And the 810s are not. As importantly, we know there are material design defects in the 80x design, requiring significant rework, and which point towards the manufacturers trying to meet impossible procurement demands.For example the 80x has been selected as a relatively standard type for intercity trains. Newer units could be fitted with a battery pack instead of a GU and engines and interior fittings can evolve over time to reflect lessons and improvements. Nobody is arguing that they should all be exactly the same for decades, but an evolutionary approach is required, instead of a revolutionary one. (EMR should have just ordered 9 car 805s). The 805 appears to have been a pretty good example of a successful evolution of a trainset.
Which is achieved by applying standards and insisting that they're consistently delivered to be authorised to run on the network.You'll never get down to one design for everything, but things like the tiny fleet of 12 397s ought to have been avoided, and interoperability between manufacturers should be prioritised.
== Doublepost prevention - post automatically merged: ==
There's a separate question here, where procurement needs to balance precise specs (so you can actually run some decent acceptance testing) against flexibility to allow manufacturers to respond with the best value option.Not necessarily vanity driven - just driven by the kind of short-term compartmentalised thinking that pervades our culture (and legislation) than come. Rather than come together and come up with a design that satisfies 80% of everyone’s requirements (and can be customised at surface level to satisfy a bit more), everyone insists on 99-100% at vastly higher expense because “I can only claim to have won if I get 100% of what I wanted and am visibly grinding everyone else’s faces in the dust”.