The Edinburgh to Glasgow electrification scheme was meant to include a major upgrade to the existing line from Winchburgh to Dalmeny, with grade separated junctions and a west to south curve to allow Edinburgh to Glasgow services to run via the new Edinburgh Gateway station.
Disappointing they never followed through. They could’ve had electric E-G services via Gateway and preemptively electrified the section which is currently being… hopefully we’ll see that coming to fruition when Winchburgh station starts being built. Maybe even a Dundee to Glasgow train via Fife using that line.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

waverley47

Member
Joined
17 Apr 2015
Messages
852
Disappointing they never followed through. They could’ve had electric E-G services via Gateway and preemptively electrified the section which is currently being… hopefully we’ll see that coming to fruition when Winchburgh station starts being built. Maybe even a Dundee to Glasgow train via Fife using that line.

Regards the Almond Chord:

It depends. The Almond Chord was a very specific solution to a very specific problem; inability to timetable paths efficiently through platforms 3&4 at Haymarket.

There are four recurring paths in each hour from the Slateford direction, and ten recurring paths in each hour from Newbridge Junction, plus extras.* The combination of flat junctions at Haymarket West, Newbridge and Polmont junctions means that the south lines have become very difficult to timetable, and the timetable is different in each hour, which is a symptom of these inefficiencies.

*note that, even though 4tph on the Falkirk High and Bathgate routes isn't in place all day, the paths are still there and the desire to reinstate these is strong. Future projected service increases from the WCML, post HS2, also have to be taken into account.

Also note that there are services with paths threaded around other services, like the LNER Inverness services and the EDB-GLC via Carstairs services, which makes it even more complicated.


Platforms 8-14 at Waverley, and the south lines to Haymarket are stressed and congested, and the timetable prior to the post-Covid reductions was very tenuous.

The Almond Chord was planned in the original iteration of the EGIP, where we aspired for 6tph through Falkirk High doing the shuttles. We needed to balance the load between the north and south lines at Haymarket, and the Almond Chord was out way of doing that. It had beneficial side effects of allowing space in the timetable for calls at Winchburgh station, and allowing trains from the west to serve Edinburgh Gateway.

With post-Covid service level reductions, also in particular due to staff shortages, the imminent need for the Almond Chord has subsided. If and when there are 4tph on both the Falkirk High and Bathgate lines, then the plan will need to be looked at again.

It's likely that the plan will be resurrected at some point, but not for a while. I think the most telling thing is that we never even got to the point of approving a final design, but we did safeguard the alignment, so it's still there on a shelf ready to be dusted off.

Regards Dundee - Glasgow services:

The problem is, theres already a line between Fife and Glasgow, it's the Winchburgh Chord. For many years there was 1tpd in each direction from Kirkcaldy to Queen Street, and the fact that it was only ever 1tpd in each direction, and that it has now stopped (it was a pre-Covid cut) means that there's insufficient demand, or capacity, or both.
 

CamLewWri

Member
Joined
27 Sep 2018
Messages
5
Location
Linlithgow
Disappointing they never followed through. They could’ve had electric E-G services via Gateway and preemptively electrified the section which is currently being… hopefully we’ll see that coming to fruition when Winchburgh station starts being built. Maybe even a Dundee to Glasgow train via Fife using that line.
Construction of Winchburgh station is unlikely to reignite interest in the Almond chord as it is now to be sited on the E&G, just north of the original pre-1930 station site. The 2tph Dunblane services will stop at Winchburgh which wasn't an option previously. Since electrification, the improved performance of the 385s has given some extra slack in the timetable with the current Dunblane services already being held at both Linlithgow and Newbridge to leave space for the extra stop.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,662
Regards the Almond Chord:



Regards Dundee - Glasgow services:

Don't forget though since all this work was carried out. Edinburgh - Invernes services now also run via this route. At the time earlier studies were carried out they ran via Ladybank and Kirkcaldy and thus had no interaction with this route or the A to B route via Bathgate.
 

waverley47

Member
Joined
17 Apr 2015
Messages
852
Don't forget though since all this work was carried out. Edinburgh - Invernes services now also run via this route. At the time earlier studies were carried out they ran via Ladybank and Kirkcaldy and thus had no interaction with this route or the A to B route via Bathgate.

That's mainly to do with timekeeping on the Ladybank to Perth section. Previously, with the uptick in services down the single tracks from Inverness, and the initial poor reliability of the HSTs, especially in autumn and winter, meant that southbound Edinburgh services were presenting late at Hilton Jn.

Sending them via Stirling gives Gleneagles a direct Edinburgh service, which is desirable for the golfers, and increased reliability somewhat.
 