TT-ONR-NRN
Veteran Member
They would, it’s fifteen minutes to Cardiff from either side…Yes, the 398's without toilets would suit the Coryton/Penarth/Caerphilly line down to a tee.
They would, it’s fifteen minutes to Cardiff from either side…Yes, the 398's without toilets would suit the Coryton/Penarth/Caerphilly line down to a tee.
Maybe they'll make the last trains of the night Flirts with toilets?I was being serious, the journeys are very short. The only people who use the toilets now are fare dodgers!
I know this has been said many times, but can you imagine the problems on a Friday/Saturday night up to Rhymney on the 398's.
It all very well TfW saying toilets are on stations on 15 minutes apart. Firstly they won't be open at 11pm and even if they are, not a lot of use if you are on the last train of the night.
How do you know the station toilets won't be open at 11pm?I was being serious, the journeys are very short. The only people who use the toilets now are fare dodgers!
I know this has been said many times, but can you imagine the problems on a Friday/Saturday night up to Rhymney on the 398's.
It all very well TfW saying toilets are on stations on 15 minutes apart. Firstly they won't be open at 11pm and even if they are, not a lot of use if you are on the last train of the night.
Ok I don't know, but can you imagine the press coverage if someone ODs in one at 2am on an unmanned railway station and are found the next morning? It wouldn't be the direct fault of TfW, but I would say they already have run though various scenarios on opening times and risk mitigation.How do you know the station toilets won't be open at 11pm?
As far as I know most will be pod toilets - I see no reason for these to not be open 24/7.
There's no confirmed timescale for 231's entering service on the Mainline until the 398's come into service, so starting training would be counter productive if they end up not being used for some time.The one thing I find odd is why the 231s aren't being used (especially during the Rhymney closures) on mainline services (obviously training but it's the perfect time to do this), only 4 231s were used today (1/7/9/11).
5 mph TSR means the drive of shame into CorytonI took this video of 756005 at Coryton this lunchtime arriving and departing. Pulled in very gingerly. Shows the pantagraph up and the level boarding working well.
If mainline drivers were trained on 231s, they could enter service on Cardiff - Barry - Bridgend and see off the 150s on this route as soon as enough drivers are trained on 231s for the hourly VoG services.There's no confirmed timescale for 231's entering service on the Mainline until the 398's come into service, so starting training would be counter productive if they end up not being used for some time.
It looks like Barry Island - Caerphilly 150 diagrams then work Caerphilly - Bridgend seservices.
It's a terrible time to do training. The trains might be available but the crew to be trained aren't. Traincrew availability is always at its lowest in summer holidays, and the amount of people able to be released at one time for training is normally cut back as a result.The one thing I find odd is why the 231s aren't being used (especially during the Rhymney closures) on mainline services (obviously training but it's the perfect time to do this), only 4 231s were used today (1/7/9/11).
It wouldn't make any difference. When the Rhymney line is open, the class 231 are diagrammed to the max. The overall number of class 150 diagrams would not reduce and won't really change until the class 398 start running.If mainline drivers were trained on 231s, they could enter service on Cardiff - Barry - Bridgend and see off the 150s on this route as soon as enough drivers are trained on 231s for the hourly VoG services.
231008 was on Canton's wheel lathe today by the looks of it, passed it in the morning and afternoon. A few others seem to be hiding around Canton's sidings and inside the maintenance shed.The final Class 756 entered service this morning (756003): https://www.realtimetrains.co.uk/service/gb-nr:G56824/2025-07-24/detailed
The one thing I find odd is why the 231s aren't being used (especially during the Rhymney closures) on mainline services (obviously training but it's the perfect time to do this), only 4 231s were used today (1/7/9/11).
I'm reasonably certain you get a time limit on them and then the door automatically opens as a failsafe.Ok I don't know, but can you imagine the press coverage if someone ODs in one at 2am on an unmanned railway station and are found the next morning? It wouldn't be the direct fault of TfW, but I would say they already have run though various scenarios on opening times and risk mitigation.
Thanks for letting us knowThe final Class 756 entered service this morning (756003): https://www.realtimetrains.co.uk/service/gb-nr:G56824/2025-07-24/detailed
The one thing I find odd is why the 231s aren't being used (especially during the Rhymney closures) on mainline services (obviously training but it's the perfect time to do this), only 4 231s were used today (1/7/9/11).

756005 is back out on the Coryton - Penarth route today. When the 756/1s first started on the TAM lines it took a while for them to appear on weekends whereas for Coryton it's been immediate. Hopefully this means it won't be long before all the Coryton / Caerphilly to Penarth diagrams are 756/0s as the 3 car units have been in service for a while now and therefore possibly don't need Stadler support any more.
Didn't last, cancelled earlier on due to fault, apparently!756005 is back out on the Coryton - Penarth route today. When the 756/1s first started on the TAM lines it took a while for them to appear on weekends whereas for Coryton it's been immediate. Hopefully this means it won't be long before all the Coryton / Caerphilly to Penarth diagrams are 756/0s as the 3 car units have been in service for a while now and therefore possibly don't need Stadler support any more.
Looks like it might have been a problem with the unit as 756002 is now on the Coryton/Penarth/Caerphilly diagram this evening - presumably instead of 756005.Didn't last, cancelled earlier on due to fault, apparently!
Edit: Ignore me, something wrong with a few things, could be unrelated to the unit itself.
It depends how close you are to the Power Pack vehicle. If you're near it on a 231 (like I always am on a 231, 755/4 or 755/3), you'll always hear the four, four or two V8s, but on a 756, I don't make an effort to be near the Power Pack vehicle (as the singular V8 is rarely used) so I focus on the electric traction sounds.I find it hard to tell the 231's and 756's apart when on board!
Did the full run up and down on the first day, it accelerates quite fast when doing non-stop between Queen Street and Caerphilly. The Coryton and Penarth sections, as you've mentioned, are quite slow as to be expected.Has my first ride on a 3 car 756 today (also my first ever journey on the Coryton line). I find it hard to tell the 231's and 756's apart when on board!
There were a couple of other enthusiasts on board as they did the same as me, walked up the steps to take a picture of the 756 from the bridge at Coryton station and then got back on the same train. It felt like the train only got to speed between Heath and Cardiff Queen Street with the frequent stops. Still a much improved experience then a Sprinter or Pacer. I really like the 231's and 756's.
Have you or anyone got any photos looking down onto the roof of the Power Pack vehicle of a 231 or 756? I still haven't got round to doing so myself - I've only done so with a 755/4, and I really liked how the 4 exhaust pipes looked. I can tell from the ground that 231s and 756s have different exhaust pipes to 755s, so I'd like to see what they look like from above (a 756 only has a singular pipe, but it will still be the same different design).There were a couple of other enthusiasts on board as they did the same as me, walked up the steps to take a picture of the 756 from the bridge at Coryton station and then got back on the same train.
Did the full run up and down on the first day, it accelerates quite fast when doing non-stop between Queen Street and Caerphilly. The Coryton and Penarth sections, as you've mentioned, are quite slow as to be expected.