Tim__
Member
Having watched the green signals video, quoting from the DFT press release they said phase 3 was being paused. I'd thought Wigston to Syston was phase 2. I suspect I'm clutching at straws?
Then why was it cancelled if it was easy to do?
Yep, unless I’m mistaken, RS2 is Wigston-Syston and RS3 is Syston-Trent JunctionHaving watched the green signals video, quoting from the DFT press release they said phase 3 was being paused. I'd thought Wigston to Syston was phase 2. I suspect I'm clutching at straws?
So once again MMLE is the victim of something beyond its control - money spent on something unrelated (the cynic in me squarely blames the government’s welfare farce) that leaves the MML as the loser again. All the millions wasted on prep work and admin.No money.
My gut is that it will proceed but slowly and in sections. Like we saw with Bedford to Kettering and Kettering to Wigston. Next would be Wigston to Leicester, then East Midlands Parkway, etc etcYep, unless I’m mistaken, RS2 is Wigston-Syston and RS3 is Syston-Trent Junction
== Doublepost prevention - post automatically merged: ==
So once again MMLE is the victim of something beyond its control - money spent on something unrelated (the cynic in me squarely blames the government’s welfare farce) that leaves the MML as the loser again. All the millions wasted on prep work and admin.
No doubt it’ll be the same story in 2035, 2045, etc. At this rate, every one of us will be long gone and there’ll still be no progress on MMLE!
For anywhere but the MML of courseWhen is HS2 getting it's wires installed?
Depending on when that is that may just be closer enough to now that the teams could find employment soon enough not to be lost. It may also allow further electrification afterwards without putting the cost up too much.
For anywhere but the MML of course![]()
Batteries, surely. Milliband knows best.When is HS2 getting it's wires installed?
Obviously it depends where you draw the boundaries, but it may not be that dissimilar.How many people live in the West Country, out at the extremities of the nation, compared to the centrally located East Midlands?
Regional electric railways are well-used, or regional well-used railways are electric?Regional electric railways are however well used. Nota bene.
I can't see Crossrail running through to Reading without GWML electrification, it wouldn't have been remotely cost-effective to electrify all that way for 4tph to Maidenhead and just 2tph continuing on to Reading. The trains currently running to Reading, maybe even those to Maidenhead as well, would have terminated at Slough, and the local services to Reading as well as the Newbury and Didcot/Oxford services would have remained as GWR DMUs.Except that it didn't. We already had Heathrow Express and a few EMU's, plus we then had Crossrail which solved most of the Paddington suburban DMU issue. We still needed DMU's on the Oxford stoppers, Pewsey's, Basingstokes, TV branches and the Guildfords, which were not then available further West where the Turbos would have shone.
Sure. And by the same token, there are plenty of people who would include Bristol and maybe even Bournemouth in the West Country. That's why I said "Obviously it depends where you draw the boundaries"!Other East Midlands boundaries may be applied! Always dangerous drawing lines on maps used for different purposes.
![]()
Crossrail could have included electrification to Reading.I can't see Crossrail running through to Reading without GWML electrification, it wouldn't have been remotely cost-effective to electrify all that way for 4tph to Maidenhead and just 2tph continuing on to Reading. The trains currently running to Reading, maybe even those to Maidenhead as well, would have terminated at Slough, and the local services to Reading as well as the Newbury and Didcot/Oxford services would have remained as GWR DMUs.
Yep, trains will be flying in the air by then - yet the good old MML will probably have 745s/390s converted to bi-modes à la 769 (ie taking practically life-expired EMUs and shoving engines underneath them)Of course, everyone knows that's not happening this side of 3,142!!!
Syston is a very specific place to mention, as well as a place not many people would probably know where it is located? You’d expect Leicester to be mentioned.But in Lord Hendy reply he states he realises the people north of Syston won't be happy.
I'm almost willing to dream that Wigston to Syston will get done.
Syston is a very specific place to mention, as well as a place not many people would probably know where it is located? You’d expect Leicester to be mentioned.
Wishful thinking but what if RS2 is still carrying on quietly, before all tools are put down?
The same transport select committee who have recently been hearing evidence on why electrification costs so much, with a key driver being boom and bust so I suspect they were well versed in what they wanted to ask.There is a very interesting report in today's Green Signals () by Richard Bowker on the recent Transport Select Committee hearing. The MML electrification "pause" figures quite extensively. It seems to boil down to two things, from what Lord Hendy had to say. The first (and it came out in other answers he gave too) is simply, "There. is. no. money." And I've punctuated it like that because that's how he really did put it. The second is that lovely new hybrid multiple-units will deliver all the speed and comfort improvements that passengers want, so there's really no urgency to complete yet more electrification (and in any case, the significant London end of the line is done). The logic of that seems to be that there's no case for completing the wiring to Bristol, Swansea, or Oxford either!
Bowker reported some very good questioning from two or three of the Committee members which either didn't get answers or produced some contradictory answers from the Hendy side but did at least get clarification of what is now in the pipeline — and, by implication, what we may as well forget about. There was a follow-up with a very good interview with the Leicester Mayor, Sir Peter Soulsby, who brought out very clearly the East Midlands dissatisfaction (and noted that MML electrificagtion has been talked about since the early 1980s and this remained the only main line out of London not to have been properly done).
So was this Committee meeting a very clear early indication of Rachel Reeves's chickens coming home to roost? If the various savings Starmer's government tries to make can't be got past his MPs, then it's all sort of other things, including investment for the future, that will miss out.
Phase 3 is the rest for midland mainline from Wigston to Sheffield/ Nottingham.Having watched the green signals video, quoting from the DFT press release they said phase 3 was being paused. I'd thought Wigston to Syston was phase 2. I suspect I'm clutching at straws?
Once Grayling went for bi-modes the omens from Swansea and Bristol were clear.Arguably, once electrodiesel trains became a widely proposed solution (a decade ago?), the MML electrification should have been rephased to replace the Wigston-Syston segment with Sheffield or similar, where there are more trains around to benefit.
doubling of capacity over the next 50 years
Electrodiesel was going to be part of the IEP programme already in 2010.Once Grayling went for bi-modes the omens from Swansea and Bristol were clear.
Well... the railway industry had its opportunity to get an all new railway, fit for the future, and look how that went!Electrifying around conurbations with old track layouts designed and built for Victorian needs, partially hacked up, land sold off and then parts rebuilt over the next 60 years for another market that has itself moved on - is incredibly expensive! Certainly to do it right.
It's not so much the electric catenary and supply but all the trackwork, bridges, drainage and signalling that needs replacing to be ready to support a doubling of capacity over the next 50 years. Penny wise, pound foolish - so we end up not spending many pennies. Except with railways we always seem to, eventually!