Killingworth
Established Member
My local station is achieving nearer 10% pa! I'd expect doubling well within 10 years. However, I can't see it happening without major investment at major choke points.A doubling of passengers over 50 years means rail growth of 1.4% year on year.
That's way off what we've been getting of late, so doubling in that timeframe is unlikely.
In fact over a 50 year period to see a quadrupling of passengers (2.82%) is still well below what all bar one (London Overground) TOC saw in growth last year (each of the rest with a growth rate of over 4%, with the majority seeing growth of over 5%)
To be more specific, 40 years ago I watched the singling of the lines between Sheffield and Manchester through Dore & Totley station in 1985. That followed reduction of the quadruple tracks from there into Sheffield. By 1995 Railtrack were realising the singling had been a mistake and started planning redoubling which should have been achieved by 2005 - but they went bust and it was paused.
10 years later the plans were being updated and included in the Manchester Hub proposals, slowly moving forward to a public inquiry in 2016. Whether there was any official pause or it was just normal rail project speed but it was finally completed in 2024.
The rationale was to add an extra fast train path between Sheffield and Manchester, improve paths for freight trains, and allow the stopping trains to run to all stations hourly. The first aim has not been achieved due to congestion around Manchester and Sheffield. The second may have been partially achieved, although the eastbound up hill Bamford loop is not too helpful for heavy aggregate and cement trains. The third aim was largely achieved in December 2022 before the scheme was completed by substituting Class 195s for Pacers!
What's happened with passenger numbers? 30% increase is possible in the 2024/25 year as lost ground after Covid is made up.

Reconfiguration down the Sheaf Valley into and at Sheffield was planned for HS2, with the addition of a 3rd track. It's largely the same work needed for MML electrification. That was intended to give more passenger capacity at the station as well as on the tracks. The wires were not the most essential or expensive part. Rebuilding bridges, replacing drainage, replacing points and track, then signalling and the ecology reports all add their millions.
Doubling passenger numbers within 10 years could be possible in some places. We've previously done that at Dore & Totley.
Pausing electrification is the headline but it's the delay, and possible total loss, of the other work that will have greater impact on provision of better passenger services.