How likely is it that the above would be given as a cancellation reason relatively last minute? Or is it generally known quite early on that a service won't run because the rolling stock is unavailable due to repairs?
The reason I'm asking is that, next Monday (30 June), we're planning to catch the 8.26 from Aberystwyth to get to Porthmadog at 10:51, changing at Dovey Junction (5 minute changeover). Looking at On Time Trains I can see that the 8.26 has on occasion been cancelled for the above reason, whereas the 7.28 from Aberystwyth has a much better reliability record. That may simply be coincidence and there is nothing to be read into to it.
If I could see in the morning that the 8.26 had already been cancelled I'd get the 7.28, which would mean a bit of a wait at Machynlleth, but better than getting to Porthmadog 2 hours late. But if I knew the 8.26 was running I'd much rather get that. So I guess my question is: How likely is it (if indeed it's possible to say) that the 8.26 would be cancelled for the above reason and that only made known after the 7.28 had already left?
The reason I'm asking is that, next Monday (30 June), we're planning to catch the 8.26 from Aberystwyth to get to Porthmadog at 10:51, changing at Dovey Junction (5 minute changeover). Looking at On Time Trains I can see that the 8.26 has on occasion been cancelled for the above reason, whereas the 7.28 from Aberystwyth has a much better reliability record. That may simply be coincidence and there is nothing to be read into to it.
If I could see in the morning that the 8.26 had already been cancelled I'd get the 7.28, which would mean a bit of a wait at Machynlleth, but better than getting to Porthmadog 2 hours late. But if I knew the 8.26 was running I'd much rather get that. So I guess my question is: How likely is it (if indeed it's possible to say) that the 8.26 would be cancelled for the above reason and that only made known after the 7.28 had already left?
