elizabeth line has 60 second dwells throughout the core, even with 3 sets of door per coach side, and they are often needed.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Craig1122

Member
Joined
14 May 2021
Messages
375
Location
UK
I think the same is true across much of the South East. I’m pretty sure the Hastings - Charing Cross line is slower than it was.

I can compare 1972 for Hastings (Possibly not fair because that's pre electrification). Saturday times because they're more consistent.

It was 101 minutes every hour in 1972

The current service is either a fast at 92 minutes or a stopper taking 104. Etchingham and Wadhurst had no service for most of the day in 72 and the trains were non stop at London Bridge which would be unthinkable now. High Brooms has also gained an all day service to London. There's also now a substantially earlier start on weekdays and later finish.

So overall the current timetable is very much better. I think it's easy to forget that higher frequency is often effectively a journey time reduction for anyone who can't time their arrival at the station exactly
 

Peter stanley

Member
Joined
31 Aug 2020
Messages
22
Location
Horsham
I can compare 1972 for Hastings (Possibly not fair because that's pre electrification). Saturday times because they're more consistent.

It was 101 minutes every hour in 1972

The current service is either a fast at 92 minutes or a stopper taking 104. Etchingham and Wadhurst had no service for most of the day in 72 and the trains were non stop at London Bridge which would be unthinkable now. High Brooms has also gained an all day service to London. There's also now a substantially earlier start on weekdays and later finish.

So overall the current timetable is very much better. I think it's easy to forget that higher frequency is often effectively a journey time reduction for anyone who can't time their arrival at the station exactly
Yes I would much rather have say, two trains per hour slightly slower, than have just one per hour fast.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,342
Notably the Elizabeth line has 60 second dwells throughout the core, even with 3 sets of door per coach side, and they are often needed.
As a daily Liz user I can report how tedious one finds such timewasting stops in the core, sat there (well, standing, actually) at stop after stop, way after passenger movement is completed with nothing going on.
 

stuu

Established Member
Joined
2 Sep 2011
Messages
3,774
Notably the Elizabeth line has 60 second dwells throughout the core, even with 3 sets of door per coach side, and they are often needed.
As a regular user of the EL from CW to Paddington, I have never experienced a time when the dwells seemed like they were needed. Off peak especially it feels glacial. Once I was on a train when there was disruption and the train left as soon as possible and it made up about 3 minutes running time
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,276
Location
West Wiltshire
What do you mean by commercial reasons?
Originally there was a bit of spare (not scheduled to 100% of acceleration and braking), something like 5% extra (it's so long ago I forget).

Then from late 1980s or 1990s statistics on percent of late of trains came in, initially when data was input manually it was only taken at final stop so got padding out of timetable (Waterloo-Vauxhall was say 4 minutes, but Vauxhall+Waterloo jumped to 9 or 10 minutes), so could be 5 minutes late all intermediate stations and still be on time when arriving at terminus.

Later as more automatic logging of times became available was extended to doing stats at all stations. Subsequently delay repay came along, and guess what more slowing to avoid payouts.

Recently all the operating companies have to publish on their website performance data for previous 4 week period, and now changing from 5 or 10 minute late being deemed on time to 3 minutes.

The commercial part is the slowing of trains and having extra long station stops to avoid delay payouts, which seems to have become more important than fast service, or increasing revenue by selling fast efficient journeys
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,976
Location
Newport
Subsequently delay repay came along, and guess what more slowing to avoid payouts.
General refunds for poor performance began after John Major’s 1991 Citizen Charter, translated on BR into the Passenger Charter.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,438
Location
The Fens
Regularly crush loaded. And with 2 doors per coach (and narrow doors on the 455s at that), it only needs one way flow fir there to be long dwells. For big two way flows, off the top of my head:

Clapham J, Wimbledon, Richmond, Balham, E Croydon, Denmark Hill, Lewisham, and London Bridge (6-9).
In my experience long dwells are a significant issue at stations with big two way flows especially Clapham Junction, Wimbledon and Richmond. The refurbish of the South Western class 455s did help to manage the issue with the narrow doors.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,179
Location
Wilmslow
Not southern, I know, but I compared Manchester-Macclesfield stoppers (Stockport, then all stations) today - 31 minutes - with my regular travel back in 1977 - 31.5 minutes. Dwell times are certainly longer, so presumably better acceleration and higher speed compensates.

Today’s peak service frequency is virtually non-existent in comparison, though, one extra train in the day to the otherwise hourly service.
 

williamn

Established Member
Joined
22 May 2008
Messages
1,708
I can compare 1972 for Hastings (Possibly not fair because that's pre electrification). Saturday times because they're more consistent.

It was 101 minutes every hour in 1972

The current service is either a fast at 92 minutes or a stopper taking 104. Etchingham and Wadhurst had no service for most of the day in 72 and the trains were non stop at London Bridge which would be unthinkable now. High Brooms has also gained an all day service to London. There's also now a substantially earlier start on weekdays and later finish.

So overall the current timetable is very much better. I think it's easy to forget that higher frequency is often effectively a journey time reduction for anyone who can't time their arrival at the station exactly
Interesting, thanks! I think I was thinking since electrification. I’m pretty sure Wadhurst to London was under the hour, and now it’s always over an hour.
 
Last edited:

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,965
The commercial part is the slowing of trains and having extra long station stops to avoid delay payouts, which seems to have become more important than fast service, or increasing revenue by selling fast efficient journeys

It really isnt a commercial decision ‘to avoid payouts’. Longer dwell times are there to reflect the reality of train running and large numbers of passengers. We want the trains to run on time!
 
Last edited:

RT4038

Established Member
Joined
22 Feb 2014
Messages
5,463
The commercial part is the slowing of trains and having extra long station stops to avoid delay payouts, which seems to have become more important than fast service, or increasing revenue by selling fast efficient journeys
Therre is no point in trying to sell 'fast, efficient journeys' if they are not consistently achievable, and not being consistently achievable is unlikely to materially increase revenue but instead end up with disappointed customers.
Far better to sell an achievable most of the time but slower service.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,035
Location
London
Building resilience into the timetable to avoid having to pay out for delays.

Which is no bad thing. Greater Anglia is one of the best operators currently and has a timetable with plenty of allowances. People get to where they want to based on journey planner / timetable they have looked at. And maybe even slightly early as a nice bonus.

It’s not all a conspiracy by the sneaky TOC.

== Doublepost prevention - post automatically merged: ==

As a regular user of the EL from CW to Paddington, I have never experienced a time when the dwells seemed like they were needed. Off peak especially it feels glacial. Once I was on a train when there was disruption and the train left as soon as possible and it made up about 3 minutes running time

If the train is even slightly delayed, CBTC will automatically retime the dwells lower to reduce delay.

“Glacial” is a bit extreme - you could maybe chop 15-20 seconds off-peak. But a consistent journey time throughout the day also has benefits.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,748
Originally there was a bit of spare (not scheduled to 100% of acceleration and braking), something like 5% extra (it's so long ago I forget).

Then from late 1980s or 1990s statistics on percent of late of trains came in, initially when data was input manually it was only taken at final stop so got padding out of timetable (Waterloo-Vauxhall was say 4 minutes, but Vauxhall+Waterloo jumped to 9 or 10 minutes), so could be 5 minutes late all intermediate stations and still be on time when arriving at terminus.

Later as more automatic logging of times became available was extended to doing stats at all stations. Subsequently delay repay came along, and guess what more slowing to avoid payouts.

Recently all the operating companies have to publish on their website performance data for previous 4 week period, and now changing from 5 or 10 minute late being deemed on time to 3 minutes.

The commercial part is the slowing of trains and having extra long station stops to avoid delay payouts, which seems to have become more important than fast service, or increasing revenue by selling fast efficient journeys
Why is there such a conspiracy theory over schedules and delay repay?
 

Peter stanley

Member
Joined
31 Aug 2020
Messages
22
Location
Horsham
I wonder how that compares with equivalent journeys by road in 2025 compared to 1975?
Interesting point. I would guess long distances are quicker due to motorways but shorter distances such as between central London and Croydon with no motorway option certainly seems to take longer with more congestion. Maybe checking old bus timetables would give some indication.
 

perstreperous

Member
Joined
19 Sep 2022
Messages
44
Location
South London
Interesting point. I would guess long distances are quicker due to motorways but shorter distances such as between central London and Croydon with no motorway option certainly seems to take longer with more congestion. Maybe checking old bus timetables would give some indication.
You're right. In the early 1990s Herne Hill-Leatherhead was viable by car - I could leave at 0815 and get there by 0900. Now it is only viable if I set out before 0700, and coming back is unviable at any time. Which is why I got rid of my car. (I have worked on and off with that journey for 35 years).

Simple population increase is probably much of the reason (in my census area, 36 per cent in 30 years ... it is not obvious that the late 1980s/early 1990s were a post-war low point for London).
 
Last edited:

Peter stanley

Member
Joined
31 Aug 2020
Messages
22
Location
Horsham
Originally there was a bit of spare (not scheduled to 100% of acceleration and braking), something like 5% extra (it's so long ago I forget).

Then from late 1980s or 1990s statistics on percent of late of trains came in, initially when data was input manually it was only taken at final stop so got padding out of timetable (Waterloo-Vauxhall was say 4 minutes, but Vauxhall+Waterloo jumped to 9 or 10 minutes), so could be 5 minutes late all intermediate stations and still be on time when arriving at terminus.

Later as more automatic logging of times became available was extended to doing stats at all stations. Subsequently delay repay came along, and guess what more slowing to avoid payouts.

Recently all the operating companies have to publish on their website performance data for previous 4 week period, and now changing from 5 or 10 minute late being deemed on time to 3 minutes.

The commercial part is the slowing of trains and having extra long station stops to avoid delay payouts, which seems to have become more important than fast service, or increasing revenue by selling fast efficient journeys
Whether longer dwells are to build resilience or avoid delay payouts, my recollection (admittedly subjective and unscientific) is that punctuality was better in the 60s and 70s. I travelled regularly and lived close to a railway and recall that you could almost set your clock by the passing trains - being more than two or three minutes late was a rarity. Major disruptions very rare, only after heavy snow or a derailment eg freight train at Streatham common 1965.

== Doublepost prevention - post automatically merged: ==

Originally there was a bit of spare (not scheduled to 100% of acceleration and braking), something like 5% extra (it's so long ago I forget).

Then from late 1980s or 1990s statistics on percent of late of trains came in, initially when data was input manually it was only taken at final stop so got padding out of timetable (Waterloo-Vauxhall was say 4 minutes, but Vauxhall+Waterloo jumped to 9 or 10 minutes), so could be 5 minutes late all intermediate stations and still be on time when arriving at terminus.

Later as more automatic logging of times became available was extended to doing stats at all stations. Subsequently delay repay came along, and guess what more slowing to avoid payouts.

Recently all the operating companies have to publish on their website performance data for previous 4 week period, and now changing from 5 or 10 minute late being deemed on time to 3 minutes.

The commercial part is the slowing of trains and having extra long station stops to avoid delay payouts, which seems to have become more important than fast service, or increasing revenue by selling fast efficient journeys
Apart from less delays, I also also remember cancellations were almost unheard of .
 
Last edited:

sh24

Established Member
Joined
28 Sep 2023
Messages
1,522
Location
London
Why is there such a conspiracy theory over schedules and delay repay?

As with most conspiracy theories, my hunch is they provide a simple answer to explain rather than acknowledging that the world is complex, difficult and hard work!
 

185

On Moderation
Joined
29 Aug 2010
Messages
5,709
At least these services don't have the "ceremony of the doors" a la Northern. If they did each stop would take 2 mins!
To test this theory:

Just looked at a train at Guide Bridge, 2G12, Northern EMU. It had a dwell time of 30 seconds. 1141.45 departing 1142.15.

And to add balance 2H61 currently at Woodley, Northern DMU. It too had a 30 second dwell time. 1151.30 departing 1152.00.

This Northern door ceremony you mention. It seems pretty good.

Those DOO services down south should be faster and more efficient. But are they? Simple fact, is that longer trains can take longer to dispatch.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,035
Location
London
Whether longer dwells are to build resilience or avoid delay payouts, my recollection (admittedly subjective and unscientific) is that punctuality was better in the 60s and 70s. I travelled regularly and lived close to a railway and recall that you could almost set your clock by the passing trains - being more than two or three minutes late was a rarity. Major disruptions very rare, only after heavy snow or a derailment eg freight train at Streatham common 1965.

== Doublepost prevention - post automatically merged: ==


Apart from less delays, I also also remember cancellations were almost unheard of .

No offence, but this seems like the epitome of rose-tinted glasses!
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,490
Location
Gomshall, Surrey
Building resilience into the timetable to avoid having to pay out for delays.
Exactly that - thanks!

== Doublepost prevention - post automatically merged: ==

No offence, but this seems like the epitome of rose-tinted glasses!
Agreed - on a good day, journeys were quicker in general, and most people were fine, but slam doors opening in motion (for boarding and alighting!) were fundamentally unsafe. However, humans deal with their existing reality well and accidents were far less frequent than might be expected - no platform yellow lines; people just knew to stand back, and passengers opening doors in motion knew to check for people on the platfom before opening wide. I recall the norm of unlatching doors on entering the platform at Waterloo, etc., and stepping off at 3-4mph every day without incident, but it was a young man's game!

== Doublepost prevention - post automatically merged: ==

There is also the signifiant impact of door release times - the Desiros, for example, are dire, and on a long suburban run this makes a significant difference.
 
Last edited:

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,276
Location
West Wiltshire
I happen to have the South West division timetable public booklet for 1979 and virtually everything has been slowed down in SWR land.

It was probably the fastest timetable, as it followed the increase in speeds 65mph to 75mph in New Malden area, Brockenhurst area resignalling, Feltham area resignalling.

Of course at the time much of SW inner London still used the lower 660v (not the 750v nominal after 4SUBs went), and 12% lower voltage was not going to help dc motored trains reach top speed.

Talking of top speed it was only 90mph, and a lot was only 60-80mph then. And they had very low acceleration as they approached top speed often taking many miles to get to max speed. braking from 90mph took longer as trains were tread braked. Now you have trains that can rapidly accelerate to 100mph and are disc braked.

So basically have quicker trains, but slower dwell times, and lots of hanging about. Which explains why some stations are as much as 35% slower to/from Waterloo than 46 years ago.
 

LLivery

Established Member
Joined
13 Jul 2014
Messages
1,719
Location
Southeastern land
It's noticeable over the years and as well as vs Kent services

The Sydenham stoppers are now timed to take 10 mins from NXG to London Bridge, so 5-6 mins extra on the up vs down. The London Bridge service has just got more and more unattractive.
 

Peter stanley

Member
Joined
31 Aug 2020
Messages
22
Location
Horsham
It's noticeable over the years and as well as vs Kent services

The Sydenham stoppers are now timed to take 10 mins from NXG to London Bridge, so 5-6 mins extra on the up vs down. The London Bridge service has just got more and more unattractive.
Yes it's often the last part of the journey that takes the longest - gives more chance for late-running trains to "catch up" thus making the stats look better. Another factor may be platform availability at London bridge on the Brighton (terminating) side.

== Doublepost prevention - post automatically merged: ==

It's noticeable over the years and as well as vs Kent services

The Sydenham stoppers are now timed to take 10 mins from NXG to London Bridge, so 5-6 mins extra on the up vs down. The London Bridge service has just got more and more unattractive.
You may be interested to know that in 1975 the Sydenham to London Bridge journey took average of 15 mins with New Cross Gate to London bridge taking 5 to 6 minutes.
 
Last edited:

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,976
Location
Newport
I get the safety aspects of increased dwell but not the poor design of door operation and despatch that has engineered these inefficiencies, both in terms of build and ops process.

The underground has always been hugely focused on journey cycle reductions to increase frequency. If 2 mins can be saved on the cycle of a 2 minute headway line, either one less trainset is needed or 1tph can be added from the same resources.

The ex-BR network has gone in the opposite direction.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,965
Yes it's often the last part of the journey that takes the longest - gives more chance for late-running trains to "catch up" thus making the stats look better.

the stats are measured at every station, not just the terminus. There is no incentive* to stretch out the last part of the journey for the stats.

*except for viewers in Scotland and on TfL rail servcies
 

Peter stanley

Member
Joined
31 Aug 2020
Messages
22
Location
Horsham
the stats are measured at every station, not just the terminus. There is no incentive* to stretch out the last part of the journey for the stats.

*except for viewers in Scotland and on TfL rail servcies
So why do it? I can understand it for an operating reason eg lack of platform availability, but it does also reduce delay repay claims, given that most people on those services (Sydenham to London bridge) will be alighting at London Bridge not intermediate stations.
 

3141

Established Member
Joined
1 Apr 2012
Messages
2,131
Location
Whitchurch, Hampshire
The longer dwell times may just be because most trains only have 2 doors per carriage now (that open slowly) instead of something like 10 (as seen on the middle cars of an EPB or VEP)
Yes, and the design of a modern train, with large vestibules where the doors are, enables a larger number of passengers to be accommodated, so naturally they take longer to get on and off through the smaller number of doors.

I don't think the fact that these services take longer than they did 50 years ago is anything to get excited (or disappointed) about. More passengers, and more trains on the network, inevitably has consequences.

Comparing the Southern Electric area with the Underground isn't useful. The Underground itself is busier than it used to be, and dwell times in the peaks are often longer. But there'll be another train in two minutes, so passengers can choose not to get on this one. Also, efforts are made to speed things up: "This train is now ready to leave, please stand clear of the closing doors, stand clear of the closing doors...." Actually it's not ready to leave, people are still trying to get on, but it's coming to the end of its scheduled dwell time and so people are being encouraged to stop trying and wait for the next one.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,965
So why do it?

Because….

for an operating reason eg lack of platform availability

…and getting the timetable to work.

If you look at the timetable in Real time trains, you can see that almost all the allowances in addition to the base running time is pathing time. That is what is used to make the timetable fit together. It is not to make it easier to achieve performance stats / delay repay / etc.

For reference, of the 49 Southern service trains timed to arrive at London Bridge terminating platforms between 0600-1000, only 11 have performance allowances inbound of New Cross Gate, and the total for those 11 trains is 11.5 minutes. Performance allowance is what is used to account for minor operational issues that we know will happen - on average - but not where or when. For example passenger assistance, very heavy loadings on certain services, ‘passenger action’, etc.
 